Date
|
Hours
|
Work Log Summary
|
Details
|
06-25-2006
|
4.00
|
Stored empennage, located wing parts
|
|
|
|
06-24-2006
|
6.00
|
Built storage for empenage parts
|
|
|
|
06-23-2006
|
4.00
|
Riveted hinge to left elevator, installed trim ser
|
|
|
|
06-22-2006
|
5.00
|
Installed rod ends, temporarily installed elevator
|
|
|
|
06-17-2006
|
4.00
|
Pro sealed foam ribs and riveted hinge
|
|
|
|
04-30-2006
|
4.00
|
Trim tab
|
|
|
|
04-29-2006
|
4.00
|
Started trim tab
|
Details
|
|
|
04-17-2006
|
5.00
|
Pro Sealed AEX Wedge to elevators and rudder TE
|
Details
|
|
|
04-17-2006
|
1.00
|
I did all of the trailing edges at once
|
Details
|
|
|
04-16-2006
|
2.00
|
Finished countersinking AEX wedge
|
|
|
|
04-13-2006
|
3.00
|
Riveted bottom skin to spar, completed skin rivets
|
|
|
|
04-13-2006
|
3.00
|
Drilled trailing edge skins and wedge.
|
|
|
|
04-12-2006
|
3.00
|
Riveted spar to top skin, riveted on counterbalanc
|
|
|
|
04-12-2006
|
5.00
|
Back riveted stiffeners, assembled counterbalance
|
|
|
|
04-11-2006
|
5.00
|
Primed left elevator skin, assembled spar, and hor
|
|
|
|
04-10-2006
|
5.00
|
Primed Left Elevator Parts
|
|
|
|
03-19-2006
|
6.00
|
Riveted counterbalance, bottom spar, end ribs
|
|
|
|
03-18-2006
|
6.00
|
Riveted skin stiffeners, elevator skin to spar
|
|
|
|
03-12-2006
|
3.00
|
Counterbalance arm assembly
|
|
|
|
03-11-2006
|
6.00
|
Assembled right elevator skeleton
|
|
|
|
03-05-2006
|
4.00
|
Dimpled, deburred, both elevators ready for primin
|
|
|
|
03-04-2006
|
6.00
|
Match drilled skins to spars, dimpled, deburred
|
|
|
|
02-26-2006
|
3.00
|
Finished match drilling stiffeners
|
|
|
|
02-26-2006
|
2.00
|
Dimpled skins, doubler, assembled counterbalances
|
|
|
|
02-25-2006
|
4.00
|
Deburred elevator stiffeners, match drilled to ski
|
|
|
|
02-20-2006
|
1.00
|
Started elevators
|
|
|
|
02-20-2006
|
5.00
|
Rudder, riveted skins, machine countersunk wedge
|
|
|
|
02-18-2006
|
5.00
|
Rudder, Dimpled, deburred, finished edges of skins
|
|
|
|
02-18-2006
|
1.00
|
Riveted Counter balance rib, skin, rudder brace
|
|
|
|
02-12-2006
|
2.00
|
Started final assembly of the rudder.
|
|
|
|
02-11-2006
|
6.00
|
Disassemled, Dimpled, Deburred, Primed
|
Details
|
|
|
02-05-2006
|
5.00
|
Assembled rudder skeleton, matched drilled skins.
|
|
|
|
02-04-2006
|
3.00
|
Deburred skins and dimpled
|
|
|
|
01-29-2006
|
4.00
|
Finished rudder stiffeners, matched drilled
|
Details
|
|
|
01-28-2006
|
4.00
|
Started the rudder this afternoon
|
|
|
|
01-28-2006
|
2.50
|
Finished Vertical Stabilizer
|
|
|
|
01-23-2006
|
2.00
|
riveted front spar and middle rib to skin.
|
|
|
|
01-22-2006
|
3.00
|
Assembled front spar and ribs, clecoed on skin.
|
|
|
|
01-21-2006
|
5.00
|
Deburred, finished edges, dimpled and primed. Read
|
|
|
|
01-16-2006
|
4.00
|
Started vertical stabilizer this afternoon
|
Details
|
|
|
01-16-2006
|
2.00
|
finished horizontal stabilizer this morning
|
|
|
|
01-15-2006
|
6.00
|
finished riveting the rear spar and hinge brackets
|
|
|
|
01-14-2006
|
6.00
|
Riveting second skin
|
|
|
|
01-02-2006
|
3.00
|
Ready to rivet skins
|
Details
|
|
|
12-31-2005
|
3.00
|
Riveting spars
|
|
|
|
12-30-2005
|
2.00
|
Dimpling skins
|
|
|
|
12-18-2005
|
4.00
|
Both sides ready to debur and dimple
|
|
|
|
12-17-2005
|
1.00
|
Horizontal stabilizers
|
|
|
|
12-17-2005
|
6.00
|
Horizontal stabilizer
|
Details
|
|
|
10-17-2005
|
1.00
|
Horizontal Stabilizer
|
|
|
|
10-15-2005
|
1.00
|
Horizontal Stabilizer
|
Details
|
|