KitLog pro

Powered By Kitlog Pro v2.0

Jan Hanekoms RV Web Site
Work Logs Found: 57
Category Work Time: 156 Hours
 Date
Hours
Work Log Summary

Details

 07-03-2014
2.00
Overhead Console Etc
Details
       

 07-02-2014
2.50
Install safety harnesses
Details
       

 07-02-2014
1.00
Install Roof harnesses
Details
       

 06-29-2014
1.50
Install LH center panel
Details
       

 06-25-2014
1.50
Wing Bolts & Tie downs
Details
       

 06-11-2014
3.50
Wing root fairings
Details
       

 06-11-2014
0.50
Connect Aileron rods
Details
     

 05-28-2014
1.50
Luggage door strut
Details
       

 05-28-2014
2.00

Details
       

 05-22-2014
3.00
Tunnel covers
Details
       

 05-22-2014
1.50
Paint Luggage Door inside
Details
       

 05-21-2014
0.50
Attache Elevator Tube
Details
     

 03-21-2014
5.00
Finishing and painting
Details
       

 03-03-2014
2.50
Side panels
Details
       

 02-22-2014
2.00
Rear Vents
Details
       

 02-20-2014
3.00
Install O2 lines
Details
       

 02-18-2014
1.00
Brake springs
Details

 09-21-2013
1.00
Visors
Details
       

 09-19-2013
2.00
Hand hold covers
Details
     

 09-18-2013
3.00
Hand hold covers
Details
       

 08-29-2013
2.00
Cleco and rivet top forward skin
Details
       

 07-24-2013
3.00
Drill cabin door openings
Details
       

 07-23-2013
3.00
Match drill cabin top
Details
       

 07-06-2013
4.00
Cowl Hinges
Details
       

 07-05-2013
2.00
Bottom instrument panel
Details
       

 07-04-2013
2.00
Rivet forward top fuselage
Details

 06-27-2013
3.00
Radio stack brackets
Details
       

 06-25-2013
2.50
Install naca ducts
Details
       

 06-25-2013
1.00
Install Cabin heat tubes
Details
       

 06-21-2013
4.00
Kiddies rear seat
Details
       

 06-20-2013
6.00
Rear seats
Details
       

 06-19-2013
2.50
Rivet rear seat floors
Details
     

 06-15-2013
2.00
Baggage Door
Details
       

 06-14-2013
5.00
Baggage door install
Details
       

 06-13-2013
3.00
Baggage cover wear blocks
Details
       

 05-31-2013
4.00
Baggage bulkhead
Details
       

 05-28-2013
2.50
Baggage door channel
Details
       

 05-22-2013
4.00
Install rear seat and luggage floors
Details
       

 05-22-2013
3.00
Install floors
Details
       

 05-08-2013
1.50
Adjust and final install Mid Elevator tube
Details
       

 05-07-2013
2.50
Remove and rotate flap Motor Bracket
Details
       

 05-01-2013
2.00
Install Control Sticks
Details
       

 05-01-2013
2.00
Control stick bases
Details
       

 04-30-2013
2.50
Make and install Elevator Idler Arm
Details
       

 04-30-2013
3.00
Fabricate Pushrods
Details
       

 04-30-2013
1.00
Assemble pushrods
Details
     

 04-23-2013
2.50
Work on tunnel cover
Details
       

 04-23-2013
3.00
Rivet front seat floor covers
Details
     

 04-20-2013
2.00
Inspection panel
Details
       

 04-19-2013
1.00
Install steps
Details
       

 04-18-2013
3.00
Park brake
Details
       

 04-18-2013
2.00
Brake lines
Details
       

 04-18-2013
3.00
Baggage door
Details
       

 04-17-2013
4.00
Fabricate mid seat rail supports
Details
     

 04-17-2013
5.00
Baggage door
Details
       

 04-11-2013
6.00
Rivet TC to Fuselage
Details
       

 04-10-2013
10.50
Attach Tailcone to fuselage
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.