Powered By Kitlog Pro v2.0
Peters Web Site
RV-9A
03 Empennage
Work Logs Found:
145
Category Work Time:
324 Hours
Date
Hours
Work Log Summary
Details
07-05-2024
2.00
Trim Tab Actuator
Details
06-29-2024
2.00
2: Trim Tab Actuator
Details
04-30-2023
2.00
1: Empennage Fairing
Details
04-29-2023
1.00
1: Empennage Fairing
Details
05-08-2021
5.00
Reassembled the Empennage
Details
06-27-2020
3.00
Empennage Fairing
Details
06-21-2020
5.00
Empennage Fairing
Details
06-14-2020
3.00
1: Empennage Fairing
Details
04-12-2020
2.00
2: Refitting the Elevators
Details
04-12-2020
6.00
1: Empannage Painting
Details
04-04-2020
2.00
Empennage Fairing Nutplates
Details
03-21-2020
2.00
2: Empennage Fairing
Details
03-21-2020
2.00
1: Empennage Fairing
Details
03-20-2020
2.50
Reassembling the Empennage
Details
10-06-2019
2.50
1: Vertical Stabiliser Alignment
Details
09-22-2019
1.00
1: Vertical Stabiliser Tip
Details
09-21-2019
2.00
1: Vertical Stabiliser Tip
Details
09-15-2019
2.00
3: Rudder Tip
Details
09-14-2019
4.00
1: Elevator, Stabiliser, Rudder Tips
Details
09-08-2019
2.00
2: Elevator Tips
Details
09-08-2019
3.00
1: Elevator Tips
Details
09-07-2019
2.50
1: Elevator and Stabiliser Tips
Details
07-21-2019
3.00
Rudder and Elevator Tips
Details
07-20-2019
4.00
2: Rudder Fairings
Details
07-14-2019
2.00
2: Bottom Rudder Fairing
Details
07-13-2019
1.00
3: Bottom Rudder Fairing
Details
10-14-2018
1.50
3: Vertical Stabiliser Brackets
Details
06-16-2018
3.00
1: Installing the Rudder Stop
Details
06-04-2018
1.50
Installing the Rudder Stop
Details
06-03-2018
2.50
3: Installing the Forward Elevator Control Rod
Details
06-03-2018
2.00
2: Modifying Seat Floor Ribs
Details
06-03-2018
2.00
1: Fitting the Aft Elevator Control Rod
Details
06-02-2018
1.50
4: Elevator Control Rods
Details
06-02-2018
2.00
3: Mounting the Rudder
Details
06-02-2018
2.00
2: Mounting the Vertical Stabiliser
Details
06-02-2018
3.00
1: Mounting the Vertical Stabiliser
Details
06-01-2018
2.00
Attaching the Vertical Stabiliser
Details
05-28-2018
1.00
Elevator Control Rods
Details
05-27-2018
2.50
2: Elevator Control Rods
Details
05-27-2018
1.50
1: Building the Empennage
Details
05-26-2018
2.00
3: Attaching the Elevators
Details
05-26-2018
4.50
2: Bolting on the Horizontal Stabiliser
Details
07-09-2017
4.50
Horizontal Stabiliser Tips
Details
07-02-2017
4.00
Horizontal Stabiliser Tips
Details
07-01-2017
3.00
More Filling and Sanding
Details
06-25-2017
4.00
Mixing, Filling, Sanding...
Details
06-18-2017
4.00
Fairing Elevator and Rudder Tips
Details
06-12-2017
3.00
3: Rudder Tips
Details
06-12-2017
1.50
1: Elevator Wing Tip Fairing
Details
06-11-2017
3.00
Elevator Wing Tip Fairing
Details
06-10-2017
1.50
1: Elevator Tip Fairing
Details
05-31-2017
1.50
Left Elevator Wing Tip
Details
05-14-2017
1.50
2: Right Elevator Wing Tip
Details
05-14-2017
1.00
1: Test Fitted Both Elevators
Details
05-06-2017
3.00
Elevator Counterweights
Details
04-30-2017
3.00
3: Trim Tab Assembly
Details
04-30-2017
1.00
2: Trim Tab Servo Mount
Details
04-30-2017
1.00
1: Left Elevator Trailing Edge
Details
04-25-2017
0.50
4: Left Elevator Trailing Edge
Details
04-25-2017
2.50
3: Trim Tab Assembly
Details
04-25-2017
1.00
2: Almost a Disaster
Details
04-25-2017
2.00
1: Trim Tab Servo Motor
Details
04-24-2017
2.50
3: Building the Trim Tab
Details
04-24-2017
2.00
2: Trim Tab Jigs and Tools
Details
04-24-2017
1.50
1: Trim Tab Stiffeners
Details
04-22-2017
2.00
2: Primed the Trim Tab Skin
Details
04-22-2017
3.00
1: Continuing with the Left Elevator
Details
04-21-2017
1.00
Right Elevator Trailing Edge
Details
04-20-2017
1.00
The Little Suprise Piece
Details
04-19-2017
1.00
Left Elevator Assembly
Details
04-17-2017
1.50
3: Left Elevator Assembly
Details
04-17-2017
1.50
2: Left Elevator Counterbalance
Details
04-17-2017
1.50
1: Right Elevator Trailing Edge
Details
04-16-2017
2.50
3: Right Elevator Trailing Edge
Details
04-16-2017
2.00
2: Right Elevator Spar
Details
04-15-2017
2.00
Elevator Stiffeners and Spar
Details
04-14-2017
1.50
Match Drilling the Left Elevator
Details
04-09-2017
3.00
Building the Right Elevator
Details
03-27-2017
1.00
Continued with Right Elevator
Details
03-26-2017
1.50
2: Assembling the Right Elevator
Details
03-26-2017
3.50
1: Match Drilling the Right Elevator
Details
03-25-2017
6.00
A Big Day of Prepping
Details
03-15-2017
1.00
Continued Dimpling and Deburring
Details
03-14-2017
1.50
Continued Alodining Elevator Stiffeners
Details
03-13-2017
6.00
Building the Elevator Counterbalance Arms
Details
03-12-2017
6.50
Match Drilling and Dimpling
Details
03-11-2017
3.00
4: Cutting the Elevator Stiffeners to Size
Details
03-11-2017
1.00
3: Finishing the Rudder Leading Edge
Details
03-11-2017
1.00
2: Rolling the Rudder Leading Edge
Details
03-11-2017
1.00
1: Riveting the Rudder Trailing Edge
Details
03-08-2017
1.00
2: Gluing up the Rudder Trailing Edge
Details
03-08-2017
1.00
1: Preparing the Rudder Trailing Edge
Details
03-04-2017
5.00
Assembling the Rudder
Details
03-03-2017
2.00
Primed and Ready
Details
02-22-2017
1.50
Alodined Rudder Parts
Details
02-20-2017
1.50
Countersinking the Rudder Trailing Edge Wedge
Details
02-19-2017
1.00
3: Dimpling Difficult Holes
Details
02-19-2017
3.00
2: Rudder Assembly and Dimpling
Details
02-19-2017
2.00
1: Back Riveting the Rudder Stiffeners
Details
02-18-2017
2.50
2: Assembling the Rudder Frame
Details
02-18-2017
2.50
1: Painting and Alodining Rudder Parts
Details
02-17-2017
3.00
Preparing the Rudder Skins
Details
02-14-2017
1.00
Finished off the Rudder Stiffeners
Details
02-13-2017
1.50
Started the Rudder stiffeners
Details
02-12-2017
1.00
3: Finished the Vertical Stabiliser
Details
02-12-2017
1.00
2: Provision for Tail Strobe/Nav Light
Details
02-12-2017
2.50
1: Vertical Stabiliser Coming Together
Details
02-11-2017
1.00
2: No compromises
Details
02-11-2017
2.00
1: Assembling vertical stabiliser
Details
02-06-2017
0.50
Centre Hinge Bracket
Details
01-29-2017
2.50
2: Spray Painting
Details
01-29-2017
1.50
1: Alodining
Details
01-28-2017
4.00
Drilling and Dimpling the Vertical Stabiliser
Details
01-27-2017
2.00
Prepping the VS Ribs
Details
01-26-2017
2.50
Finished the Horizontal Stabiliser
Details
01-25-2017
1.00
2: A Start on the Vertical Stabiliser
Details
01-25-2017
1.50
1: Final Stages of HS fabrication
Details
01-15-2017
5.00
Horizontal Stabiliser is almost done
Details
01-14-2017
6.00
Completed one side of the horizontal stabiliser
Details
01-13-2017
1.50
First skin rivets
Details
01-08-2017
3.00
Dimpling and priming HS skins
Details
01-07-2017
2.50
Dimpling the HS skins
Details
01-02-2017
1.00
2: Starting the Vertical Stabiliser
Details
01-02-2017
1.50
2: Rivetting the HS Spars
Details
01-02-2017
2.00
1: Rivet Gun Practice
Details
01-01-2017
2.00
My First Rivet
Details
12-31-2016
1.50
Primed HS Spars
Details
12-30-2016
2.00
Alodined HS Spars
Details
12-17-2016
1.50
2: Priming Wing Ribs
Details
12-17-2016
2.50
1: Dimpling and Alodine
Details
12-16-2016
0.50
Dimpling Pliers Arrived
Details
12-04-2016
1.00
More Countersinking
Details
12-03-2016
1.50
2: Right Horizontal Stabiliser Assembly
Details
12-03-2016
2.00
1: Countersinking
Details
12-01-2016
1.50
Disassemble and deburr
Details
11-27-2016
4.50
Assembled Left Horizontal Stabiliser
Details
11-26-2016
2.00
Deburring
Details
11-23-2016
2.00
Disassemble and deburr
Details
11-22-2016
2.00
Assembled ribs/spars
Details
11-21-2016
1.00
Squaring wing ribs
Details
11-20-2016
4.00
2: Deburring wing ribs
Details
11-20-2016
2.00
1: Front Spar Attachment Angles
Details
11-19-2016
3.00
Front Spars
Details
10-04-2016
1.00
Empennage Kit Arrived
Details
09-21-2016
0.00
First Order
Details
SITE NAVIGATION
Contact Builder
RV-9A Home
Category
# Logs
# Hours
All
979
2250
01 Workshop
10
02 Tools
24
4
03 Empennage
145
324
04 Wings
84
236
05 Fuselage
140
392
06 Firewall
33
79
07 Engine/Propellor
134
359
08 Avionics
38
118
09 Lighting
29
70
10 Electrical
35
88
11 Instrument Panel
69
184
12 Fuel System
27
65
13 Canopy
75
186
14 Landing Gear
16
46
15 Cockpit Interior
20
46
17 Painting
1
3
28 CofA
7
19
29 Regulatory
4
17
49 Miscellaneous
37
14
50 YMTG Hangar
51
Copyright © 2001-2024 Matronics. All Rights Reserved.