Date
|
Hours
|
Work Log Summary
|
Details
|
08-14-2016
|
1.50
|
Torqued L & R tank boltsto Z-flanges
|
Details
|
|
|
07-23-2016
|
4.25
|
Installed fuel tanks to wings
|
|
|
|
06-29-2016
|
2.00
|
Step 1; Pressure test fuel tanks
|
Details
|
|
|
06-06-2016
|
5.50
|
Steps1 - 2: Leak test tanks
|
Details
|
|
|
05-29-2016
|
29.00
|
Steps 4;
|
Details
|
|
|
05-29-2016
|
1.50
|
Step 3: Install senders both tanks
|
|
|
|
05-26-2016
|
7.50
|
Steps 1,2,4,5: Fuel tanks - rear baffles
|
Details
|
|
|
05-14-2016
|
0.75
|
Step 2 - 3; Fuel tank vent line
|
Details
|
|
|
05-11-2016
|
3.50
|
Steps 1 - 7: Vent lines, ribs, inbrd rib
|
Details
|
|
|
05-08-2016
|
0.10
|
Steps 1 - 4; More fuel tank rib install pics
|
|
|
|
05-08-2016
|
23.00
|
Steps 1 - 4; Fuel tank ribs
|
Details
|
|
|
05-03-2016
|
17.70
|
Steps 1 - 5: Stiffeners, ribs, attach bracket
|
Details
|
|
|
05-03-2016
|
3.00
|
Steps 1 - 2: Sender float wire bends
|
Details
|
|
|
05-01-2016
|
2.00
|
Step 5: Install tank attach bracket
|
Details
|
|
|
03-16-2016
|
2.00
|
Tank rib install assist tools
|
Details
|
|
|
03-15-2016
|
5.00
|
Steps 1 - 4: Fuel tank stiffeners
|
Details
|
|
|
12-26-2015
|
1.50
|
Step 1; rivet nutplates to Z-flanges
|
|
|
|
12-17-2015
|
7.75
|
Steps 6-12; prep tank assembly skin items.
|
Details
|
|
|
12-17-2015
|
0.10
|
Step 1: Final drill drain flange holes
|
|
|
|
12-16-2015
|
3.25
|
Fuel tank baffle rib fuel slip gates.
|
Details
|
|
|
12-15-2015
|
3.50
|
Steps 7-8; assemble tank attach brackets.
|
|
|
|
12-13-2015
|
4.50
|
Steps 3-6; prep all tank bracket assemblies.
|
Details
|
|
|
12-07-2015
|
1.75
|
Steps 3-5; prep tank j-stiffeners.
|
|
|
|
12-07-2015
|
2.00
|
Step 2-3; final drill and step drill.
|
|
|
|
12-06-2015
|
0.50
|
Step 2; fabricate tank j-channels.
|
|
|
|
12-05-2015
|
5.25
|
Steps 4-5; prep tank ribs.
|
Details
|
|
|
12-05-2015
|
1.25
|
Step 2; prep shims, drill, debur, dimple.
|
|
|
|
12-03-2015
|
2.50
|
Step 10-12; final drill tank Z's, debur.
|
|
|
|
12-02-2015
|
2.50
|
Steps 8-9; prep tanks stiffeners.
|
Details
|
|
|
12-02-2015
|
0.50
|
Step 1; separate and debur shims.
|
|
|
|
11-27-2015
|
0.75
|
Step 11; trim tank attach Z's from stock.
|
|
|