Powered By Kitlog Pro v2.0
Richard's Web Site
AirCam
Rigging
Work Logs Found:
8
Category Work Time:
17 Hours
Date
Hours
Work Log Summary
Details
05-21-2016
1.00
Attach rear bolts for fly wire attachment.
Details
05-18-2016
2.50
Mount wings temporaily
Details
05-17-2016
3.00
Attach hardware required for Rigging
Details
05-17-2016
2.00
Attach forward and aft strut attachment points to
05-17-2016
0.50
Attach for and aft strut attachment points
03-13-2016
3.00
Prepare to attach the center section
Details
03-06-2016
2.00
Attach the tail wheel
Details
03-05-2016
3.00
Attach the tail vertical
Details
SITE NAVIGATION
Contact Builder
AirCam Home
Category
# Logs
# Hours
All
246
720
Ailerons
2
10
Attaching and Riging
8
17
Brakes
1
2
Center Section
30
64
Electrical
17
58
Elevator
20
52
Engine
30
105
Fabric
14
19
Flaps
3
8
Fuselage
3
18
General Remarks
1
0
Horizontal Stabilize
23
73
Instruments
13
37
Miscellaneous
2
4
Move to HND
3
8
Paint
9
34
Prop
1
3
Rigging
8
17
Rudder
6
20
Shop Supplies
1
6
Throttle controlls
2
6
Throttle controls
2
6
Vertical Stabilizer
21
62
Wings
23
79
Wiring
3
12
Copyright © 2001-2024 Matronics. All Rights Reserved.