Date
|
Hours
|
Work Log Summary

|
Details

|
03-13-2020
|
4.25
|
Installed Top Baggage Bulkhead. Fire Ext.
|
Details
|
  |
|
03-11-2020
|
6.00
|
Installed Front Seats & Lower Baggage Bulkhead
|
Details
|
  |
|
03-09-2020
|
5.25
|
Reinstalled Covers, Console, & Fuel Selector
|
Details
|
  |
|
03-05-2020
|
6.25
|
Installed covers & console. Changed Fuel Valve Po
|
Details
|
  |
|
03-04-2020
|
3.75
|
Tested For Brake Leaks & Reinstalled Seat Rails
|
Details
|
  |
|
01-08-2020
|
5.00
|
Install Left Door Seal
|
Details
|
  |
|
01-07-2020
|
4.25
|
Cut Mats, Installed Covers, "Experimental" Label I
|
Details
|
  |
|
01-06-2020
|
6.50
|
Installed Inside Access Covers
|
Details
|
  |
|
02-12-2019
|
6.00
|
Tunnel Access Panel, Control Panel Prep
|
Details
|
|
|
02-11-2019
|
5.25
|
Tunnel Access Plate Install
|
Details
|
  |
|
02-08-2019
|
6.75
|
Tunnel Side Access Install
|
Details
|
  |
|
06-22-2017
|
4.50
|
Prep for Gluing Doors
|
Details
|
  |
|
06-21-2017
|
6.25
|
Secure Cabin Top at Door Openings
|
Details
|
  |
|
06-20-2017
|
7.25
|
Installing Cabin Top
|
Details
|
  |
|
06-15-2017
|
6.50
|
Final Prep for Cabin Top Attachment
|
Details
|
  |
|
06-14-2017
|
7.50
|
Firewall Riveting & Cowl Hinges
|
Details
|
  |
|
06-13-2017
|
4.00
|
Forward Fuselage Top Assembly
|
Details
|
  |
|
06-12-2017
|
7.50
|
Prep For Closing Fuselage
|
Details
|
  |
|
06-07-2017
|
1.50
|
Cleaned Up From Internal Painting
|
Details
|
  |
|
06-06-2017
|
2.00
|
Interior Painting
|
Details
|
  |
|
05-31-2017
|
1.50
|
Interior Painting
|
Details
|
  |
|
05-30-2017
|
5.50
|
Interior Painting
|
Details
|
  |
|
05-26-2017
|
0.75
|
Interior Painting
|
Details
|
  |
|
05-25-2017
|
1.50
|
Interior Painting
|
Details
|
  |
|
05-24-2017
|
1.00
|
Interior Painting
|
Details
|
  |
|
05-23-2017
|
2.00
|
Interior Painting
|
Details
|
  |
|
05-19-2017
|
1.25
|
Interior Painting
|
Details
|
  |
|
05-18-2017
|
2.00
|
Interior Painting
|
Details
|
  |
|
05-17-2017
|
2.00
|
Interior Painting
|
Details
|
  |
|
05-09-2017
|
1.25
|
Painting Canopy
|
Details
|
  |
|
05-08-2017
|
1.75
|
Painting Canopy Inside
|
Details
|
  |
|
05-01-2017
|
4.25
|
Painting Fiberglass Canopy Interior
|
Details
|
|
|
04-27-2017
|
3.00
|
Cut Opening for USB Power Units & Painted the Pane
|
Details
|
  |
|
04-26-2017
|
1.50
|
Painting Interior Panels
|
Details
|
  |
|
04-25-2017
|
1.75
|
Painting Cover Panels
|
Details
|
  |
|
04-24-2017
|
1.50
|
Painting Cover Panels
|
Details
|
  |
|
04-21-2017
|
1.75
|
Painting Cover Panels
|
Details
|
  |
|
04-20-2017
|
2.50
|
Painted Interior Covers
|
Details
|
  |
|
04-19-2017
|
3.50
|
Interior Covers Painting
|
Details
|
  |
|
04-14-2017
|
3.25
|
Interior Painting Prep
|
Details
|
  |
|
04-13-2017
|
3.00
|
Primed Inside of Cabin Top
|
Details
|
  |
|
04-13-2017
|
3.50
|
Fabricated Right Side Wire Cover
|
Details
|
  |
|
03-18-2017
|
2.75
|
Riviting Hard To Reach Locations
|
Details
|
  |
|
03-16-2017
|
4.00
|
Continued Smoothing Cabin Top
|
Details
|
  |
|
03-14-2017
|
5.00
|
Smoothing Inside Cabin Top
|
Details
|
  |
|
03-01-2017
|
5.00
|
Cabin Top Finish & Avionics Planning
|
Details
|
  |
|
02-28-2017
|
4.00
|
Primed Inside Cabin Top
|
Details
|
  |
|
02-23-2017
|
7.00
|
Cabin Top Prep; Oil Cooler Box
|
Details
|
  |
|
02-22-2017
|
7.75
|
Primed Parts, Prepared for Wiring
|
Details
|
  |
|
02-20-2017
|
5.00
|
Prepared Cabin Top for Riveting
|
Details
|
  |
|
02-16-2017
|
8.00
|
Plexiglass Trimming; Cabin Top Drilling
|
Details
|
  |
|
02-10-2017
|
2.00
|
Practiced Plexiglass Cutting
|
Details
|
  |
|
02-10-2017
|
1.50
|
Cabin Top Vertical Support Post
|
Details
|
  |
|
02-09-2017
|
8.00
|
Drilling Cabin Top
|
Details
|
|
|
02-07-2017
|
7.75
|
Prep for Electrical, A/C Prep
|
Details
|
  |
|
02-02-2017
|
6.25
|
Wiring Prep & Fiberglass Overhead Console
|
Details
|
  |
|
02-01-2017
|
5.25
|
Wiring for Tail Light
|
Details
|
  |
|
01-31-2017
|
7.00
|
Glued Overhead Console to Cabin Top
|
Details
|
  |
|
01-30-2017
|
5.75
|
Prepare Overhead Console
|
Details
|
  |
|
01-23-2017
|
7.30
|
Prepare Overhead Console for Gluing
|
Details
|
  |
|
01-17-2017
|
6.00
|
Cabin LIghts
|
Details
|
  |
|
01-16-2017
|
8.00
|
Antennas, Tail LIght, Bulkhead Repair
|
Details
|
  |
|
12-08-2016
|
3.50
|
Parking Brake Valve
|
Details
|
|
|
11-29-2016
|
0.50
|
Installed the Fuel Flow Transmitter
|
Details
|
  |
|
11-27-2016
|
1.50
|
Rivet Fuel Flow Transmitter Bracket to Fuselage
|
Details
|
  |
|
11-09-2016
|
6.00
|
Cabin Overhead Lights
|
Details
|
  |
|
10-10-2016
|
5.00
|
FT-60 & Wing Walk
|
Details
|
  |
|
10-05-2016
|
7.00
|
Fabricated F1099 Wing Fairing Supports & Stiffener
|
Details
|
  |
|
10-04-2016
|
4.00
|
Began Fitting Overhead Console
|
Details
|
  |
|
10-03-2016
|
3.50
|
Fuel System
|
Details
|
  |
|
09-30-2016
|
3.00
|
Fitting Cabin Top
|
Details
|
|
|
09-28-2016
|
8.00
|
Fitting Cabin Top
|
Details
|
  |
|
09-27-2016
|
5.50
|
Cabin Top Fitting
|
Details
|
  |
|
09-26-2016
|
6.00
|
Flap Actuator Assembly Install
|
Details
|
|
|
09-23-2016
|
4.50
|
Elevator Control System Install
|
Details
|
|
|
09-22-2016
|
7.00
|
Fuel Filter & Pump; Fiberglass Top Trim
|
Details
|
|
|
09-21-2016
|
8.00
|
Fiberglass Top; Baggage Door
|
Details
|
|
|
09-20-2016
|
8.75
|
Cutting Down Fiberglass Top; Installing Baggage Do
|
Details
|
|
|
09-19-2016
|
8.25
|
Began Work on Fuselage Top
|
Details
|
  |
|
09-16-2016
|
6.25
|
Rear Seat Backs
|
Details
|
|
|
09-15-2016
|
8.50
|
Flap Bushings; Cowl Attach Hinge Fabrication
|
Details
|
  |
|
09-14-2016
|
8.25
|
Flap System
|
Details
|
  |
|
09-12-2016
|
8.00
|
Control System
|
Details
|
  |
|
09-09-2016
|
7.00
|
Installed Rudder Pedals; Fabricated Elevator Push
|
Details
|
|
|
09-08-2016
|
6.50
|
Static Port Tubing; Brake/Rudder Pedals
|
Details
|
|
|
09-07-2016
|
8.50
|
Anti-Yaw Bracket and Static Air Tubing
|
Details
|
  |
|
09-06-2016
|
8.25
|
Fuel System
|
Details
|
|
|
09-01-2016
|
8.25
|
Yaw Servo Mount, Brake Lines
|
Details
|
|
|
08-31-2016
|
8.25
|
Baggage Door, Pitch Servo, Rear Seat Floor
|
Details
|
  |
|
08-29-2016
|
3.75
|
Baggage Corrugation Wear Blocks & Door
|
Details
|
 |
|
08-26-2016
|
5.50
|
Continued Baggage Area Work
|
Details
|
  |
|
08-25-2016
|
8.50
|
Baggage Area
|
Details
|
  |
|
08-24-2016
|
2.75
|
Install Steps & Prep For Floor Riveting
|
Details
|
|
|
08-23-2016
|
6.50
|
Install Conduit in Fuselage
|
Details
|
|
|
08-22-2016
|
6.25
|
Hinges and Floor for Baggage Area
|
Details
|
  |
|
08-19-2016
|
5.00
|
Rivet Fuselage to Tail Cone
|
Details
|
 |
|
08-18-2016
|
7.50
|
Disconnected Tail Cone and Prepared for Riveting
|
Details
|
  |
|
08-11-2016
|
8.00
|
Tail Cone Mating to Fuselage
|
Details
|
  |
|
08-10-2016
|
1.50
|
Initial Connection of Tail Cone to Fuselage
|
Details
|
  |
|
08-08-2016
|
8.00
|
Front Floor, Brake Lines, Wiring Holes
|
Details
|
  |
|
07-14-2016
|
7.00
|
Preparing for Priming
|
Details
|
  |
|
07-13-2016
|
7.00
|
Access Panels for Step Bolts
|
Details
|
  |
|
07-12-2016
|
8.00
|
Priming & Locating Access Hatch
|
Details
|
  |
|
07-11-2016
|
8.50
|
Continued QB Fuselage Work Against Plans
|
Details
|
  |
|
07-08-2016
|
6.00
|
Continued QB Fuselage Review Against Plans
|
Details
|
  |
|
07-07-2016
|
8.00
|
Began review of QB fuselage against plans
|
Details
|
  |