KitLog pro

Powered By Kitlog Pro v2.0

Bobs Ten
Work Logs Found: 13
Category Work Time: 31 Hours
 Date
Hours
Work Log Summary

Details

 04-25-2020
6.50
Heat Valve Controllers
Details

 04-24-2020
3.30
Heat Valve Controllers
Details

 04-22-2020
2.00
Heat valve Controllers
Details

 04-14-2018
1.30
Install Heat Duct Bypass Cables
Details
       

 04-09-2018
3.00
Install Heat Duct Bypass Cables
Details
       

 04-08-2018
1.30
Install Heat Duct Bypass Cables
Details
       

 04-08-2018
1.80
Install Heat Duct Bypass Cable
Details
       

 04-02-2018
1.50
Install Heat Bypass Cables
Details
       

 03-09-2018
1.10
Install Reduced Diameter SCAT Duct
Details
       

 09-01-2016
1.70
Modify Heat Valves, Apply Filler to Cabin Top
Details
       

 08-28-2016
3.30
Remove Heat Valves, Install Oil Cooler Valve
Details
       

 08-12-2016
3.00
Install Heat Valve Actuators
Details
     

 07-29-2016
1.50
Install Heat Valve Servos
Details










Copyright © 2001-2024 Matronics. All Rights Reserved.