Powered By Kitlog Pro v2.0
DAVID'S WEB SITE
Evolution
3 horizontal stab /
Work Logs Found:
19
Category Work Time:
232 Hours
Date
Hours
Work Log Summary
Details
05-16-2015
4.00
VENT HOLES
Details
05-16-2015
6.00
TRIMMING THE ELEVATOR AND THE HORIZONTAL STABILIZE
Details
05-16-2015
0.00
Setting elevator trim tab
Details
05-16-2015
0.00
INSTALLATION OFF ELEVATOR TORQUE TUBE
Details
05-16-2015
8.00
INSTALL STATIC WICKS
Details
05-16-2015
0.00
INSTALL ELEVATOR ACCESS PANELS
Details
05-16-2015
0.00
INSTALL CONTROL STICK BRACKET
Details
05-16-2015
200.00
INSTALL CENTRE HORIZONTAL STAB HINGE
Details
05-16-2015
2.00
INSALL ELEVATOR CONTROL HORN
Details
05-16-2015
0.00
FORWARD MOUNT INSLALLATION
Details
05-16-2015
6.00
ELEVATOR TRIM TAB STIFFENING
Details
05-16-2015
0.00
CENTRE ELEVATO HINGE BEARING REPLACMNET
Details
05-16-2015
0.00
BUILD PROCESS HORIZONTAL STAB
Details
05-16-2015
0.00
BALANCING THE ELEVATORS
Details
05-16-2015
0.00
ASSENBLE ELEVATOR
Details
05-16-2015
0.00
3.2.L
Details
04-07-2015
2.00
INSTALL HORIZONTAL STAB HINGES
Details
04-06-2015
2.00
INSTALL AFT HINGE PIECES TO ELEVATOR
Details
09-20-2014
2.00
INSTALL ELEVATOR UP TRAVEL STOP
Details
SITE NAVIGATION
Contact Builder
Evolution Home
Category
# Logs
# Hours
All
227
1207
10 fuselage
14
113
11 hyd sys
19
125
12 fuel sys
8
42
13 brake sys
9
34
14 seat/saet belts
11
41
15 main door
12
23
16 heat/vent/air con
11
56
17 baggage door
8
38
18 pitot static
1
8
19 elec and avionics
14
57
20 auto pilot
4
22
21 nose gear
14
68
3 horizontal stab /
19
232
31 ice rain protecti
10
73
4 rudder
16
62
5 wings
20
90
6 flaps
5
7
7 aileron
11
50
8 landing gear
12
37
9 gear doors
4
25
duplicate inspection
1
4
Shop Supplies
4
Copyright © 2001-2024 Matronics. All Rights Reserved.