Date
|
Hours
|
Work Log Summary

|
Details

|
04-24-2020
|
3.00
|
Oil Door, Inspection Plate, Avionics Update
|
Details
|
  |
|
03-30-2020
|
2.50
|
Misc. Prep for First Flight
|
Details
|
  |
|
03-13-2020
|
2.00
|
Aircraft Review by Rich Jankowski
|
Details
|
  |
|
03-10-2020
|
5.00
|
Installed Fairings & Data Plate. Modified Seats
|
Details
|
  |
|
02-26-2020
|
4.00
|
Airworthiness Inspection Corrections
|
Details
|
  |
|
02-24-2020
|
4.00
|
DAR Inspection
|
Details
|
  |
|
02-23-2020
|
8.00
|
Final Prep for DAR Inspection
|
Details
|
  |
|
02-22-2020
|
7.75
|
Install Inlet Seals, Seat Belts; RTV Baffle Sealin
|
Details
|
  |
|
02-19-2020
|
6.50
|
Engine Start, Calibrated AHARS & Magnetometer
|
Details
|
  |
|
02-04-2020
|
4.00
|
Replaced Left Door Seal. Installed Wing Walk Tape
|
Details
|
  |
|
02-03-2020
|
3.00
|
Re-installed Rudder Trim. Removed Van's Left Door
|
Details
|
  |
|
01-30-2020
|
3.25
|
Weigh Airplane
|
Details
|
  |
|
01-29-2020
|
4.25
|
Preparing for Weighing
|
Details
|
  |
|
01-28-2020
|
4.50
|
Getting Ready to Weigh
|
Details
|
  |
|
01-16-2020
|
6.75
|
ELT Install, Cowl Support Bracket, Exhaust Pipes
|
Details
|
  |
|
01-15-2020
|
6.25
|
Mag Timing. Brake Bleeding
|
Details
|
  |
|
01-09-2020
|
6.25
|
Rudder Trim, Door Seal, Preservative Oil Drain
|
Details
|
  |
|
12-09-2019
|
5.50
|
Nameplate, Seat Floors, Aileron Trim Servo
|
Details
|
  |
|
10-23-2019
|
7.00
|
Cut Left Stick, Installed Antennas & Baggage Seal
|
Details
|
  |
|
10-22-2019
|
7.75
|
Fuel Caps, Heater Cable Safety Wire, Stick Cutting
|
Details
|
  |
|
10-01-2019
|
4.25
|
Cut Shelves and Cleaned Out Richmond Shop
|
Details
|
  |
|
09-25-2019
|
5.25
|
Shop Unpacked; Reinstalled Gear Pants Brackets
|
Details
|
  |
|
09-24-2019
|
4.50
|
Moved Shelves to Airport
|
Details
|
  |
|
09-23-2019
|
8.50
|
Moved Shop to KARM Airport
|
Details
|
  |
|
09-20-2019
|
5.00
|
Packing Shop for Move to Airport
|
Details
|
  |
|
09-19-2019
|
2.00
|
Packing Shop for Move to Airport
|
Details
|
  |
|
09-17-2019
|
5.50
|
Packing Shop for Move to Airport
|
Details
|
  |
|
09-16-2019
|
3.50
|
Moved Fuselage to Wharton Airport KARM
|
Details
|
  |
|
09-13-2019
|
6.00
|
Right Seat Rails, Front Ovhd Lights, Heat Shld
|
Details
|
  |
|
09-10-2019
|
5.25
|
Left Heat Inlet, G5 Install, Vent Fan Trim Rings
|
Details
|
  |
|
09-09-2019
|
7.50
|
Reinstall Panels, Wired Sure Start, Install Heater
|
Details
|
  |
|
09-06-2019
|
6.50
|
Installed GTP 59 ; Installed Throttle Quadrant
|
Details
|
  |
|
08-26-2019
|
7.75
|
Complete Brake & Alt Air Cables, Install Right Win
|
Details
|
  |
|
08-23-2019
|
4.00
|
Parking Break Cable & Paint Inside Lower Cowl
|
Details
|
  |
|
06-08-2016
|
2.00
|
Built DRDT Platform
|
Details
|
  |
|
06-07-2016
|
2.50
|
Inventory Tools
|
Details
|
  |
|
06-06-2016
|
7.50
|
Inventory Quick Build Kits
|
Details
|
|
|
05-30-2016
|
3.00
|
Quick Build Kits Delivered
|
Details
|
|