Powered By Kitlog Pro v2.0
Jan Hanekoms RV Web Site
ZU-LOL RV7
Fuselage
Work Logs Found:
22
Category Work Time:
70 Hours
Date
Hours
Work Log Summary
Details
12-21-2013
4.00
Map box
Details
12-19-2013
2.00
Pitot tube
Details
12-18-2013
5.00
Install cable bracket
Details
12-11-2013
3.00
Final Assembly
Details
12-03-2013
2.00
Fuel system
Details
11-26-2013
1.00
Paint cover
Details
09-19-2013
2.00
Fit Plenum
Details
05-22-2013
4.00
Root fairing
Details
03-07-2013
1.50
Vent hoses
Details
03-07-2013
8.00
Install crotch strap brackets
Details
01-18-2013
3.00
Side panels
Details
01-18-2013
2.00
Cap covers
Details
11-29-2012
2.00
Aileron Trim
Details
11-28-2012
1.50
Vents
Details
11-28-2012
8.00
Install fuel system
Details
11-07-2012
2.50
Paint inside cabin
Details
11-07-2012
3.00
Paint flap cover channels
Details
10-17-2012
1.00
Shoulder harness cable sliders
Details
10-09-2012
3.00
Static System
Details
10-09-2012
2.00
Install antennas
Details
07-19-2012
6.00
Stirp and cut apart
Details
03-16-2012
4.00
Strip Firwall Forward
Details
SITE NAVIGATION
Contact Builder
ZU-LOL RV7 Home
Category
# Logs
# Hours
All
195
5571
Avionics
21
313
Baggage Area
1
18
Canopy
4
485
Cooling Baffles
11
273
Cowling
4
294
Electrical
19
304
Elevators
2
86
Empennage
6
199
Engine
10
284
Fairings
10
297
Fuselage
22
910
Horizontal Stab
1
156
Instrument Panel
1
154
Landing Gear
4
103
Miscellaneous
23
472
Paint
3
468
Prop
3
79
Rudder
7
117
Rudders & Brakes
2
41
Systems
8
50
Test Flights
1
19
Wings
32
449
ZU-RVI RV10 Home
ZU-XOX RV10 Home
ZU-JRV RV7A Home
ZU-JVR RV10 Home
Copyright © 2001-2024 Matronics. All Rights Reserved.