Powered By Kitlog Pro v2.0
Jan Hanekoms RV Web Site
ZU-RVI RV10
Doors
Work Logs Found:
47
Category Work Time:
120 Hours
Date
Hours
Work Log Summary
Details
10-13-2010
1.50
Door pin guides.
Details
09-10-2010
1.50
Fit LH door
Details
09-09-2010
1.50
LH Door
Details
09-08-2010
4.50
Doors
Details
07-01-2010
1.50
Sand canopy door frame
Details
04-05-2010
2.00
SB 10-1-4 Install striker plate
Details
04-05-2010
5.00
SB 10-1-4 Door Latch
Details
03-08-2010
3.00
Draw door latch
Details
03-08-2010
6.50
Door Safety Latch SB
Details
11-21-2009
1.50
Sanding around doors
Details
11-10-2009
1.50
Sand Door
Details
11-09-2009
1.50
Sand door
Details
07-08-2009
1.00
Left Door
Details
07-02-2009
4.00
Finish close out rings and paint
Details
06-25-2009
3.00
Bond door windows
Details
06-22-2009
2.00
Prepare doors for bonding of windows
Details
06-22-2009
1.00
Prepare doors for bonding of windows
Details
06-16-2009
1.50
Door finishing
Details
04-28-2009
2.50
Fit close-out rings
Details
04-27-2009
4.50
Paint doors
Details
04-25-2009
4.50
Work on doors
Details
04-24-2009
1.50
Prime doors
Details
04-23-2009
1.50
Sand RH door
Details
04-23-2009
2.50
Sand doors and canopy after filling
Details
04-20-2009
1.50
Install locks
Details
04-04-2009
2.00
Windows
Details
04-04-2009
4.00
Door gas struts
Details
04-03-2009
2.50
Drill door pin holes
Details
03-26-2009
2.50
Door Latches
Details
03-25-2009
2.00
Door Latches
Details
03-24-2009
1.50
Door latches
Details
03-24-2009
4.00
Attach latch mechanism to door
Details
03-23-2009
4.00
Fit handle assemblies
Details
03-21-2009
2.00
Match drill canopy handle to door handle assembly
Details
03-14-2009
2.00
Close out ring
Details
03-14-2009
1.00
Close out ring
Details
03-13-2009
4.00
Make close out ring
Details
03-12-2009
2.00
Trim doors
Details
03-11-2009
4.00
Attach door hinges
Details
03-10-2009
2.00
Trim Doors
Details
03-09-2009
4.00
Trim doors
Details
03-06-2009
2.00
Bond door
Details
03-05-2009
2.25
Fit and drill doors
Details
03-05-2009
4.00
Bond LH door
Details
03-04-2009
2.00
Trim doors
Details
03-03-2009
2.00
Trim doors
Details
03-02-2009
2.00
Work on doors
Details
SITE NAVIGATION
Contact Builder
ZU-LOL RV7 Home
ZU-RVI RV10 Home
Category
# Logs
# Hours
All
778
6395
Avionics
20
313
Baggage Area
6
18
Canopy
68
485
Cooling Baffles
38
273
Cowling
33
294
Doors
47
261
Electrical
42
304
Elevators
24
86
Empennage
9
199
Engine
30
284
Fairings
33
297
Firewall Forward
5
80
Fuselage
49
910
Horizontal Stab
22
156
Instrument Panel
17
154
Interior
34
146
Landing Gear
11
103
Miscellaneous
38
472
Paint
98
468
Plenum
14
24
Prop
9
79
Rudder
14
117
Rudders & Brakes
7
41
Systems
3
50
Tailcone
35
209
Trim tabs
3
14
Vertical Stab
11
74
Windscreen
7
35
Wings
51
449
ZU-XOX RV10 Home
ZU-JRV RV7A Home
ZU-JVR RV10 Home
Copyright © 2001-2024 Matronics. All Rights Reserved.