Powered By Kitlog Pro v2.0
Jan Hanekoms RV Web Site
ZU-XOX RV10
Canopy
Work Logs Found:
18
Category Work Time:
52 Hours
Date
Hours
Work Log Summary
Details
08-01-2017
3.00
Install Cabin top bolts
Details
08-01-2017
2.50
Final install cabin top
Details
07-31-2017
4.00
Sand and treat pinholes on cabin top
Details
07-31-2017
1.50
Prime cabin top
Details
07-31-2017
2.50
Overhead console
Details
07-26-2017
2.00
Prime canopy
Details
07-26-2017
4.00
Prep cabin top
Details
07-25-2017
2.00
Final paint cabin top inside
Details
07-24-2017
3.00
Prime, sand and paint first coats
Details
07-07-2017
4.00
Fill and sand cabn top inside
Details
07-06-2017
2.00
Cabin Top
Details
06-27-2017
3.50
Overhead console
Details
06-22-2017
3.50
Trim Cabin top and console
Details
05-29-2017
1.50
Cabin top
Details
05-17-2017
1.50
Remove Cabin top
Details
05-16-2017
3.00
Drill rivet strips
Details
02-06-2017
4.00
Match drill cabin top rear
Details
10-31-2016
4.00
Trim cabin top
Details
SITE NAVIGATION
Contact Builder
ZU-LOL RV7 Home
ZU-RVI RV10 Home
ZU-XOX RV10 Home
Category
# Logs
# Hours
All
143
3993
Avionics
2
313
Canopy
18
485
Cowling
17
294
Doors
10
261
Electrical
1
304
Empennage
2
199
Engine
7
284
Firewall Forward
7
80
Fuselage
59
910
Horizontal Stab
4
156
Instrument Panel
1
154
Landing Gear
8
103
Rudder
2
117
Systems
1
50
Tailcone
2
209
Vertical Stab
2
74
ZU-JRV RV7A Home
ZU-JVR RV10 Home
Copyright © 2001-2024 Matronics. All Rights Reserved.