Powered By Kitlog Pro v2.0
Jan Hanekoms RV Web Site
ZU-RVI RV10
Cooling Baffles
Work Logs Found:
38
Category Work Time:
88 Hours
Date
Hours
Work Log Summary
Details
10-26-2010
2.50
Fill sparkplug access holes
Details
10-18-2010
1.50
Cut inlet baffle rubbers to fit inlet baffle
Details
10-12-2010
2.00
Fit baffle rubbers to sides of inlet
Details
10-11-2010
2.00
Glue bottom cowl baffle rubbers to clamping strips
Details
10-09-2010
4.50
Fit cowl rubbers
Details
10-06-2010
1.25
Fit carbon fibre plenum
Details
10-05-2010
2.00
Instal baffle rods
Details
10-02-2010
6.00
Install baffle rods
Details
09-21-2010
2.00
Cut baffle rod threads
Details
09-20-2010
2.25
Cut baffle rods threads
Details
09-18-2010
5.00
Fit plug wire brackets
Details
06-28-2010
2.00
Fit plug wire clamps to baffles
Details
04-10-2010
2.50
Prepare baffles and plenum for priming
Details
03-16-2010
1.00
Prime baffles
Details
03-06-2010
3.00
Prepare plenum and baffles for priming
Details
01-18-2010
2.00
Finish cooling baffles
Details
01-14-2010
1.50
Fit scat tube flange to CB1007A baffle
Details
01-12-2010
2.50
Trim cooling baffles to fit under top cowl
01-11-2010
2.00
Trim enjine baffles
Details
12-17-2009
2.50
Fabricate clips and trim baffles
Details
12-15-2009
3.00
Fit conical gussets to baffles
Details
12-07-2009
1.00
Measure and drill conical gusset rivet pattern
Details
11-30-2009
2.00
Fabricate conical gussets left and right
Details
11-28-2009
2.50
Attach CB1001A to fwd left air ramp
Details
11-26-2009
2.00
Fit CB1001A
Details
11-25-2009
2.00
Fit CB-1011A and CB1001A front baffles
11-23-2009
2.50
Fit left and right air ramps and cut to fit cowl
Details
11-19-2009
1.00
Position and match drill scat tube flange
Details
11-14-2009
3.50
Consruct left air ramp
Details
11-12-2009
2.00
Construct right air ramp
Details
11-09-2009
2.00
Prepare CB710A fed right air ram
Details
11-05-2009
2.00
Fit baffles and aft center support bracket
Details
07-30-2009
1.00
Prepare CB1009A cylinder 1 baffle.
Details
07-22-2009
2.00
Rivet CB1008A cylinder 5 baffle to right aft baffl
Details
07-18-2009
1.50
Attach pitch control bracket
Details
07-15-2009
2.00
Prepare CB1007A right aft case baffle
Details
07-13-2009
2.00
Attach doubler plates to CB-1004A
Details
07-11-2009
4.00
Prepare Baffle stiffeners and Cyl 5 and 6 baffles
Details
SITE NAVIGATION
Contact Builder
ZU-LOL RV7 Home
ZU-RVI RV10 Home
Category
# Logs
# Hours
All
778
6395
Avionics
20
313
Baggage Area
6
18
Canopy
68
485
Cooling Baffles
38
273
Cowling
33
294
Doors
47
261
Electrical
42
304
Elevators
24
86
Empennage
9
199
Engine
30
284
Fairings
33
297
Firewall Forward
5
80
Fuselage
49
910
Horizontal Stab
22
156
Instrument Panel
17
154
Interior
34
146
Landing Gear
11
103
Miscellaneous
38
472
Paint
98
468
Plenum
14
24
Prop
9
79
Rudder
14
117
Rudders & Brakes
7
41
Systems
3
50
Tailcone
35
209
Trim tabs
3
14
Vertical Stab
11
74
Windscreen
7
35
Wings
51
449
ZU-XOX RV10 Home
ZU-JRV RV7A Home
ZU-JVR RV10 Home
Copyright © 2001-2024 Matronics. All Rights Reserved.