Work Logs Found: 19
Category Work Time: 125 Hours
 Date
Hours
Work Log Summary

Details

 02-29-2016
4.00
INSATLLING THE FT MANIFOLD
Details

 02-29-2016
8.00
HYD RESERVIOR AND PUMP UNIT
Details

 02-29-2016
4.00
HYD PUMP PRESSURE ADJUSTMENT
Details

 02-29-2016
6.00
ASSEMBLING THE AFT MANIFOLD
Details

 02-23-2016
2.00
THERMO RELIEF VALVE
Details

 02-23-2016
20.00
ROUTING HYDRAULIC LINES
Details

 02-23-2016
8.00
INSTALLING THE ACCUMULATOR
Details

 02-23-2016
6.00
HYD FILTER AND CHECK V
Details

 02-23-2016
4.00
FORWARD HYDRAULIC MANIFOLD
Details

 02-23-2016
20.00
FABRICATING HYDRAULIC LINES
Details

 02-23-2016
3.00
EMERGENCY BY-PASS VALVE
Details

 02-22-2016
2.00
PRESSURE SWITCH ADJUSTMENT
Details

 02-22-2016
2.00
LANDING GEAR SWITCH INSTALL/ADJUSTMENT
Details

 02-22-2016
10.00
HYD SYSTEM STRATUP AND TEST PRODCEDURE
Details

 02-22-2016
12.00
FLUSHING THE HYD SYSTEM
Details

 02-22-2016
6.00
FLUSHING THE ACTUATORS
Details

 02-22-2016
4.00
COUNTER BALANCE V ADJUSTMENT
Details

 02-11-2016
2.00
INSTALL NOSE GEAR MICRSWITCH
Details

 10-21-2015
2.00
RESERVIOR OVERFLOW TANK
Details