KitLog pro

Powered By Kitlog Pro v2.0

Joe & Steve's RV9A Project
Work Logs Found: 20
Category Work Time: 82 Hours
 Date
Hours
Work Log Summary

Details

 04-10-2018
5.50
finalize seat heat and stick wiring
Details
     

 04-06-2018
4.00
R wing wire routing
Details
       

 10-11-2017
3.00
finish stick wiring and USB outlet
       

 09-30-2017
3.00
ELT and pitch servo
Details
       

 09-27-2017
2.00
Mount VPX and run wire harnesses
     

 09-15-2017
1.50
finalize high current wiring
Details
       

 09-12-2017
7.00
firewall electrics
Details
       

 07-24-2017
4.00
wingtip wiring
Details
       

 07-21-2017
1.00
install pigtail on VOR antenna
Details
     

 07-18-2017
3.00
wingtip lens attach
Details
       

 07-07-2017
1.75
final trim and fit lenses, mount lights
     

 07-06-2017
3.75
wingtip nav lights
Details
       

 06-17-2017
3.00
empennage electrical connections
       

 05-31-2017
7.50
finalize wing wire runs, install roll servo
Details
       

 01-28-2017
7.00
pitch servo installation
Details
       

 01-24-2017
1.25
flap position senor linkage
Details
     

 01-14-2017
4.00
flap position sensor
     

 09-05-2016
9.00
finish tail wiring, begin riveting top rear skin
Details
       

 08-27-2016
3.50
fab antenna doublers, tail wiring cont.
       

 08-20-2016
7.00
install adars, tail wiring, rudder cables, static
       










Copyright © 2001-2024 Matronics. All Rights Reserved.