Darrel's Kitfox - SS7
DEW2
Fuselage
Work Logs Found:
119
Category Work Time:
501 Hours
Date
Hours
Work Log Summary
Details
06-05-2020
4.10
Wired the right wing
Details
06-03-2020
4.90
Installed the fuel lines
Details
05-31-2020
2.50
Installed the wings
Details
05-21-2020
3.80
Finished the turtle deck hinge installation
Details
05-20-2020
2.50
More work on turtle deck hinge
Details
05-19-2020
7.90
Began installing the turtle deck hinge
Details
04-24-2020
4.10
Decals and glare shield
Details
04-04-2020
3.80
Worked on door latches
Details
04-02-2020
4.50
Installed the door springs on the right door
Details
03-29-2020
6.20
Worked on door latch install
Details
03-23-2020
0.50
Installed fuselage drain holes
Details
03-22-2020
1.50
Installed correct fastners
Details
03-21-2020
0.50
Installed correct nuts
Details
03-11-2020
3.10
Body work
Details
03-10-2020
2.90
Body work
Details
03-09-2020
4.20
Installed the seat pan doors
Details
01-21-2020
4.10
Added brake fluid
Details
01-08-2020
4.50
Completed canopy and heater installation
Details
01-07-2020
4.50
Glare shield install and started finish work on wi
Details
01-06-2020
3.20
More glare shield activity
Details
01-05-2020
3.80
More fit activity to fit the glare shield
Details
01-04-2020
5.00
First rough install of glare shield
Details
01-03-2020
6.70
Final fit and assembly of doors
Details
01-02-2020
5.50
Rough install both doors
Details
01-01-2020
6.10
Various
Details
12-31-2019
2.50
Install brake line
Details
12-26-2019
3.20
Installedl brake lines and more oil cooler design
Details
12-24-2019
3.80
Installed brake fluid reservoir
Details
12-22-2019
4.00
Various
Details
12-19-2019
1.90
Fabricated inside plate matching outside fairing
Details
12-07-2019
5.50
Completed rudder cable installation
Details
12-06-2019
3.00
Began setting up for rudder cable completion
Details
11-28-2019
1.50
Installed the oil tank access door
Details
11-27-2019
5.50
Laid up the last glass tape on the cowl flange
Details
11-24-2019
2.90
Laid up cowling to windshield flange
Details
11-20-2019
6.80
Installed the turtle deck
Details
11-19-2019
4.60
Installed rear port window and roughed in turtlede
Details
11-18-2019
7.00
Installed rear window, transponder, header tank
Details
11-17-2019
1.50
Prep for and added cowling fix
Details
11-16-2019
1.50
Fabricated in installed spacers
Details
11-14-2019
6.50
Installed 5th camloc and top cowl windshield flang
Details
11-13-2019
7.20
Bolt clearance improved, water pump housing replac
Details
11-12-2019
5.20
Completed final fit cuts and installed the windshi
Details
11-11-2019
1.20
Cut the forward length of the windshield
Details
11-10-2019
4.20
Drilled windshield mounting hole
Details
11-09-2019
6.00
Installed camlocs
Details
11-08-2019
4.20
Made final cuts to windshield and top cowl
Details
11-04-2019
8.00
Windshield and top cowling final placement
Details
11-03-2019
2.00
More cutting and fitting on the windshield
Details
11-02-2019
4.00
More cutting on the windshield
Details
11-01-2019
4.60
Began fitting the upper cowl
Details
10-31-2019
2.50
Continued fitting the lower cowl
Details
10-29-2019
2.90
Began fitting the lower cowl
Details
10-26-2019
2.50
Fitted the cowling together
Details
10-16-2019
7.00
Installed the butt ribs
Details
02-23-2019
2.80
Re-routed and re-tie the wiring in the fuselage
Details
02-18-2019
3.80
Cut and dry fit rear window
Details
02-17-2019
5.50
Install rear windows
Details
01-09-2019
5.70
Continued setting control stops
Details
01-08-2019
3.00
Begn setting control linkages
Details
01-05-2019
2.00
Installed the HT in prep for setting control stops
Details
12-23-2018
2.50
Installed tilt feature for instrument panel
Details
08-16-2018
5.00
More on radiator install
Details
08-13-2018
0.50
Re-painted the firewall support tubes
Details
08-12-2018
4.10
Completed engine radiator installation
Details
08-11-2018
3.50
Continued analyzing and installing radiators
Details
08-10-2018
1.50
Install co-pilot radiator mounting plate
Details
08-08-2018
0.90
Refigured the firewall
Details
08-03-2018
6.00
Instrument panel bracing and HT ends
Details
08-02-2018
3.50
Added ends to HT and worked on instrument panel
Details
07-31-2018
3.30
Aero fairings and instrument panel
Details
07-24-2018
8.00
Installed the cabin heater
Details
07-23-2018
2.50
Completed install of firewall pass-throughs
Details
07-22-2018
4.30
Fabricated overflow bottle bracket
Details
07-21-2018
6.50
Completed firewall
Details
07-20-2018
6.20
Bonded mounting clips and varnished H/T
Details
07-19-2018
4.00
More firewall install activity
Details
07-17-2018
6.00
Firewall assembly
Details
07-16-2018
8.00
Began assemblying the firewall
Details
07-15-2018
3.50
Installed header tank
Details
07-14-2018
3.50
Installed elevator trim
Details
07-13-2018
1.50
Prepped elevator trim motor
Details
07-02-2018
3.50
Finished co-pilot's window and prepped for H/T
Details
06-29-2018
2.00
Finished pilot's window
Details
06-28-2018
5.20
Continued installing the windows
Details
06-27-2018
4.20
Completed rough fit of co-pilot's window
Details
06-26-2018
5.50
Rough install the pilot side window
Details
06-22-2018
2.00
Epoxied last part and fabricated door hinges
Details
06-21-2018
4.90
Finish install door frame and fuse stringer
Details
06-20-2018
6.20
Completed copilot's door frame and right stringer
Details
06-18-2018
4.60
Complete starboard door frame
Details
06-17-2018
4.50
Window and door install
Details
06-16-2018
2.00
Started install of side stringers
Details
06-15-2018
8.00
Installation of rudder cables and seat pan
Details
06-14-2018
4.50
Seat pan final fit and installed bushings on cable
Details
06-13-2018
4.00
Fitting seat pan
Details
06-12-2018
2.00
Loose ends
Details
06-11-2018
6.50
Fixes and started seat pan installation
Details
06-06-2018
3.00
Continued installing the rudder cables
Details
06-05-2018
2.50
Began installing the rudder cables
Details
06-01-2018
6.10
Final install of rudder pedals
Details
05-21-2018
3.30
Installed nut plate on the console side panels
Details
05-17-2018
3.10
Pedal alignment
Details
05-16-2018
2.20
Ruder pedal install and epoxy floorboards
Details
05-15-2018
5.70
Rudder pedal assembly
Details
05-14-2018
8.50
Rudder pedal adjustment levers and rudder pedals
Details
05-13-2018
5.20
Prepared pedal assembly components
Details
05-12-2018
8.00
Completed fitting flap handle
Details
05-11-2018
1.50
Dry fit the flap lever
05-10-2018
4.10
Floorboard install and begin console
Details
05-08-2018
7.20
Completed installing the control system
Details
05-07-2018
9.00
Onward and Upward
Details
05-06-2018
5.20
A crappy day
Details
05-05-2018
5.10
Fixing issues
Details
05-04-2018
4.50
Cont'd assembling control linkage components
Details
05-02-2018
1.50
Cont'd making control linkage assemblies
Details
04-30-2018
4.10
Continued assembly and installation of control lin
Details
04-29-2018
5.50
Continued work on flight control installation
Details
04-28-2018
5.00
Began work on the control system
Details
SITE NAVIGATION
Contact Builder
H-5 Home
DEW2 Home
Category
# Logs
# Hours
All
645
3091
Avionics
39
154
Basic Kit
3
14
Empennage
25
214
Engine
33
130
Engine
2
7
Fabric cover
82
293
Final assembly
9
48
Fuselage
119
701
Inspection
1
1
Kitfox Avionics
39
154
Kitfox tooling
6
14
Kitfox Undercarriage
11
45
Kitfox wings
64
389
Lighting
2
12
Miscellaneous
26
111
Modifications
11
21
Paint System
86
330
Tooling
2
0
Tooling
6
14
Tools
2
0
Undercarriage
11
45
Wings
2
5
Wings
64
389