Joe & Steve's RV9A Project
RV9A
Fiberglass
Work Logs Found:
50
Category Work Time:
234 Hours
Date
Hours
Work Log Summary
Details
03-16-2018
7.50
pants/fairings finsihing
Details
03-15-2018
8.50
L wheel pant and fairings
03-14-2018
8.00
finish construction R pants and fairings
Details
03-13-2018
7.00
gear leg and intersection fairings, wheel pants
Details
03-12-2018
4.00
gear leg fairings cont.
Details
03-09-2018
6.00
wheel pants
Details
03-08-2018
7.00
main gear fairings
Details
03-07-2018
8.00
main gear leg fairings
Details
01-26-2018
8.50
cowl...
Details
01-25-2018
1.25
sand cowl
01-22-2018
5.50
cowl and plenum
Details
01-18-2018
6.00
sand and surface cowl and nose fairings
Details
01-16-2018
1.00
oil door cont.
Details
01-12-2018
1.50
cowl cont.
Details
01-11-2018
5.50
oil door
Details
01-05-2018
5.25
nose glass fill and sand cont.
01-04-2018
9.25
front gear glass
Details
01-03-2018
2.50
complete construction nosegear fairing
01-02-2018
8.00
nose wheel pant and fairing cont.
Details
12-30-2017
5.00
front wheel pants
Details
12-29-2017
5.00
finish cowl skybolts, add filler
Details
12-28-2017
6.50
horizontal skybolts
Details
12-27-2017
1.00
fill extra holes in top cowl
12-26-2017
7.00
cowl cont....
Details
12-23-2017
6.00
cowl
Details
12-22-2017
6.25
cowl cont.
Details
12-21-2017
5.00
skybolts cont.
Details
12-20-2017
5.00
cowl cont.
Details
12-19-2017
6.00
cowl installation
Details
12-11-2017
2.50
begin cowl
Details
09-14-2017
2.00
begin work on FWD upper fuse structure
07-29-2017
1.00
apply filler to wing tip leading edges
07-25-2017
2.00
wingtip cont.
Details
07-24-2017
4.00
wingtips cont.
Details
07-21-2017
2.50
wingtip nutplates cont.
07-20-2017
4.00
wing tips cont.
Details
07-19-2017
5.25
trim and fit wing tips
Details
07-17-2017
4.00
wingtips cont.
Details
06-21-2017
4.00
emp fairing ready for prime and paint
Details
06-19-2017
5.25
emp fairing cont.
Details
06-16-2017
2.25
emp fairing cont., elevator prep for paint
06-15-2017
4.00
emp fairing
Details
06-14-2017
3.50
rudder bottom cap cont.
Details
06-13-2017
4.00
rudder caps, emp fairing
Details
06-02-2017
3.00
fill and prime HS and elevator caps
Details
05-27-2017
2.25
emp caps cont.
05-25-2017
3.50
elevator / HS caps cont.
Details
05-24-2017
1.75
sanded HS and elevator glass, applied #2 coat to e
05-23-2017
2.50
HS / elevator caps cont.
Details
05-22-2017
8.00
HS and elevator caps
Details
SITE NAVIGATION
RV9A Home
Category
# Logs
# Hours
All
423
1684
Airframe assy/rig
26
95
Airframe Electrical
20
82
Canopy
36
164
Engine/FWF/Prop
28
150
Exterior Prime/Paint
34
148
Fiberglass
50
234
Fuselage
55
233
Hangar
20
Interior paint
16
50
Miscellaneous
37
102
Panel/Avionics
26
95
Prime/Paint
34
148
Upgrades
31
133
Wheels/Brakes/Fuel
10
50