Powered By Kitlog Pro v2.0
Jan Hanekoms RV Web Site
ZU-RVI RV10
Horizontal Stab
Work Logs Found:
22
Category Work Time:
51 Hours
Date
Hours
Work Log Summary
Details
03-27-2010
2.00
Prepare and paint HS
Details
10-02-2008
2.00
Rivet HS
Details
10-01-2008
1.00
Rivet HS skins
Details
09-30-2008
2.50
Rivet HS skin
Details
09-30-2008
2.50
Rivet HS skin
Details
09-29-2008
1.50
Rivet ribs and skins
Details
09-29-2008
2.00
Assemble HS
Details
09-27-2008
3.00
Strart with HS assembly
Details
09-27-2008
4.00
Prep and dimple HS parts
Details
09-25-2008
3.00
Match drill skins
Details
09-22-2008
1.50
Cleco rear spar and match drill to inspar ribs
Details
09-20-2008
3.00
Cleco nose ribs and spar to skin
Details
09-18-2008
2.00
Cleco nose and inspar ribs
Details
09-15-2008
2.00
Prepare nose ribs
Details
09-13-2008
1.00
Prepare inspar ribs
Details
09-11-2008
3.00
Prime HS parts
Details
09-09-2008
3.50
Match drill and rivet spar doublers
Details
09-04-2008
2.50
HS front spar doubler
Details
08-30-2008
4.00
Manufacture brakcets and spar caps
Details
08-28-2008
2.00
Prepare HS Spars
Details
08-25-2008
1.50
Match drill spar doubler and hinge brackets
Details
08-23-2008
1.50
Prepare HS 906, HS 1003 and 1004
Details
SITE NAVIGATION
Contact Builder
ZU-LOL RV7 Home
ZU-RVI RV10 Home
Category
# Logs
# Hours
All
778
6395
Avionics
20
313
Baggage Area
6
18
Canopy
68
485
Cooling Baffles
38
273
Cowling
33
294
Doors
47
261
Electrical
42
304
Elevators
24
86
Empennage
9
199
Engine
30
284
Fairings
33
297
Firewall Forward
5
80
Fuselage
49
910
Horizontal Stab
22
156
Instrument Panel
17
154
Interior
34
146
Landing Gear
11
103
Miscellaneous
38
472
Paint
98
468
Plenum
14
24
Prop
9
79
Rudder
14
117
Rudders & Brakes
7
41
Systems
3
50
Tailcone
35
209
Trim tabs
3
14
Vertical Stab
11
74
Windscreen
7
35
Wings
51
449
ZU-XOX RV10 Home
ZU-JRV RV7A Home
ZU-JVR RV10 Home
Copyright © 2001-2024 Matronics. All Rights Reserved.