Powered By Kitlog Pro v2.0
Beyond Blue
Cozy MKIV
Chapter 6: Fuselage
Work Logs Found:
113
Category Work Time:
215 Hours
Date
Hours
Work Log Summary
Details
05-24-2018
0.50
Removed wooden boards from fuselage bottom
Details
05-19-2018
3.00
Tape front fuselage section floor joints
Details
05-13-2018
1.50
Tape front seat joints
Details
05-06-2018
2.00
Taped rear seat fuselage joints
Details
04-15-2018
2.00
Taped floor to landing gear bulkhead corner
Details
03-31-2018
3.50
Permanent floor installation
Details
03-30-2018
1.00
Shim gaps between fuselage floor and sides
Details
03-25-2018
1.50
Positioning & Fitting floor into fuselage assembly
Details
03-17-2018
2.50
Trim & Sand The Floor
Details
03-12-2018
7.00
Glassing the floor
Details
02-25-2018
1.00
Adding a radius to the top edges
Details
02-24-2018
1.00
Position floor on worktable for glassing
Details
02-20-2018
1.00
Remove nails and trim floor spacers
Details
02-18-2018
2.00
Installed Remaining Floor Spacers
Details
02-11-2018
5.00
Finished shaping floor spacers
Details
02-06-2018
1.50
Remove nails & trim floor spacers
Details
02-03-2018
2.00
Install Floor Spacers for the Console
Details
01-29-2018
2.00
Micro aft floor spacers in place.
Details
01-26-2018
1.50
Micro centre floor spacer in place
Details
01-21-2018
1.50
Contouring the floor
Details
01-14-2018
2.00
Contouring the aircraft floor
Details
01-13-2018
1.00
Contouring the floor
Details
01-07-2018
1.50
Shaping spacers for the floor
Details
01-06-2018
2.50
Contouring the floor spacers
Details
01-05-2018
1.00
Cut out the landing brake
Details
01-01-2018
5.00
Shape the bottom of the fuselage
Details
12-31-2017
1.50
Tape seat brace and heat duct corners
Details
12-29-2017
1.00
Prepare tape for seat brace and heat duct joints
Details
12-27-2017
3.00
Permanent install of seat brace & heat duct
Details
12-26-2017
2.50
Sanding bottom of seatback and IP
Details
12-24-2017
2.00
Trim and Sand Seat Brace and Heat Duct
Details
12-17-2017
2.00
2" taped joint for heat duct and seat brace
Details
12-16-2017
3.00
Flox seat brace to heat duct
Details
12-09-2017
2.50
Trimmed and Sanded Heat Duct & Seat Brace
Details
12-03-2017
2.00
Glass 2nd side of seat brace
Details
12-02-2017
2.00
Glass the heat duct with 2 ply BID
Details
11-27-2017
1.50
Cut Cloth for heat duct and seat brace
Details
11-18-2017
7.00
Trimming and Sanding the bulkheads
Details
11-05-2017
1.50
Glass 1st side of triangular brace
Details
10-29-2017
1.00
Prepare 1st side Seat Brace for Glassing
Details
10-28-2017
2.50
7 layer UND on heat duct
Details
10-20-2017
1.00
Flox Fuel Valve & Bracket Assembly in place
Details
10-16-2017
1.00
Fitting fuel valve and bracket in place
Details
10-15-2017
1.00
Installed spares to 2nd side triangular brace
Details
10-14-2017
2.00
Install spacers 1st side of triagular brace
Details
10-09-2017
1.00
Glass the triangular brace spacers
Details
10-08-2017
1.50
Cut glass for triangular brace spacers
Details
10-07-2017
2.00
Install safety belt tube in heat duct
Details
10-06-2017
3.00
Flox heat duct together
Details
10-01-2017
2.00
Preparing Centre Keel
Details
09-17-2017
2.00
Tape inside corners lower firewall
Details
09-09-2017
2.00
Permanently Install Lower Firewall
Details
09-04-2017
2.00
Inboard foam shims for lower firewall
Details
09-03-2017
1.00
Install outer foam shims for firewall
Details
08-24-2017
4.00
Filing and shimming the firewall
Details
08-07-2017
2.00
Aligning Bottom Permanent Firewall
Details
07-30-2017
1.50
Positioning the bottom permanent firewall
Details
07-09-2017
1.50
Trimming and sanding 6 ply layup and aileron torqu
Details
07-03-2017
1.50
Drilling Aileron Torque Tube Holes
Details
07-02-2017
2.00
tape aft side of forward landing gear bulkhead
Details
07-01-2017
2.00
6-ply UND landing gear bulkhead layup
Details
06-25-2017
1.50
Prepare for 6-ly UND layup
Details
06-17-2017
2.00
Flip over fuselage
Details
06-11-2017
1.50
Tape the joint between upper and lower bulkhead
Details
06-10-2017
2.00
Applying 3 ply UND to landing gear bulkhead
Details
06-04-2017
1.50
Prepare for 3 ply UND layup on bulkhead
Details
05-22-2017
1.00
Paper patterns for 3-ply UND layup
Details
05-13-2017
2.50
Flox upper landing gear bulkhead in place
Details
05-07-2017
1.00
Aft landing gear bulkhead hardpoint holes
Details
04-29-2017
1.00
Flox fwd landing gear bulkhead in place
Details
04-08-2017
3.00
Positioning Forward Gear Bulkhead
Details
03-17-2017
3.00
Taped aft landing gear bulkhed corners
Details
03-16-2017
2.00
Fwd landing gear bulkhead install prep
Details
03-15-2017
3.00
Flox Aft Landing Gear Bulkhead in place
Details
03-12-2017
1.00
Tape F28 corners
Details
03-11-2017
2.00
Install Bulkhead F28
Details
02-26-2017
1.00
Position Bulkhead F28
Details
02-25-2017
2.50
Canard Reinforcements
Details
02-11-2017
2.00
Trimming and Sanding IP & F22 Joints
Details
02-04-2017
3.00
Reinforcing IP and F22 Joints
Details
01-29-2017
1.50
Sanding bulkhead joints
Details
01-22-2017
2.00
Reinforce Front Seatback
Details
01-21-2017
1.50
Sand Seatback Joints
Details
01-14-2017
2.25
Secure fuselage asembly
Details
01-13-2017
0.50
Flox Plywood Inserts in place
Details
01-07-2017
1.00
Trial fit fuel valve & bracket assembly
Details
01-07-2017
1.00
Prepare seat braces for plywood insert
Details
01-06-2017
1.50
Fabricated fuel valve bracket
Details
01-02-2017
1.00
Trimming seat brace
Details
01-01-2017
2.50
Making a new seat brace
Details
12-31-2016
1.50
Quality checks on centre keel and heat duct
Details
12-28-2016
2.00
Cut the keel and heat duct parts to size
Details
12-27-2016
2.50
Glass keel and air duct parts
Details
12-26-2016
1.50
Cut cloth for centre keel and seatback brace
Details
12-24-2016
1.50
0.25" birch inserts
Details
12-23-2016
1.50
Layout the parts
Details
12-03-2016
1.00
Positioning left side of front seatback
Details
11-12-2016
3.00
Positioning front seatback
Details
11-05-2016
2.00
Position Instrument Panel Bulkhead
Details
10-30-2016
1.00
Locate IP and Seatback positions
Details
10-29-2016
2.00
Aligning F22 and Sides
Details
10-15-2016
1.50
Sanded front right fuselage side
Details
10-10-2016
2.00
Level left fuselage side
Details
10-01-2016
4.00
Leveling RS fuselage side in jig
Details
09-03-2016
1.00
Placing fuselage sides in temp firewall
Details
08-13-2016
2.00
Install brace to support temporary firewall
Details
08-07-2016
0.50
Installing temporary firewall to jig
Details
07-10-2016
1.50
Nail 2x4s to plank
Details
07-09-2016
0.50
Draw Centreline on plank
Details
07-03-2016
1.00
Leveling 10 foot plank
Details
06-26-2016
1.00
Adjusted fit of temporary firewall (right side)
Details
06-25-2016
1.00
Temp Firewall left side fit adjustments
Details
06-17-2016
1.00
F-22 positioning
Details
SITE NAVIGATION
Contact Builder
Cozy MKIV Home
Cozy MKIV Home
Category
# Logs
# Hours
All
450
903
Chap 14: Centresecti
1
10
Chap 3 : Training
17
58
Chap 4 : Bulkheads
116
180
Chap 5: Fuselage Sid
79
128
Chapter 6: Fuselage
113
215
Chapter 7: Fuselage
46
116
Chapter 8
30
64
Miscellaneous
9
3
Other Cozy Projects
1
1
Tools
3
10
Training & Preparati
17
58
Training & Setup
17
58
Wings
1
2
Copyright © 2001-2024 Matronics. All Rights Reserved.