Powered By Kitlog Pro v2.0
Jan Hanekoms RV Web Site
ZU-JVR RV10
Fuselage
Work Logs Found:
57
Category Work Time:
156 Hours
Date
Hours
Work Log Summary
Details
07-03-2014
2.00
Overhead Console Etc
Details
07-02-2014
2.50
Install safety harnesses
Details
07-02-2014
1.00
Install Roof harnesses
Details
06-29-2014
1.50
Install LH center panel
Details
06-25-2014
1.50
Wing Bolts & Tie downs
Details
06-11-2014
3.50
Wing root fairings
Details
06-11-2014
0.50
Connect Aileron rods
Details
05-28-2014
1.50
Luggage door strut
Details
05-28-2014
2.00
Details
05-22-2014
3.00
Tunnel covers
Details
05-22-2014
1.50
Paint Luggage Door inside
Details
05-21-2014
0.50
Attache Elevator Tube
Details
03-21-2014
5.00
Finishing and painting
Details
03-03-2014
2.50
Side panels
Details
02-22-2014
2.00
Rear Vents
Details
02-20-2014
3.00
Install O2 lines
Details
02-18-2014
1.00
Brake springs
Details
09-21-2013
1.00
Visors
Details
09-19-2013
2.00
Hand hold covers
Details
09-18-2013
3.00
Hand hold covers
Details
08-29-2013
2.00
Cleco and rivet top forward skin
Details
07-24-2013
3.00
Drill cabin door openings
Details
07-23-2013
3.00
Match drill cabin top
Details
07-06-2013
4.00
Cowl Hinges
Details
07-05-2013
2.00
Bottom instrument panel
Details
07-04-2013
2.00
Rivet forward top fuselage
Details
06-27-2013
3.00
Radio stack brackets
Details
06-25-2013
2.50
Install naca ducts
Details
06-25-2013
1.00
Install Cabin heat tubes
Details
06-21-2013
4.00
Kiddies rear seat
Details
06-20-2013
6.00
Rear seats
Details
06-19-2013
2.50
Rivet rear seat floors
Details
06-15-2013
2.00
Baggage Door
Details
06-14-2013
5.00
Baggage door install
Details
06-13-2013
3.00
Baggage cover wear blocks
Details
05-31-2013
4.00
Baggage bulkhead
Details
05-28-2013
2.50
Baggage door channel
Details
05-22-2013
4.00
Install rear seat and luggage floors
Details
05-22-2013
3.00
Install floors
Details
05-08-2013
1.50
Adjust and final install Mid Elevator tube
Details
05-07-2013
2.50
Remove and rotate flap Motor Bracket
Details
05-01-2013
2.00
Install Control Sticks
Details
05-01-2013
2.00
Control stick bases
Details
04-30-2013
2.50
Make and install Elevator Idler Arm
Details
04-30-2013
3.00
Fabricate Pushrods
Details
04-30-2013
1.00
Assemble pushrods
Details
04-23-2013
2.50
Work on tunnel cover
Details
04-23-2013
3.00
Rivet front seat floor covers
Details
04-20-2013
2.00
Inspection panel
Details
04-19-2013
1.00
Install steps
Details
04-18-2013
3.00
Park brake
Details
04-18-2013
2.00
Brake lines
Details
04-18-2013
3.00
Baggage door
Details
04-17-2013
4.00
Fabricate mid seat rail supports
Details
04-17-2013
5.00
Baggage door
Details
04-11-2013
6.00
Rivet TC to Fuselage
Details
04-10-2013
10.50
Attach Tailcone to fuselage
Details
SITE NAVIGATION
Contact Builder
ZU-LOL RV7 Home
ZU-RVI RV10 Home
ZU-XOX RV10 Home
ZU-JRV RV7A Home
ZU-JVR RV10 Home
Category
# Logs
# Hours
All
385
6382
Avionics
22
313
Canopy
20
485
Cooling Baffles
10
273
Cowling
28
294
Doors
29
261
Electrical
22
304
Elevators
11
86
Empennage
5
199
Engine
18
284
Fairings
19
297
Firewall Forward
7
80
Fuselage
57
910
Horizontal Stab
10
156
Instrument Panel
5
154
Interior
5
146
Landing Gear
10
103
Miscellaneous
14
472
Paint
1
468
Prop
4
79
Rudder
11
117
Rudders & Brakes
4
41
Systems
6
50
Tailcone
23
209
Test Flights
1
19
Trim tabs
3
14
Vertical Stab
7
74
Windows
3
10
Windscreen
1
35
Wings
29
449
Copyright © 2001-2024 Matronics. All Rights Reserved.