KitLog pro

Powered By Kitlog Pro v2.0

Dr. Pete's Xenos Build
Work Logs Found: 60
Category Work Time: 261 Hours
 Date
Hours
Work Log Summary

Details

 04-06-2019
0.75
Tighten/replace nuts
Details

 03-30-2019
0.50
Replace canvas door bolts
Details

 03-16-2019
1.00
Repair torn grommets
Details
       

 12-01-2018
2.00
Cleanup
Details

 11-13-2018
7.50
Repair Door Hangars
Details

 07-15-2018
0.50
Additional Work Light
Details

 04-29-2018
0.75
Set drain line
Details

 04-28-2018
0.75
Placed drainage pipe
Details

 04-15-2018
1.00
Clear Drainage
Details

 02-24-2018
0.75
Divert Water from Rain
Details
     

 11-24-2017
3.50
Paint and Hang Sign
Details
       

 11-22-2017
2.00
Layout Hangar Sign
Details

 09-10-2017
1.50
Front Sign Wall
Details
       

 07-16-2017
1.00
Drainage
Details
       

 07-09-2017
2.00
Repair Wheelbarrow
Details

 06-27-2017
0.75
Drainage Ditch
Details

 06-09-2017
0.20
Illuminated Exit Sign
Details
     

 06-02-2017
0.20
Exit Light
Details
     

 05-13-2017
1.50
Seal Roof
Details

 04-18-2017
1.00
Chemical Weeding
Details

 04-02-2017
4.50
Brush Cutting
Details

 03-15-2017
1.00
Door Maintenance
Details

 03-08-2017
1.00
Complete Workbench #2
Details

 02-25-2017
2.00
Door Repair, APRS
Details

 02-20-2017
3.00
Door Repair
Details

 02-11-2017
4.00
Sliding Door
Details
     

 01-28-2017
3.50
Roof Maintenance
Details

 01-22-2017
7.00
Drainage, Weatherize
Details

 01-02-2017
4.00
Hang light
Details

 01-01-2017
6.00
Wire run
Details

 12-31-2016
6.00
Conduit
Details

 12-25-2016
3.50
Platform, Electrical, Cleanup
Details

 12-23-2016
2.50
Hangar work
Details

 12-17-2016
7.50
Platform extension, wiring
Details

 12-11-2016
2.50
Prep for work platform expansion
Details

 12-10-2016
3.00
Door lockset & brush
Details
     

 12-04-2016
3.00
Install entry door
Details
       

 11-27-2016
3.50
Entry door framing
Details
       

 11-12-2016
3.00
Side Door Prep
Details

 11-11-2016
6.00
Hang Right Side Door
Details
       

 11-08-2016
3.00
Canvas door holder/slider
Details

 11-06-2016
6.00
Right side door
Details

 11-05-2016
8.00
Soft Door Hanger
Details
     

 10-23-2016
11.00
Wiring & Curtain Door
Details

 10-22-2016
8.00
Lighting conduit
Details

 10-09-2016
2.00
Prep rollers
Details

 09-29-2016
3.50
Prep for power
Details

 09-21-2016
1.50
Electrical Inspection misc
Details

 09-16-2016
10.00
Electrical Inspection fixes
Details

 09-16-2016
8.00
Electrical Inspection
Details

 09-13-2016
3.00
Grounding, install outlet
Details

 09-10-2016
7.00
Pull service wires
Details
       

 08-25-2016
8.00
Underlayment
Details
       

 08-21-2016
7.50
Roof rehab
Details
     

 08-20-2016
12.00
Roof stripped
Details
       

 08-14-2016
9.00
Conduit run
Details

 08-13-2016
12.00
Electrical
Details

 08-13-2016
16.00
Build work platform
Details
       

 08-02-2016
14.00
Clean hanger space
Details
       

 07-31-2016
6.00
Evaluation
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.