Powered By Kitlog Pro v2.0
DAVID'S WEB SITE
Evolution
4 rudder
Work Logs Found:
16
Category Work Time:
62 Hours
Date
Hours
Work Log Summary
Details
05-16-2015
8.00
U JOINT AND FWD CAPSTN
Details
05-16-2015
2.00
TORQUE TUBE DICONNECTION FOR BATTERY REMOVAL
Details
05-16-2015
1.00
RUDDER VENT HOLES
Details
05-16-2015
6.00
RUDDER TAIL CAP
Details
05-16-2015
2.00
RUDDER PULLEYS
Details
05-16-2015
4.00
RUDDER PEDAL SIDE BRAKET INSALLATION
Details
05-16-2015
4.00
RUDDER CABLE STAND OFF
Details
05-16-2015
3.00
RUDDER BUILD PROCEDURES
Details
05-16-2015
4.00
RIGGING THE RUDDER
Details
05-16-2015
2.00
INSTALL RUDDER CONTROL ACCESS PANEL
Details
05-16-2015
2.00
INSALLING TH RUDDER HARDWARE
Details
05-16-2015
2.00
CAPSTAN INSTALATION AT THE RUDDER
Details
05-16-2015
6.00
BRAKE MASTER CYLINDER
Details
05-16-2015
4.00
BALANCING THE RUDDER
Details
05-16-2015
6.00
ASSEMBLY OFF RUDDER PAEDALS
Details
05-16-2015
6.00
ADJUSTABLE RUDDER PEDALS
SITE NAVIGATION
Contact Builder
Evolution Home
Category
# Logs
# Hours
All
227
1207
10 fuselage
14
113
11 hyd sys
19
125
12 fuel sys
8
42
13 brake sys
9
34
14 seat/saet belts
11
41
15 main door
12
23
16 heat/vent/air con
11
56
17 baggage door
8
38
18 pitot static
1
8
19 elec and avionics
14
57
20 auto pilot
4
22
21 nose gear
14
68
3 horizontal stab /
19
232
31 ice rain protecti
10
73
4 rudder
16
62
5 wings
20
90
6 flaps
5
7
7 aileron
11
50
8 landing gear
12
37
9 gear doors
4
25
duplicate inspection
1
4
Shop Supplies
4
Copyright © 2001-2024 Matronics. All Rights Reserved.