Work Log Summary

|
Details

|
03-27-2017
|
8.00
|
First engine start. Installed fire extinguisher
|
|
  |
|
03-24-2017
|
7.00
|
Tourqued propellor. Installed spinner and seat.
|
Details
|
 |
|
01-18-2017
|
4.50
|
Finished installing the two cowl baffles
|
|
  |
|
01-11-2017
|
1.50
|
flox fiberglassing the lower cowl for baffling
|
|
  |
|
12-16-2016
|
2.50
|
Clean up. Fill and sand on the cowling exhaust
|
|
  |
|
12-09-2016
|
6.00
|
Work on baffling and install crank case breather
|
|
  |
|
12-05-2016
|
4.00
|
Adjusting the cowlings fitting
|
|
  |
|
12-01-2016
|
6.50
|
Body filler added and sanded for exhaust exit.
|
|
 |
|
11-30-2016
|
5.50
|
Installed two thirds of the baffel seals
|
|
 |
|
11-29-2016
|
4.00
|
Continue working on cowl exhaust and intakes.
|
|
  |
|
11-22-2016
|
8.00
|
Fiberglass plus electrical.
|
Details
|
  |
|
11-21-2016
|
4.00
|
Adjusting Pmags and installing manifoild pressure
|
|
  |
|
11-18-2016
|
6.00
|
fiberglassing exhaust fairings. Epoxying air ducts
|
|
  |
|
11-17-2016
|
6.00
|
Cowling door, exhaust farings, cowl inlet farings
|
|
|
|
11-16-2016
|
8.00
|
Man Pres Sensor, Oil press sensor, oil door
|
|
  |
|
11-15-2016
|
6.00
|
Install sniffle valve, fuel relief, & Manifold pre
|
|
|
|
11-14-2016
|
7.00
|
Finished installing oil cooler. Adel clamping line
|
|
 |
|
11-11-2016
|
8.00
|
Oil cooler and making fiberglass exhaust cowls
|
|
  |
|
11-10-2016
|
2.00
|
Final adjust and fit the engine cowls
|
|
  |
|
11-09-2016
|
1.00
|
Installed theair intake baffleing
|
|
 |
|
11-08-2016
|
7.00
|
Installed heating scat tube ducting
|
|
 |
|
11-07-2016
|
4.40
|
Fabricated and installed 4 tension rods on bafflin
|
|
  |
|
11-04-2016
|
9.00
|
connecting fuel lines and cooling tubes
|
|
|
|
11-03-2016
|
8.00
|
Finish and install Alt Air Door in air intake plen
|
|
 |
|
11-02-2016
|
6.00
|
Design and make alternate air door
|
|
 |
|
11-01-2016
|
8.00
|
Installed air filter
|
|
|
|
10-27-2016
|
4.00
|
Made attachment for air filter
|
|
  |
|
10-26-2016
|
7.50
|
Continuing baffle instalation
|
|
  |
|
10-25-2016
|
9.00
|
Finish installing exhaust.
|
|
|
|
10-24-2016
|
9.00
|
Air duct fiberglassing andtrimming cowling for exh
|
|
  |
|
10-21-2016
|
7.00
|
More fiberglassing on intake baffle plus paint baf
|
|
  |
|
10-20-2016
|
7.00
|
Finish making baffles and undercoated
|
|
 |
|
10-19-2016
|
9.00
|
Woking on modifying the air intaker
|
|
  |
|
10-18-2016
|
3.00
|
More fiberglassing on the air induction
|
|
  |
|
10-17-2016
|
9.50
|
Fiberglass engine air duct. Assembling engine baff
|
|
|
|
10-14-2016
|
5.50
|
Worked on filtered air to the engine
|
|
  |
|
10-12-2016
|
8.00
|
Finished and painted Left Forward baffel
|
|
 |
|
10-11-2016
|
4.50
|
Finishing Left front baffle
|
|
 |
|
10-10-2016
|
8.00
|
Making new Left front baffle
|
|
  |
|
10-07-2016
|
7.00
|
Finished clecoing the cowl.
|
|
|
|
10-06-2016
|
6.00
|
Working on the cowl
|
|
 |
|
10-05-2016
|
6.00
|
Fitted and cleco'd on the top cowl. Started on bot
|
|
 |
|
10-04-2016
|
8.50
|
Installed MT prop. Continue working on cowling
|
|
  |
|
10-03-2016
|
4.50
|
Working on the air intake filter housing
|
|
  |
|
09-30-2016
|
5.00
|
Cutting cowls
|
|
|
|
09-29-2016
|
2.00
|
Finishing the Fuselage to cowl hinges
|
|
  |
|
09-28-2016
|
5.00
|
L front cowling. Alternator bracket. Start cowl hi
|
|
  |
|
09-27-2016
|
2.00
|
Moved prop to hangar and unpackaged.
|
|
 |
|
09-27-2016
|
2.00
|
Continue work on baffling
|
|
|
|
09-22-2016
|
4.00
|
Working on baffling and air filter location
|
|
  |
|
09-16-2016
|
7.00
|
Wired up the cowl flap
|
|
  |
|
09-15-2016
|
4.00
|
Worked on sorting out fluid fittings
|
|
  |
|
09-09-2016
|
4.00
|
install cowl flap - mechanically
|
|
|
|
09-09-2016
|
5.00
|
Design and make electric cowl flap
|
|
|
|
09-08-2016
|
3.00
|
Installed B+ wire from Alt 1. Started cowl flap
|
|
  |
|
09-07-2016
|
8.00
|
Put a new hole in firewall. Connected control cabl
|
|
  |
|
08-30-2016
|
5.00
|
Installer exhaust. Rewire wingtip light plugs
|
|
  |
|
08-29-2016
|
6.50
|
Created the bracket to hold the mixture cable
|
|
 |
|
08-26-2016
|
2.30
|
Continue designing & installing throttle bracket
|
|
|
|
08-25-2016
|
8.00
|
Designing a throttle bracket for the engine
|
|
  |
|
08-08-2016
|
10.00
|
Completed alternator install. Cabin heat vents.
|
|
|
|
08-05-2016
|
6.50
|
Manufacture and install the ships alternator brack
|
|
  |
|
07-08-2016
|
8.00
|
Mounted Engine
|
|
|
|
07-06-2016
|
4.00
|
Mounted engine bracket and started nose wheel
|
|
 |
|
06-28-2016
|
7.00
|
Installed battery and contactors
|
|
 |