KitLog pro

Powered By Kitlog Pro v2.0

Mikes Web site
Work Logs Found: 51
Category Work Time: 190 Hours
 Date
Hours
Work Log Summary

Details

 06-25-2006
4.00
Stored empennage, located wing parts
     

 06-24-2006
6.00
Built storage for empenage parts

 06-23-2006
4.00
Riveted hinge to left elevator, installed trim ser
       

 06-22-2006
5.00
Installed rod ends, temporarily installed elevator
       

 06-17-2006
4.00
Pro sealed foam ribs and riveted hinge
       

 04-30-2006
4.00
Trim tab
       

 04-29-2006
4.00
Started trim tab
Details
       

 04-17-2006
5.00
Pro Sealed AEX Wedge to elevators and rudder TE
Details
       

 04-17-2006
1.00
I did all of the trailing edges at once
Details
       

 04-16-2006
2.00
Finished countersinking AEX wedge

 04-13-2006
3.00
Riveted bottom skin to spar, completed skin rivets
       

 04-13-2006
3.00
Drilled trailing edge skins and wedge.
       

 04-12-2006
3.00
Riveted spar to top skin, riveted on counterbalanc
       

 04-12-2006
5.00
Back riveted stiffeners, assembled counterbalance
       

 04-11-2006
5.00
Primed left elevator skin, assembled spar, and hor
       

 04-10-2006
5.00
Primed Left Elevator Parts
       

 03-19-2006
6.00
Riveted counterbalance, bottom spar, end ribs
       

 03-18-2006
6.00
Riveted skin stiffeners, elevator skin to spar
       

 03-12-2006
3.00
Counterbalance arm assembly
       

 03-11-2006
6.00
Assembled right elevator skeleton
       

 03-05-2006
4.00
Dimpled, deburred, both elevators ready for primin
       

 03-04-2006
6.00
Match drilled skins to spars, dimpled, deburred
       

 02-26-2006
3.00
Finished match drilling stiffeners
       

 02-26-2006
2.00
Dimpled skins, doubler, assembled counterbalances
       

 02-25-2006
4.00
Deburred elevator stiffeners, match drilled to ski
       

 02-20-2006
1.00
Started elevators
     

 02-20-2006
5.00
Rudder, riveted skins, machine countersunk wedge
       

 02-18-2006
5.00
Rudder, Dimpled, deburred, finished edges of skins
       

 02-18-2006
1.00
Riveted Counter balance rib, skin, rudder brace
       

 02-12-2006
2.00
Started final assembly of the rudder.
       

 02-11-2006
6.00
Disassemled, Dimpled, Deburred, Primed
Details
     

 02-05-2006
5.00
Assembled rudder skeleton, matched drilled skins.
       

 02-04-2006
3.00
Deburred skins and dimpled
       

 01-29-2006
4.00
Finished rudder stiffeners, matched drilled
Details
       

 01-28-2006
4.00
Started the rudder this afternoon
       

 01-28-2006
2.50
Finished Vertical Stabilizer
       

 01-23-2006
2.00
riveted front spar and middle rib to skin.

 01-22-2006
3.00
Assembled front spar and ribs, clecoed on skin.
       

 01-21-2006
5.00
Deburred, finished edges, dimpled and primed. Read
       

 01-16-2006
4.00
Started vertical stabilizer this afternoon
Details
       

 01-16-2006
2.00
finished horizontal stabilizer this morning
       

 01-15-2006
6.00
finished riveting the rear spar and hinge brackets
       

 01-14-2006
6.00
Riveting second skin

 01-02-2006
3.00
Ready to rivet skins
Details
       

 12-31-2005
3.00
Riveting spars
       

 12-30-2005
2.00
Dimpling skins
       

 12-18-2005
4.00
Both sides ready to debur and dimple
       

 12-17-2005
1.00
Horizontal stabilizers
       

 12-17-2005
6.00
Horizontal stabilizer
Details
       

 10-17-2005
1.00
Horizontal Stabilizer
       

 10-15-2005
1.00
Horizontal Stabilizer
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.