Darrel's Kitfox - SS7
Work Logs Found: 119
Category Work Time: 501 Hours
 Date
Hours
Work Log Summary

Details

 06-05-2020
4.10
Wired the right wing
Details
       

 06-03-2020
4.90
Installed the fuel lines
Details

 05-31-2020
2.50
Installed the wings
Details
     

 05-21-2020
3.80
Finished the turtle deck hinge installation
Details
 

 05-20-2020
2.50
More work on turtle deck hinge
Details
 

 05-19-2020
7.90
Began installing the turtle deck hinge
Details
 

 04-24-2020
4.10
Decals and glare shield
Details
     

 04-04-2020
3.80
Worked on door latches
Details
 

 04-02-2020
4.50
Installed the door springs on the right door
Details

 03-29-2020
6.20
Worked on door latch install
Details
 

 03-23-2020
0.50
Installed fuselage drain holes
Details

 03-22-2020
1.50
Installed correct fastners
Details

 03-21-2020
0.50
Installed correct nuts
Details

 03-11-2020
3.10
Body work
Details

 03-10-2020
2.90
Body work
Details

 03-09-2020
4.20
Installed the seat pan doors
Details
     

 01-21-2020
4.10
Added brake fluid
Details

 01-08-2020
4.50
Completed canopy and heater installation
Details
       

 01-07-2020
4.50
Glare shield install and started finish work on wi
Details

 01-06-2020
3.20
More glare shield activity
Details
     

 01-05-2020
3.80
More fit activity to fit the glare shield
Details

 01-04-2020
5.00
First rough install of glare shield
Details
       

 01-03-2020
6.70
Final fit and assembly of doors
Details
       

 01-02-2020
5.50
Rough install both doors
Details
     

 01-01-2020
6.10
Various
Details
       

 12-31-2019
2.50
Install brake line
Details
     

 12-26-2019
3.20
Installedl brake lines and more oil cooler design
Details

 12-24-2019
3.80
Installed brake fluid reservoir
Details

 12-22-2019
4.00
Various
Details
       

 12-19-2019
1.90
Fabricated inside plate matching outside fairing
Details

 12-07-2019
5.50
Completed rudder cable installation
Details
       

 12-06-2019
3.00
Began setting up for rudder cable completion
Details

 11-28-2019
1.50
Installed the oil tank access door
Details

 11-27-2019
5.50
Laid up the last glass tape on the cowl flange
Details
       

 11-24-2019
2.90
Laid up cowling to windshield flange
Details
     

 11-20-2019
6.80
Installed the turtle deck
Details
       

 11-19-2019
4.60
Installed rear port window and roughed in turtlede
Details
       

 11-18-2019
7.00
Installed rear window, transponder, header tank
Details
       

 11-17-2019
1.50
Prep for and added cowling fix
Details
 

 11-16-2019
1.50
Fabricated in installed spacers
Details
     

 11-14-2019
6.50
Installed 5th camloc and top cowl windshield flang
Details
       

 11-13-2019
7.20
Bolt clearance improved, water pump housing replac
Details
       

 11-12-2019
5.20
Completed final fit cuts and installed the windshi
Details
       

 11-11-2019
1.20
Cut the forward length of the windshield
Details
     

 11-10-2019
4.20
Drilled windshield mounting hole
Details
       

 11-09-2019
6.00
Installed camlocs
Details
 

 11-08-2019
4.20
Made final cuts to windshield and top cowl
Details

 11-04-2019
8.00
Windshield and top cowling final placement
Details
       

 11-03-2019
2.00
More cutting and fitting on the windshield
Details
     

 11-02-2019
4.00
More cutting on the windshield
Details
       

 11-01-2019
4.60
Began fitting the upper cowl
Details
 

 10-31-2019
2.50
Continued fitting the lower cowl
Details
     

 10-29-2019
2.90
Began fitting the lower cowl
Details

 10-26-2019
2.50
Fitted the cowling together
Details
       

 10-16-2019
7.00
Installed the butt ribs
Details
 

 02-23-2019
2.80
Re-routed and re-tie the wiring in the fuselage
Details
       

 02-18-2019
3.80
Cut and dry fit rear window
Details
     

 02-17-2019
5.50
Install rear windows
Details

 01-09-2019
5.70
Continued setting control stops
Details
       

 01-08-2019
3.00
Begn setting control linkages
Details
     

 01-05-2019
2.00
Installed the HT in prep for setting control stops
Details
       

 12-23-2018
2.50
Installed tilt feature for instrument panel
Details
       

 08-16-2018
5.00
More on radiator install
Details
     

 08-13-2018
0.50
Re-painted the firewall support tubes
Details

 08-12-2018
4.10
Completed engine radiator installation
Details
       

 08-11-2018
3.50
Continued analyzing and installing radiators
Details
       

 08-10-2018
1.50
Install co-pilot radiator mounting plate
Details
 

 08-08-2018
0.90
Refigured the firewall
Details

 08-03-2018
6.00
Instrument panel bracing and HT ends
Details
       

 08-02-2018
3.50
Added ends to HT and worked on instrument panel
Details
       

 07-31-2018
3.30
Aero fairings and instrument panel
Details

 07-24-2018
8.00
Installed the cabin heater
Details
       

 07-23-2018
2.50
Completed install of firewall pass-throughs
Details

 07-22-2018
4.30
Fabricated overflow bottle bracket
Details

 07-21-2018
6.50
Completed firewall
Details
       

 07-20-2018
6.20
Bonded mounting clips and varnished H/T
Details
 

 07-19-2018
4.00
More firewall install activity
Details

 07-17-2018
6.00
Firewall assembly
Details

 07-16-2018
8.00
Began assemblying the firewall
Details
     

 07-15-2018
3.50
Installed header tank
Details
 

 07-14-2018
3.50
Installed elevator trim
Details
     

 07-13-2018
1.50
Prepped elevator trim motor
Details

 07-02-2018
3.50
Finished co-pilot's window and prepped for H/T
Details

 06-29-2018
2.00
Finished pilot's window
Details

 06-28-2018
5.20
Continued installing the windows
Details

 06-27-2018
4.20
Completed rough fit of co-pilot's window
Details
       

 06-26-2018
5.50
Rough install the pilot side window
Details

 06-22-2018
2.00
Epoxied last part and fabricated door hinges
Details
     

 06-21-2018
4.90
Finish install door frame and fuse stringer
Details

 06-20-2018
6.20
Completed copilot's door frame and right stringer
Details
       

 06-18-2018
4.60
Complete starboard door frame
Details
       

 06-17-2018
4.50
Window and door install
Details

 06-16-2018
2.00
Started install of side stringers
Details

 06-15-2018
8.00
Installation of rudder cables and seat pan
Details
       

 06-14-2018
4.50
Seat pan final fit and installed bushings on cable
Details
     

 06-13-2018
4.00
Fitting seat pan
Details
     

 06-12-2018
2.00
Loose ends
Details
 

 06-11-2018
6.50
Fixes and started seat pan installation
Details
       

 06-06-2018
3.00
Continued installing the rudder cables
Details

 06-05-2018
2.50
Began installing the rudder cables
Details

 06-01-2018
6.10
Final install of rudder pedals
Details
     

 05-21-2018
3.30
Installed nut plate on the console side panels
Details
 

 05-17-2018
3.10
Pedal alignment
Details
     

 05-16-2018
2.20
Ruder pedal install and epoxy floorboards
Details
 

 05-15-2018
5.70
Rudder pedal assembly
Details
     

 05-14-2018
8.50
Rudder pedal adjustment levers and rudder pedals
Details
       

 05-13-2018
5.20
Prepared pedal assembly components
Details
 

 05-12-2018
8.00
Completed fitting flap handle
Details

 05-11-2018
1.50
Dry fit the flap lever

 05-10-2018
4.10
Floorboard install and begin console
Details
       

 05-08-2018
7.20
Completed installing the control system
Details
       

 05-07-2018
9.00
Onward and Upward
Details
       

 05-06-2018
5.20
A crappy day
Details
       

 05-05-2018
5.10
Fixing issues
Details
     

 05-04-2018
4.50
Cont'd assembling control linkage components
Details
     

 05-02-2018
1.50
Cont'd making control linkage assemblies
Details
       

 04-30-2018
4.10
Continued assembly and installation of control lin
Details
       

 04-29-2018
5.50
Continued work on flight control installation
Details

 04-28-2018
5.00
Began work on the control system
Details
       