KitLog pro

Powered By Kitlog Pro v2.0

Jan Hanekoms RV Web Site
Work Logs Found: 38
Category Work Time: 88 Hours
 Date
Hours
Work Log Summary

Details

 10-26-2010
2.50
Fill sparkplug access holes
Details
       

 10-18-2010
1.50
Cut inlet baffle rubbers to fit inlet baffle
Details
       

 10-12-2010
2.00
Fit baffle rubbers to sides of inlet
Details
     

 10-11-2010
2.00
Glue bottom cowl baffle rubbers to clamping strips
Details
     

 10-09-2010
4.50
Fit cowl rubbers
Details
       

 10-06-2010
1.25
Fit carbon fibre plenum
Details
     

 10-05-2010
2.00
Instal baffle rods
Details
       

 10-02-2010
6.00
Install baffle rods
Details

 09-21-2010
2.00
Cut baffle rod threads
Details

 09-20-2010
2.25
Cut baffle rods threads
Details

 09-18-2010
5.00
Fit plug wire brackets
Details
     

 06-28-2010
2.00
Fit plug wire clamps to baffles
Details
     

 04-10-2010
2.50
Prepare baffles and plenum for priming
Details

 03-16-2010
1.00
Prime baffles
Details

 03-06-2010
3.00
Prepare plenum and baffles for priming
Details

 01-18-2010
2.00
Finish cooling baffles
Details

 01-14-2010
1.50
Fit scat tube flange to CB1007A baffle
Details

 01-12-2010
2.50
Trim cooling baffles to fit under top cowl
       

 01-11-2010
2.00
Trim enjine baffles
Details

 12-17-2009
2.50
Fabricate clips and trim baffles
Details

 12-15-2009
3.00
Fit conical gussets to baffles
Details

 12-07-2009
1.00
Measure and drill conical gusset rivet pattern
Details

 11-30-2009
2.00
Fabricate conical gussets left and right
Details
       

 11-28-2009
2.50
Attach CB1001A to fwd left air ramp
Details
     

 11-26-2009
2.00
Fit CB1001A
Details

 11-25-2009
2.00
Fit CB-1011A and CB1001A front baffles

 11-23-2009
2.50
Fit left and right air ramps and cut to fit cowl
Details

 11-19-2009
1.00
Position and match drill scat tube flange
Details

 11-14-2009
3.50
Consruct left air ramp
Details
       

 11-12-2009
2.00
Construct right air ramp
Details

 11-09-2009
2.00
Prepare CB710A fed right air ram
Details

 11-05-2009
2.00
Fit baffles and aft center support bracket
Details
     

 07-30-2009
1.00
Prepare CB1009A cylinder 1 baffle.
Details

 07-22-2009
2.00
Rivet CB1008A cylinder 5 baffle to right aft baffl
Details

 07-18-2009
1.50
Attach pitch control bracket
Details

 07-15-2009
2.00
Prepare CB1007A right aft case baffle
Details

 07-13-2009
2.00
Attach doubler plates to CB-1004A
Details

 07-11-2009
4.00
Prepare Baffle stiffeners and Cyl 5 and 6 baffles
Details










Copyright © 2001-2024 Matronics. All Rights Reserved.