Date
|
Hours
|
Work Log Summary

|
Details

|
10-31-2021
|
3.00
|
Reinstallation of the elevator push rod and autopi
|
Details
|
|
|
10-30-2021
|
9.00
|
Electrical wiring, mount VPX-Pro and rear ski rack
|
Details
|
|
|
10-16-2021
|
11.00
|
Rivet on the rear fuselage top skin
|
Details
|
|
|
10-15-2021
|
2.00
|
Rivet on rear bulkhead to top rear skin
|
|
  |
|
10-11-2021
|
1.50
|
Prep the rear fuselage for riveting on the top ski
|
Details
|
 |
|
10-03-2021
|
4.50
|
Firewall insulation and heat shield
|
Details
|
|
|
09-04-2021
|
6.50
|
nutplates for floor access
|
Details
|
  |
|
09-02-2021
|
2.00
|
Work on nutplates for floor access
|
|
  |
|
09-01-2021
|
1.50
|
Wrapped rear control stick with vinyl and worked o
|
|
  |
|
08-31-2021
|
1.00
|
Nutplates for removable access to fuselage floor
|
Details
|
  |
|
08-30-2021
|
2.50
|
Plate nuts for removable floor
|
Details
|
  |
|
08-25-2021
|
1.50
|
Started drilling and setting nutplates to make the
|
Details
|
  |
|
11-27-2020
|
4.50
|
completed the wing connection tabs for left and ri
|
Details
|
|
|
11-26-2020
|
6.00
|
Form flap fairing, debur, dimple, and rivet
|
Details
|
|
|
11-17-2020
|
1.50
|
Left wing root fairing attachement
|
Details
|
  |
|
11-16-2020
|
1.75
|
Drill, debur, dimple, and rivet on the nut plates
|
Details
|
|
|
09-07-2020
|
6.00
|
Nutplates for wing root fairing
|
Details
|
  |
|
08-01-2020
|
8.50
|
finish the wing attachments/fairings and remove th
|
Details
|
  |
|
07-17-2020
|
1.00
|
Trailing edge flap fairing
|
Details
|
  |
|
07-14-2020
|
1.50
|
Flap fairing and aileron edge alignment
|
Details
|
  |
|
07-13-2020
|
2.00
|
Adjusting flaps push rods and ailerons rods for be
|
Details
|
  |
|
07-11-2020
|
6.50
|
MFG, match drill, and trim wing root fairings
|
Details
|
|
|
07-09-2020
|
1.00
|
Fuel line from fuel pump to firewall
|
Details
|
 |
|
07-08-2020
|
1.50
|
Fabricate the fuel and vent lines
|
Details
|
|
|
07-07-2020
|
1.00
|
Fabricating fuel lines
|
Details
|
  |
|
07-06-2020
|
1.50
|
Left tank to fuselage lines
|
Details
|
  |
|
07-04-2020
|
8.50
|
Rebuilt the left tank bracket and install fuel pum
|
Details
|
|
|
07-02-2020
|
3.00
|
mounting flap assembly
|
Details
|
|
|
07-01-2020
|
1.75
|
Left flap assembly
|
Details
|
|
|
06-30-2020
|
2.00
|
Left flap assembly
|
Details
|
 |
|
06-29-2020
|
1.00
|
Flap push rod assembly
|
Details
|
  |
|
06-27-2020
|
5.00
|
Attache Aleron push rod assembly and adjust flight
|
Details
|
|
|
06-23-2020
|
1.50
|
mounting the 863 bracket to the fuselage
|
Details
|
  |
|
06-20-2020
|
3.00
|
Fab 860 tank bracket
|
Details
|
  |
|
06-19-2020
|
3.00
|
Bottom skin and tank attachment
|
Details
|
  |
|
06-18-2020
|
9.00
|
inserted the right wing and all measurements neces
|
Details
|
|
|
06-17-2020
|
5.00
|
Removed interior features and insert the left wing
|
Details
|
|
|
06-16-2020
|
9.50
|
Ran brake lines and wrapped the rib sections on ba
|
Details
|
|
|
06-15-2020
|
5.50
|
Modify rib between bagage compartment and instrume
|
Details
|
|
|
06-10-2020
|
2.00
|
sheet metal prep for forward skin
|
Details
|
|
|
04-29-2020
|
2.00
|
Alignment and riveting Baggage door
|
Details
|
|
|
02-26-2020
|
2.00
|
hardware assemble for forward baggage door
|
Details
|
|
|
06-01-2019
|
4.50
|
Baggage door assembly
|
Details
|
|
|
05-31-2019
|
2.00
|
Forward Baggage door
|
Details
|
|
|
05-30-2019
|
1.50
|
Match drilling and top skin assembly
|
Details
|
|
|
05-29-2019
|
2.50
|
Top skin assembly
|
Details
|
|
|
05-28-2019
|
2.50
|
Assembly of the instrument panel with notched flan
|
Details
|
|
|
05-27-2019
|
1.50
|
Working on the forward top skin
|
Details
|
|
|
05-27-2019
|
7.50
|
Prep and seal vent openings. Drill and seal stati
|
Details
|
|
|
05-25-2019
|
4.00
|
Remove bulkheads and top skin and finish dimpling
|
Details
|
 |
|
05-24-2019
|
2.00
|
Clecoing on the top tail skin
|
Details
|
 |
|
05-23-2019
|
1.50
|
Fabricate wood platforms for working on the tail s
|
Details
|
  |
|
05-22-2019
|
1.50
|
nutplates on gussetts.
|
Details
|
  |
|
05-18-2019
|
3.50
|
Started to work on the turtle back assembly
|
Details
|
  |
|
05-16-2019
|
3.50
|
Plumbing for fuel system
|
Details
|
|
|
05-09-2019
|
2.50
|
Work on fuel, vent lines, and valve.
|
Details
|
  |
|
05-08-2019
|
1.00
|
working on vent lines
|
Details
|
  |
|
05-04-2019
|
10.00
|
Assembled the rudder pedan assebmly
|
Details
|
|
|
04-27-2019
|
4.50
|
Rudder pedal assembly
|
Details
|
|
|
04-25-2019
|
3.50
|
Forward rudder pedal assembly
|
Details
|
|
|
04-23-2019
|
1.50
|
Rear rudder pedal assembly
|
Details
|
 |
|
04-22-2019
|
2.00
|
Rear Rudder pedal assembly
|
Details
|
  |
|
04-20-2019
|
3.50
|
Rear Rudder pedal assembly
|
Details
|
  |
|
04-18-2019
|
2.00
|
Rear rudder pedal assembly
|
Details
|
  |
|
04-17-2019
|
2.50
|
Front rudder pedal assembly
|
Details
|
  |
|
04-16-2019
|
1.25
|
bolt the rudder pedal cable guides to the cross me
|
Details
|
 |
|
04-15-2019
|
2.00
|
Mount flap motor to control arm and rivet the rudd
|
Details
|
  |
|
04-10-2019
|
2.00
|
Trim rudder stops to correct rudder travel
|
Details
|
|
|
04-05-2019
|
1.50
|
Connect the mid and aft pushrods for the elevators
|
Details
|
|
|
03-23-2019
|
4.00
|
Cut and connect control stick
|
Details
|
 |
|
03-20-2019
|
2.25
|
mounting control sticks and assembly
|
Details
|
  |
|
03-16-2019
|
11.00
|
Assembly of push rods
|
Details
|
|
|
03-09-2019
|
2.50
|
Bell housing assembly and fabricate the push-rod
|
Details
|
|
|
02-24-2019
|
1.00
|
Cut part of the counter weight from the right elev
|
Details
|
  |
|
02-13-2019
|
1.50
|
Bolting on concontrol surfaces
|
Details
|
|
|
02-11-2019
|
2.50
|
After removing and deburring the horizontan and ve
|
Details
|
  |
|
02-09-2019
|
0.00
|
Squaring the vertical stabilizer
|
|
|
|
02-09-2019
|
8.00
|
Mounting/attaching vertical stab.
|
Details
|
|
|
02-06-2019
|
1.50
|
Removed red copy and band, installed blue copy and
|
Details
|
|
|
02-04-2019
|
1.00
|
Temporary mount the vertical stabilizer
|
Details
|
|
|
01-26-2019
|
4.25
|
Mounting horizontal stabilizer
|
Details
|
|
|
01-24-2019
|
2.50
|
Vinyl wrap the rear yoke bracket, left throttle as
|
Details
|
|
|
01-22-2019
|
1.25
|
Match drill and rivet nuteplates on throttle assem
|
Details
|
  |
|
01-19-2019
|
6.00
|
interior console and throttle assembly
|
Details
|
|
|
01-17-2019
|
1.00
|
Wrap upper rear baggage compartment skin
|
Details
|
  |
|
01-17-2019
|
3.00
|
design and cut out pieces for a rear tail ski rack
|
Details
|
|
|
01-16-2019
|
3.00
|
Wrap pieces of the seat ramp assembly and rear bag
|
Details
|
|
|
01-15-2019
|
1.75
|
Match drill, debur, dimple, and rivet seat ramp ri
|
Details
|
  |
|
01-11-2019
|
2.25
|
Match drilling, deburing, and riveting nutplates
|
Details
|
  |
|
01-10-2019
|
1.75
|
Debur match dril cover plates for lower midcross m
|
Details
|
  |
|
01-09-2019
|
2.50
|
Rivet stiffiners and wrap both rear floor skins
|
Details
|
|
|
01-07-2019
|
2.25
|
Remove and replace some hardward, rivet nutplates
|
Details
|
  |
|
01-05-2019
|
4.00
|
Rivet and wrap forward floor skin
|
Details
|
 |
|
01-02-2019
|
1.50
|
Riveting nutplates and stiffiners
|
Details
|
 |
|
01-01-2019
|
9.00
|
Deburing, match drilling, dimpling, and more debur
|
Details
|
|
|
12-31-2018
|
2.50
|
match drill and deburring
|
Details
|
  |
|
12-29-2018
|
2.00
|
Drill small angles for platenuts and front seat hi
|
Details
|
  |
|
12-28-2018
|
4.00
|
Inventory parts bags
|
Details
|
  |
|
12-27-2018
|
4.00
|
Recieve Finishing Kit unpacking and inventory part
|
Details
|
|
|
12-25-2018
|
5.00
|
Match drilling floor assembly
|
Details
|
|
|
12-24-2018
|
2.00
|
Deburring and clecoing the floor assembly
|
Details
|
 |
|
12-22-2018
|
6.00
|
Continued work on interiors
|
Details
|
|
|
12-20-2018
|
2.00
|
Riveted cooling ramp
|
|
|
|
12-18-2018
|
2.00
|
seal up cooling ramp
|
Details
|
 |
|
12-15-2018
|
10.50
|
Rear seat back and interior finish
|
Details
|
|
|
12-14-2018
|
1.50
|
Bolt the right side skins to Gear Leg weldament
|
Details
|
  |
|
12-01-2018
|
3.00
|
Vinyl wrapped the front seat assembly
|
Details
|
|
|
12-01-2018
|
1.50
|
install the screws/bolts on the left side
|
Details
|
  |
|
12-01-2018
|
4.00
|
Front seat assembly
|
Details
|
 |
|
11-30-2018
|
1.50
|
Removing gear legs
|
Details
|
  |
|
11-24-2018
|
4.50
|
Riveting the side skins to lower longerons/gear bo
|
Details
|
  |
|
11-24-2018
|
1.50
|
front seat assembly
|
Details
|
  |
|
11-21-2018
|
2.00
|
More riveting for the bottom skins attachement to
|
Details
|
  |
|
11-19-2018
|
2.50
|
Rivet bottom forward skins to gear leg rib and sid
|
Details
|
  |
|
11-17-2018
|
1.50
|
Rivet the two forward bottom skins to floor assemb
|
Details
|
  |
|
11-16-2018
|
2.50
|
Tank seal applied to foreward skins
|
Details
|
|
|
11-15-2018
|
1.50
|
Riveting bottom skins to fuselage
|
Details
|
  |
|
11-12-2018
|
8.00
|
Match drill, Debur, and dimple bottom forward skin
|
Details
|
 |
|
11-10-2018
|
2.50
|
Assembly of bottom skins
|
Details
|
  |
|
11-08-2018
|
3.00
|
Drilling and bolting the left gear leg
|
Details
|
|
|
11-07-2018
|
3.25
|
Drilling, deburing, and bolting right gear leg
|
Details
|
|
|
11-06-2018
|
2.00
|
Measuring again and again, still not cutting/drill
|
Details
|
|
|
11-05-2018
|
2.25
|
Measure and move. Finally drilling outer wear pla
|
Details
|
 |
|
11-02-2018
|
2.00
|
Attaching main gear legs
|
Details
|
|
|
10-30-2018
|
1.50
|
Drill main 7/16" holes in bracket and friction pla
|
Details
|
  |
|
10-26-2018
|
2.50
|
Rivet and bolt the seatback plate to the siderails
|
Details
|
 |
|
10-25-2018
|
1.75
|
Rivet seat back plate
|
Details
|
  |
|
10-24-2018
|
2.00
|
Rivet siderails to the fuselage assembly
|
Details
|
|
|
10-23-2018
|
1.50
|
Rivet armrest and bulkhead assembly
|
Details
|
  |
|
10-22-2018
|
1.50
|
Final dril and bolt rear seat belt mounts
|
Details
|
  |
|
10-20-2018
|
1.50
|
Wrap vinyl on front bagage area
|
Details
|
  |
|
10-17-2018
|
1.50
|
|
Details
|
  |
|
10-06-2018
|
6.00
|
More vinyl wrapping for interior finish
|
Details
|
|
|
10-02-2018
|
1.75
|
Laying vinyl for interior
|
Details
|
 |
|
09-30-2018
|
3.50
|
laying vinyl for some of the finish
|
Details
|
 |
|
09-29-2018
|
7.00
|
Finished up riveting the middle bottom skins and r
|
Details
|
|
|
09-24-2018
|
3.50
|
set and rivet bottom middle skin
|
Details
|
|
|
09-22-2018
|
10.00
|
Finished riveting both left and right side skins.
|
Details
|
|
|
09-20-2018
|
1.75
|
Vinyl wrap some pieces
|
Details
|
  |
|
09-20-2018
|
1.50
|
Rivet pieces of the right rear skin
|
Details
|
  |
|
09-19-2018
|
1.50
|
Riveting left rear side skin to lower longeron
|
Details
|
  |
|
09-18-2018
|
2.00
|
Riveting rear side skins
|
Details
|
  |
|
09-17-2018
|
1.50
|
Wrapped the right gear box to match efforts on the
|
|
 |
|
09-16-2018
|
2.00
|
Vinyl wrap for left gear column
|
Details
|
|
|
09-15-2018
|
7.00
|
finished up the riveting on the mid skins
|
Details
|
|
|
09-13-2018
|
2.00
|
Spend an hour riveting mid skins
|
Details
|
|
|
09-07-2018
|
1.50
|
riveting mid sikin
|
Details
|
  |
|
09-05-2018
|
1.50
|
Rivet left mid skin
|
Details
|
  |
|
09-04-2018
|
1.50
|
Riveting the left mid skin
|
Details
|
 |
|
08-25-2018
|
5.00
|
Rivet the forward skins
|
Details
|
|
|
08-24-2018
|
2.00
|
Rivet forward skins
|
Details
|
|
|
08-23-2018
|
2.25
|
Cleco parts together
|
Details
|
|
|
08-22-2018
|
3.75
|
Rear bulkhead assembly
|
Details
|
|
|
08-21-2018
|
3.50
|
Side Skin riveting and assembly
|
Details
|
|
|
08-20-2018
|
3.25
|
Rivet rear bagage ribs and bulkhead
|
Details
|
|
|
08-15-2018
|
1.25
|
Tank sealer to forward side skins
|
Details
|
|
|
08-11-2018
|
7.50
|
Assembly and rivet sections and route fuel and ven
|
Details
|
|
|
08-11-2018
|
2.50
|
Access panels in gear box
|
Details
|
|
|
08-09-2018
|
2.50
|
Access panels in gear box
|
Details
|
|
|
08-08-2018
|
2.00
|
Back riveting mid side skins and start reassembly
|
Details
|
|
|
08-07-2018
|
2.00
|
Rivet the Mid structure arm rest and bulkheads tog
|
Details
|
  |
|
08-06-2018
|
2.50
|
Attachement of the forward and mid floor
|
Details
|
|
|
08-04-2018
|
6.00
|
Begin the reassembly of the fuselage parts
|
Details
|
|
|
08-03-2018
|
3.50
|
Deburing, dimpling, and priming
|
Details
|
  |
|
08-02-2018
|
2.75
|
Deburing and dimpling
|
Details
|
  |
|
08-01-2018
|
1.00
|
Deburing and dimpling bulkhead and pieces in fusel
|
|
  |
|
07-30-2018
|
2.00
|
Deburing and dimpling fuselage pieces
|
Details
|
 |
|
07-21-2018
|
5.50
|
More deburing, dimpling
|
Details
|
|
|
07-18-2018
|
1.50
|
Debur and dimple the Left forward skin
|
Details
|
 |
|
07-17-2018
|
2.50
|
Deburing and dimple mid skins
|
Details
|
  |
|
07-16-2018
|
1.50
|
Debur, dimple, left side tail skin
|
Details
|
  |
|
07-14-2018
|
8.50
|
Deburing, painting, and dimpling
|
Details
|
|
|
07-13-2018
|
2.00
|
Countersinking
|
Details
|
  |
|
07-10-2018
|
2.00
|
Countersink dimple and deburing
|
Details
|
  |
|
07-07-2018
|
9.00
|
Match drilling, disassembly, and deburing
|
Details
|
|
|
07-05-2018
|
1.00
|
Cut shape out of tail skin for tailwheel assembly
|
Details
|
 |
|
07-04-2018
|
6.00
|
Braces for rear seat roll bar and tail wheel
|
Details
|
|
|
06-27-2018
|
2.00
|
Drilling and clecoing
|
Details
|
|
|
06-26-2018
|
3.25
|
Match drilling and clecoing
|
Details
|
|
|
06-23-2018
|
5.50
|
Match drill mid skins and bottom skins. Drill upp
|
Details
|
|
|
06-21-2018
|
2.50
|
Match drill front skins, Drill holes for top longe
|
Details
|
  |
|
06-20-2018
|
2.00
|
Drilling the forward uper Longerons and forward sk
|
Details
|
|
|
06-18-2018
|
2.00
|
Align and match drill the lower and mid longerons
|
|
  |
|
06-16-2018
|
6.25
|
Upper longerons, Rails, and box covers
|
Details
|
|
|
06-15-2018
|
2.50
|
Bottom skin
|
Details
|
|
|
05-31-2018
|
1.00
|
Cleco tail assembly together with bulkheads and si
|
Details
|
|
|
05-28-2018
|
5.00
|
Deburing skins and lower/mid longeron
|
Details
|
|
|
05-26-2018
|
8.50
|
construction of the rear bulkheads for the tail as
|
Details
|
|
|
05-24-2018
|
2.50
|
Rear bulkhead assembly
|
Details
|
|
|
05-23-2018
|
1.50
|
Tail bulkhead assembly
|
Details
|
  |
|
05-22-2018
|
2.50
|
Tail bulkhead assembly
|
Details
|
|
|
05-21-2018
|
3.00
|
Cleco structure and skin
|
Details
|
  |
|
05-19-2018
|
1.50
|
Disassemble and re-clecoe the left and right mid s
|
Details
|
  |
|
05-16-2018
|
2.00
|
Match drill and cleco left forward skin
|
Details
|
 |
|
05-12-2018
|
1.50
|
Clecoe arm rest structure
|
Details
|
|
|
05-09-2018
|
2.00
|
Cut vent lines and clecoed the floor assembly toge
|
Details
|
|
|
05-08-2018
|
2.00
|
forming the mid skins
|
Details
|
|
|
05-07-2018
|
1.75
|
Deburing parts, countersinking nutplates, and rive
|
Details
|
|
|
05-05-2018
|
4.50
|
Deburing arm rest
|
Details
|
 |
|
05-03-2018
|
1.50
|
Longeron and gussett fitting
|
Details
|
  |
|
05-02-2018
|
1.50
|
Lower right longeron assembly
|
Details
|
  |
|
04-30-2018
|
2.00
|
Lower left longeron
|
Details
|
  |
|
04-28-2018
|
3.50
|
Fitting lower left longeron
|
Details
|
  |
|
04-26-2018
|
2.00
|
Gussets for mid and lower longerons
|
Details
|
|
|
04-25-2018
|
2.00
|
Bending gear box and bulkhead gusset / web enclosu
|
Details
|
|
|
04-23-2018
|
3.00
|
Forming up the left and right upper longerons
|
Details
|
  |
|
04-21-2018
|
6.50
|
Seat/floor assembly and longerons
|
Details
|
|
|
04-19-2018
|
2.00
|
Rivet inbound forward and aft ribs
|
Details
|
|
|
04-18-2018
|
1.50
|
Rivet seat bulkhead
|
Details
|
  |
|
04-14-2018
|
4.00
|
Deburing and assembly of floor ribs
|
Details
|
  |
|
04-12-2018
|
1.50
|
deburing
|
Details
|
  |
|
04-11-2018
|
2.50
|
Uncleco parts parts and start deburing holes and e
|
Details
|
  |
|
04-10-2018
|
2.00
|
clecoed the floor assembly and match drilled botto
|
Details
|
|
|
04-07-2018
|
7.00
|
Floor assembly and Aileron trim brackets
|
Details
|
|
|
04-06-2018
|
1.00
|
Fabricate 805 support tabs
|
|
 |
|
03-31-2018
|
9.50
|
Finish up the bulkhead assembly and start the rear
|
Details
|
|
|
03-29-2018
|
2.50
|
Bulkhead assembly
|
Details
|
|
|
03-26-2018
|
2.50
|
Riveting bulkhead assembly
|
Details
|
|
|
03-24-2018
|
9.00
|
Began the center substructure / bulkhead assembly
|
Details
|
|
|
03-23-2018
|
2.00
|
finishing up the baggage assembly
|
Details
|
|
|
03-21-2018
|
2.00
|
Forward bagage assembly
|
Details
|
  |
|
03-19-2018
|
2.00
|
Debur and flute bagage area assembly
|
Details
|
|
|
03-17-2018
|
7.50
|
Riveted the box assemblies to the floor assembly
|
Details
|
|
|
03-17-2018
|
4.00
|
Finishing up the gear box assemblies
|
Details
|
 |
|
03-15-2018
|
2.00
|
Rivet the left gear box assembly
|
Details
|
|
|
03-14-2018
|
3.50
|
Riveting and deburing
|
Details
|
|
|
03-12-2018
|
1.50
|
Countersinking and deburing right box assembly
|
Details
|
  |
|
03-10-2018
|
4.00
|
Countersinking, deburing, and riveting of floor as
|
Details
|
|
|
03-10-2018
|
5.25
|
Box gear assembly, clecoing, match drill and debur
|
Details
|
|
|
03-08-2018
|
2.50
|
Dimple / Deburing floor assembly
|
Details
|
 |
|
03-05-2018
|
6.50
|
Forward floor assembly
|
Details
|
|
|
02-28-2018
|
2.00
|
Riveting structure to firewall
|
Details
|
  |
|
02-26-2018
|
3.00
|
Dimple and start riveting structure to firewall
|
Details
|
|
|
02-24-2018
|
8.50
|
Began Firewall assembly
|
Details
|
|
|
01-10-2018
|
2.00
|
Inventory
|
Details
|
  |
|
01-09-2018
|
4.00
|
Unpacking and inventory
|
Details
|
  |
|
01-08-2018
|
3.50
|
Unpacking crate and inventory parts
|
Details
|
|