Powered By Kitlog Pro v2.0
Jan Hanekoms RV Web Site
ZU-RVI RV10
Fuselage
Work Logs Found:
49
Category Work Time:
128 Hours
Date
Hours
Work Log Summary
Details
11-27-2010
4.00
Wings attach
Details
11-26-2010
4.00
Rudder
Details
11-26-2010
2.00
Pitch servo mod
Details
11-25-2010
4.00
Final attach trim system
Details
11-24-2010
4.50
Final attach HS and VS
Details
03-03-2010
2.00
Brakes
Details
12-04-2009
5.00
Prime fuselage
Details
12-03-2009
3.50
Prepare for priming
Details
12-03-2009
2.00
Prepare for priming
Details
11-27-2009
1.00
Fit lower intrument panel
Details
11-23-2009
4.00
Windscreen
Details
07-08-2009
0.50
Fuel Flow sender bracket
Details
04-28-2009
1.50
Wing root fairing supports
Details
02-21-2009
3.50
Fuel system
Details
02-20-2009
2.50
Fuel System
Details
02-19-2009
3.00
Cowl hinges
Details
02-17-2009
2.00
Cowl hinges
Details
02-12-2009
1.50
Rivet seat-backs
Details
02-10-2009
2.50
Cowl Hinges
Details
02-09-2009
2.00
Rivet seat-backs
Details
02-09-2009
1.00
Rivet forward skin
Details
02-07-2009
5.00
Assemble seat-backs
Details
02-05-2009
1.00
Measure and cut angles for seat-backs
Details
02-04-2009
2.50
Flap System
Details
02-04-2009
2.00
Flap System
Details
02-04-2009
4.00
Flap System
Details
02-03-2009
3.00
Control System
Details
02-02-2009
2.00
Rivet seat floors and install nutplates
Details
02-02-2009
3.00
Manufacture Control tubes
Details
02-02-2009
1.50
Elevator Idler
Details
02-02-2009
1.00
Cabin Heat box
Details
01-31-2009
4.00
Fit baggage door and left baggage cover
Details
01-31-2009
1.00
Baggage door
Details
01-29-2009
1.50
Mid Seat Supports
Details
01-28-2009
1.50
Rivet cabin floors
Details
01-26-2009
3.00
Rivet baggage door and right seat floor
Details
01-26-2009
1.50
Brake lines
Details
01-24-2009
1.50
Covers
Details
01-24-2009
3.00
Brake line install
Details
01-22-2009
1.00
Tunnel covers
Details
01-20-2009
3.00
Floor panels, etc.
Details
01-19-2009
2.00
Prime and rivet baggage door
Details
01-17-2009
4.00
Baggage door construction
Details
01-10-2009
3.50
Install steps
Details
01-10-2009
1.00
Finish Steps install
Details
01-10-2009
1.50
Finish reviting
Details
01-08-2009
4.50
Attache tialcone
Details
01-08-2009
5.00
Attach Tailcone
Details
01-07-2009
4.00
Fit tailcone
Details
SITE NAVIGATION
Contact Builder
ZU-LOL RV7 Home
ZU-RVI RV10 Home
Category
# Logs
# Hours
All
778
6395
Avionics
20
313
Baggage Area
6
18
Canopy
68
485
Cooling Baffles
38
273
Cowling
33
294
Doors
47
261
Electrical
42
304
Elevators
24
86
Empennage
9
199
Engine
30
284
Fairings
33
297
Firewall Forward
5
80
Fuselage
49
910
Horizontal Stab
22
156
Instrument Panel
17
154
Interior
34
146
Landing Gear
11
103
Miscellaneous
38
472
Paint
98
468
Plenum
14
24
Prop
9
79
Rudder
14
117
Rudders & Brakes
7
41
Systems
3
50
Tailcone
35
209
Trim tabs
3
14
Vertical Stab
11
74
Windscreen
7
35
Wings
51
449
ZU-XOX RV10 Home
ZU-JRV RV7A Home
ZU-JVR RV10 Home
Copyright © 2001-2024 Matronics. All Rights Reserved.