Powered By Kitlog Pro v2.0
THOMAS'S WEB SITE
Cherry BX-2
Retractable Gear
Work Logs Found:
97
Category Work Time:
252 Hours
Date
Hours
Work Log Summary
Details
12-14-2016
4.00
Reinforcement Main Gear Axle
Details
09-14-2016
2.00
Modification to the Nose Wheel Installation
09-11-2016
2.00
Modification to the Nose Wheel Installation
Details
08-01-2016
0.00
Gear Cable Protections
08-01-2016
0.00
Gear Cable Protections
07-30-2016
6.00
Gear Cable Protections
Details
07-30-2016
0.00
Gear Cable Protections
07-28-2016
4.00
Gear Cable Protections
Details
07-26-2016
1.00
Braking Reservoir
Details
06-23-2016
0.00
Braking System
Details
03-07-2016
5.00
Changing Damper Installation
Details
03-07-2016
0.00
Changing Damper Installation
Details
03-07-2016
0.00
Changing Damper Installation
Details
03-01-2016
4.00
Changing Damper Installation
02-12-2016
3.00
Nose Wheel Shimmy Installation
Details
02-05-2016
0.00
Gear Latch Mechanism
Details
02-05-2016
6.00
Gear Latch Installation
02-04-2016
3.00
Gear Latch Mechanism
Details
02-03-2016
5.00
Installed the Nose Strut again
02-01-2016
1.00
Repositioned Nose Wheel Pivot
Details
01-23-2016
4.00
Installing the Gear Cables
Details
01-23-2016
0.00
Gear Test
01-23-2016
0.00
Gear Test
01-21-2016
2.00
Completed Main Gear Squat Switch Installation
Details
01-20-2016
3.00
Manufactured Steering Parts
Details
01-18-2016
3.00
Sealed off some Wood and drilled Holes for Steerin
01-15-2016
5.00
Nose Wheel Alignment
Details
01-14-2016
3.00
Some Minor Work
01-14-2016
0.00
Nose Wheel Damper Pivot
01-11-2016
2.00
Squat Switch Installation Main Gear
Details
01-11-2016
2.00
Nose Wheel Safety Latch
01-11-2016
0.00
Nose Wheel Safety Latch
Details
01-09-2016
2.00
Squat Switch Installation Main Gear
Details
01-08-2016
0.00
Nosewheel Squat Switch
01-08-2016
6.00
Nosewheel Safety Latch
Details
01-08-2016
0.00
Nosewheel Safety Latch
01-08-2016
0.00
Nosewheel Safety Latch
01-07-2016
7.00
Nosewheel Fork
Details
01-07-2016
0.00
Nosewheel Fork
01-07-2016
0.00
Nosewheel Fork
01-07-2016
0.00
Nosewheel Fork
01-07-2016
0.00
Nosewheel Fork
01-07-2016
0.00
Nosewheel Fork
01-06-2016
5.00
Gear Lever Mechanism
Details
01-06-2016
0.00
Gear Lever Mechanism
01-05-2016
0.00
Gear Lever Mechanism
Details
01-05-2016
0.00
Gear Lever Mechanism
Details
01-05-2016
5.00
Diverting Pulley Assembly
Details
01-05-2016
0.00
Diverting Pulley Assembly
01-04-2016
2.00
Reinforcement Diverting Pulley Assembly
01-04-2016
0.00
Reinforcement Diverting Pulley Assembly
01-02-2016
0.00
Reinforcement Diverting Pulley Assembly
Details
01-02-2016
2.00
Diverting Pulley Assembly
Details
01-01-2016
2.00
Gearlever Stopend
Details
01-01-2016
0.00
Gearlever Stopend
12-30-2015
6.00
Diverting Pulley Assembly
Details
12-30-2015
0.00
Diverting Pulley Assembly
Details
12-30-2015
0.00
Diverting Pulley Assembly
Details
12-30-2015
0.00
Diverting Pulley Assembly
Details
12-29-2015
4.00
Diverting Pulley Assembly
12-23-2015
2.50
Diverting Pulley Assembly
Details
12-23-2015
0.00
Diverting Pulley Assembly
12-22-2015
4.00
Diverting Pulley Assembly
Details
12-21-2015
4.00
Diverting Pulley Assembly
12-21-2015
0.00
Diverting Pulley Assembly
12-21-2015
0.00
Diverting Pulley Assembly
12-18-2015
2.00
D55/1
Details
12-18-2015
0.00
D55/1
12-17-2015
6.00
Finishing up D55/1
Details
12-17-2015
0.00
D55/1
12-17-2015
0.00
D55/1
Details
12-17-2015
0.00
D55/1
12-17-2015
0.00
D55/1
12-16-2015
0.00
Seilscheibe D55/1 Part 2
12-15-2015
0.00
Seilscheibe D55/1 part 3
Details
12-14-2015
30.00
SeilscheibeD 55/1 Part 3
Details
12-14-2015
0.00
Seilscheibe D55/1 Part 3
12-14-2015
0.00
Seilscheibe D 55/1 Part 3
04-04-2012
0.00
Stands on its own Legs
03-23-2012
4.00
Painting Main Gear Legs
03-24-2011
5.00
Installing Nosegear Mechanism
03-20-2010
20.00
Laminating Maingeartube at Pivot
01-18-2010
10.00
Nosegear
01-16-2010
6.00
Nosewheelstrut
01-14-2010
8.00
Nosegear
Details
01-08-2010
5.00
Riveting the Drivetube
01-08-2010
0.00
Closing the Rivet
01-01-2010
5.00
Installing the Bearing
11-18-2009
5.00
Checking Basic Gear Mechanism
11-16-2009
6.00
Wheels and Brakes
11-16-2009
0.00
Wheelattachment
11-11-2009
0.00
Brakes
09-11-2009
4.00
Gear Mechanism
08-27-2009
4.00
Gearmechanism
07-11-2009
5.00
Constructing the Retractable Gear Mechanism
05-05-2009
3.00
Producing correct Radius for the later Glassfibers
04-29-2009
3.00
Main Gear Legs
SITE NAVIGATION
Contact Builder
Cherry BX-2 Home
Category
# Logs
# Hours
All
482
4021
Avionics/Instrument
8
12
Electrics/Instrument
8
12
Engine
63
176
Fuselage
151
306
Horizontal Stab.
32
68
Miscellaneous
1
2
Prebuilding Hours no
1
3000
Projectinspection
5
10
Prop
12
42
Retractable Gear
97
252
Seating
14
21
Stand
4
15
Tank
60
52
Vertical Stabilizer
19
43
Wing Loading Test
4
10
Workshop
3
Copyright © 2001-2024 Matronics. All Rights Reserved.