Powered By Kitlog Pro v2.0
Joe & Steve's RV9A Project
RV9A
Airframe Electrical
Work Logs Found:
20
Category Work Time:
82 Hours
Date
Hours
Work Log Summary
Details
04-10-2018
5.50
finalize seat heat and stick wiring
Details
04-06-2018
4.00
R wing wire routing
Details
10-11-2017
3.00
finish stick wiring and USB outlet
09-30-2017
3.00
ELT and pitch servo
Details
09-27-2017
2.00
Mount VPX and run wire harnesses
09-15-2017
1.50
finalize high current wiring
Details
09-12-2017
7.00
firewall electrics
Details
07-24-2017
4.00
wingtip wiring
Details
07-21-2017
1.00
install pigtail on VOR antenna
Details
07-18-2017
3.00
wingtip lens attach
Details
07-07-2017
1.75
final trim and fit lenses, mount lights
07-06-2017
3.75
wingtip nav lights
Details
06-17-2017
3.00
empennage electrical connections
05-31-2017
7.50
finalize wing wire runs, install roll servo
Details
01-28-2017
7.00
pitch servo installation
Details
01-24-2017
1.25
flap position senor linkage
Details
01-14-2017
4.00
flap position sensor
09-05-2016
9.00
finish tail wiring, begin riveting top rear skin
Details
08-27-2016
3.50
fab antenna doublers, tail wiring cont.
08-20-2016
7.00
install adars, tail wiring, rudder cables, static
SITE NAVIGATION
RV9A Home
Category
# Logs
# Hours
All
423
1684
Airframe assy/rig
26
95
Airframe Electrical
20
82
Canopy
36
164
Engine/FWF/Prop
28
150
Exterior Prime/Paint
34
148
Fiberglass
50
234
Fuselage
55
233
Hangar
20
Interior paint
16
50
Miscellaneous
37
102
Panel/Avionics
26
95
Prime/Paint
34
148
Upgrades
31
133
Wheels/Brakes/Fuel
10
50
Copyright © 2001-2024 Matronics. All Rights Reserved.