Date
|
Hours
|
Work Log Summary

|
Details

|
06-03-2021
|
2.00
|
Mounting the wing tips to the wings
|
Details
|
 |
|
02-22-2018
|
1.50
|
Rivet right wing flap hinge into place
|
Details
|
|
|
02-21-2018
|
1.50
|
Epoxy in and rivet Pitot tube mast
|
Details
|
 |
|
02-19-2018
|
7.50
|
Rivet the outbound bottom skin on right wing
|
Details
|
|
|
02-01-2018
|
2.00
|
mistake and drilling out rivets to remove the wrin
|
Details
|
  |
|
01-29-2018
|
2.00
|
Riveting the bottom skin
|
Details
|
|
|
01-27-2018
|
5.00
|
Rivetted the bottom inbound skin to the right wing
|
Details
|
 |
|
01-24-2018
|
1.50
|
drill holes for set screws
|
Details
|
 |
|
01-22-2018
|
2.00
|
marked and cut wing skin for pitot tube mast
|
Details
|
  |
|
01-03-2018
|
1.00
|
Mounted the Garmin 28 servo bracket as part of th
|
Details
|
|
|
01-03-2018
|
1.50
|
Aileron assembly for the right wing
|
Details
|
|
|
12-28-2017
|
1.75
|
Riveting bottom skin for left wing
|
Details
|
  |
|
12-25-2017
|
7.50
|
Riveting the bottom skin
|
Details
|
|
|
12-23-2017
|
1.50
|
Removed the push rods andcut out some of the ar
|
Details
|
|
|
12-23-2017
|
1.00
|
Mount the Flap hinge for left wing
|
Details
|
  |
|
12-21-2017
|
1.75
|
Aieron linkage
|
Details
|
  |
|
12-20-2017
|
2.00
|
Assembly of the bell crank and push rods for the l
|
Details
|
|
|
12-19-2017
|
2.00
|
Assembly of pushrods
|
Details
|
|
|
12-16-2017
|
7.50
|
Final assembly of the right flap
|
Details
|
|
|
12-14-2017
|
1.50
|
Riveted the 706 plat to spar and doubler to the ri
|
Details
|
  |
|
12-13-2017
|
1.50
|
Debur and dimple flap skin, ribs, and spar
|
|
  |
|
12-09-2017
|
1.50
|
Riveted the top forward skin to spar connection on
|
Details
|
  |
|
12-02-2017
|
9.00
|
Assembly and riveting
|
Details
|
|
|
11-30-2017
|
2.00
|
Dimple skins, ribs and top spar. Counter sink bott
|
Details
|
  |
|
11-29-2017
|
1.75
|
Debur skins, spar, and ribs
|
Details
|
  |
|
11-28-2017
|
2.50
|
Deburing
|
Details
|
  |
|
11-27-2017
|
1.50
|
Flap assembly, match drill and fabrication of 706
|
Details
|
|
|
11-26-2017
|
1.00
|
Clecoing on the top skin for both flaps
|
Details
|
 |
|
11-25-2017
|
4.00
|
Began the assembly of the flaps
|
Details
|
|
|
11-25-2017
|
3.00
|
Assembly of the aileron
|
Details
|
 |
|
11-20-2017
|
2.00
|
Left aileron assembly
|
Details
|
  |
|
11-18-2017
|
6.50
|
Completion of the right aileron
|
Details
|
|
|
11-16-2017
|
2.00
|
Right Aileron assembly
|
Details
|
  |
|
11-15-2017
|
1.50
|
Assembly of aileron skins to spar
|
Details
|
  |
|
11-14-2017
|
1.50
|
Aileron assembly
|
Details
|
 |
|
11-13-2017
|
1.50
|
assembly of Right Aileron
|
Details
|
  |
|
11-04-2017
|
2.00
|
Cleco the left aileron assembly
|
Details
|
|
|
11-02-2017
|
1.00
|
Reinforement plate for spar/hardware
|
|
  |
|
10-29-2017
|
2.00
|
reinforcing plates for ailerons
|
Details
|
  |
|
10-28-2017
|
6.50
|
Riveting the stiffeners to the aileron skin
|
Details
|
|
|
10-25-2017
|
1.50
|
Match drill stiffenfers to aileron skins
|
|
  |
|
10-24-2017
|
2.00
|
grind and debur aileron stiffeners
|
Details
|
|
|
10-23-2017
|
1.50
|
Cut out aileron stiffners
|
|
  |
|
10-03-2017
|
1.50
|
Bottom wing skin access panel
|
Details
|
  |
|
09-21-2017
|
2.50
|
Access panels for right wing
|
Details
|
 |
|
09-16-2017
|
4.50
|
Aleron and flap fairings
|
Details
|
 |
|
09-09-2017
|
5.00
|
Aleron and flap fairings on right wing
|
Details
|
|
|
07-12-2017
|
1.50
|
Aleron and flap fairings
|
Details
|
|
|
07-11-2017
|
1.50
|
Torque fuel tank bolts and cleco on flap/aleron br
|
Details
|
  |
|
07-03-2017
|
3.50
|
build wing cradle and move wings from the stands t
|
Details
|
|
|
06-29-2017
|
2.00
|
Riveting together Aileron and Flap brackets
|
Details
|
  |
|
06-27-2017
|
2.00
|
Flap and aileron brackets
|
Details
|
|
|
06-26-2017
|
3.00
|
Finished riveting the left wing top skin
|
Details
|
  |
|
06-17-2017
|
7.00
|
Riveted a good portion of the left wing
|
Details
|
 |
|
06-14-2017
|
3.00
|
Team riveting
|
Details
|
|
|
06-08-2017
|
2.50
|
Riveting top skin for right wing
|
Details
|
  |
|
06-06-2017
|
3.00
|
Riveting top skin to right wing
|
Details
|
  |
|
06-05-2017
|
2.00
|
Riveting top wing skin to ribs
|
Details
|
|
|
05-30-2017
|
2.00
|
back rivet main wing skins together
|
Details
|
  |
|
05-10-2017
|
2.25
|
Leading edge assembly and tanks
|
Details
|
|
|
05-09-2017
|
2.25
|
Rivet right leading edge to main spar
|
Details
|
  |
|
05-06-2017
|
6.00
|
Riveting leading edge and attaching to main spar
|
Details
|
  |
|
05-05-2017
|
2.00
|
Rivet leading edge, route stall warning wiring
|
Details
|
|
|
05-04-2017
|
1.50
|
Riveting the left leading edge and Stall warning d
|
Details
|
  |
|
05-03-2017
|
1.50
|
Flared the pitot lines for fittings, Started rivet
|
Details
|
|
|
05-02-2017
|
2.50
|
Conduit line, pilot line assembly
|
Details
|
|
|
05-01-2017
|
2.00
|
Debur, dimple, and cleco top skin for right wing
|
Details
|
  |
|
04-26-2017
|
2.00
|
Right leading edge prepartion
|
Details
|
  |
|
04-25-2017
|
2.00
|
Deburing, dimpling of right leading edge skin
|
|
  |
|
04-24-2017
|
2.00
|
Right leading edge
|
Details
|
 |
|
04-23-2017
|
0.75
|
clecoed the painted ribs on the left leading edge
|
|
  |
|
04-22-2017
|
5.00
|
work on the leading edge of the left wing
|
Details
|
  |
|
04-17-2017
|
5.00
|
Re-tested Left tank and sealed up Right tanks
|
Details
|
  |
|
04-14-2017
|
1.50
|
Repair leak in Left tank from failed tank test
|
Details
|
|
|
04-11-2017
|
2.00
|
Seal access panels for both fuel tanks
|
|
 |
|
04-08-2017
|
8.50
|
Preparation of Left baffle. Seal fuel sending dev
|
Details
|
|
|
04-02-2017
|
1.50
|
Right Baffle preparation Debur, and D/A finish for
|
Details
|
|
|
03-20-2017
|
2.00
|
Seal and rivet in outbound rib for right tank
|
|
|
|
03-18-2017
|
2.00
|
Rivet in the outbound rib on the left tank
|
|
  |
|
03-17-2017
|
2.00
|
Seal flop tubes and breather lilne
|
Details
|
|
|
03-16-2017
|
2.50
|
Seal and rivet inbound ribs into both tanks. Seal
|
|
  |
|
03-15-2017
|
2.00
|
Seal and rivet in 2nd rib on left tank
|
Details
|
  |
|
03-14-2017
|
2.00
|
Seal and rivet doubler rings for fuel sending unit
|
Details
|
|
|
03-13-2017
|
1.50
|
Fuel sending units, doubler plates
|
Details
|
 |
|
03-04-2017
|
1.50
|
Modification for anti-obstruction bracket
|
Details
|
|
|
03-03-2017
|
2.00
|
Tank assembly
|
Details
|
  |
|
03-02-2017
|
2.50
|
Seal and rivet in two more ribs on left tank
|
|
  |
|
02-27-2017
|
2.50
|
sealed and riveted two ribs into left tank
|
|
|
|
02-25-2017
|
8.50
|
Riveted in the interior ribs for the left tank, in
|
Details
|
|
|
02-24-2017
|
2.00
|
D/A (scuff up) rib edges for sealant. Safety wir
|
Details
|
 |
|
02-20-2017
|
6.50
|
Preparation D/A surfaces and MEK wash for final cl
|
Details
|
|
|
02-20-2017
|
0.00
|
Photos of sealant
|
Details
|
|
|
02-20-2017
|
0.00
|
Photos of sealant
|
|
|
|
02-18-2017
|
8.00
|
Fuel tank assembly. Fuel caps, drains, and vent l
|
Details
|
|
|
02-17-2017
|
1.50
|
Rivet nutplate to access panel
|
Details
|
|
|
02-16-2017
|
1.50
|
Access panel and doubler ring deburing / dimpling
|
Details
|
  |
|
02-15-2017
|
1.50
|
Drill the oposite rib access panel and match drill
|
Details
|
 |
|
02-14-2017
|
0.50
|
Drilled the access hole in the rib with a Fly-cutt
|
Details
|
 |
|
02-13-2017
|
2.00
|
Dimpling ribs and wing skins
|
Details
|
  |
|
02-11-2017
|
4.00
|
deburing and hinged door for invertied fuel system
|
Details
|
|
|
02-10-2017
|
1.00
|
Building the fuel sending devise linkage
|
Details
|
 |
|
02-08-2017
|
1.00
|
Drill rivet placments for attachement angles and b
|
|
  |
|
02-06-2017
|
1.50
|
Fabricate the two attachement angles
|
Details
|
|
|
02-01-2017
|
3.00
|
Counterskining and deburing fuel tanks/wing skins
|
|
  |
|
01-31-2017
|
1.00
|
Countersinking wing skins for fuel tank
|
|
  |
|
01-24-2017
|
2.00
|
Countersink tank skin
|
Details
|
  |
|
01-11-2017
|
3.00
|
Counter sinking fuel tank skin and main spar point
|
Details
|
  |
|
12-28-2016
|
1.25
|
countersink bottom side of right fuel tank
|
|
 |
|
12-27-2016
|
1.50
|
Dimple ribs on Left top wing section. Countersink
|
|
  |
|
12-26-2016
|
4.50
|
Deburing and dimpling wing skins
|
|
  |
|
12-24-2016
|
7.00
|
Skin preparation and Right fuel tank assembly
|
Details
|
|
|
12-20-2016
|
1.00
|
Match drill rib sections with left tank skin
|
|
  |
|
12-19-2016
|
1.00
|
Cleco tank ribs to tank skin
|
Details
|
 |
|
12-17-2016
|
6.00
|
Assembly of fuel tanks
|
Details
|
|
|
12-16-2016
|
3.00
|
Debur and dimple wing skins
|
Details
|
  |
|
12-15-2016
|
1.00
|
Deburing wing skins
|
|
  |
|
12-10-2016
|
2.50
|
Baffle construction
|
Details
|
  |
|
12-05-2016
|
2.50
|
Brackets for gas tanks
|
Details
|
  |
|
12-03-2016
|
7.00
|
Bracket construction
|
Details
|
|
|
11-19-2016
|
2.00
|
Bottom wing skin deburing
|
Details
|
  |
|
11-14-2016
|
2.00
|
Debur and dimple the bottom skin
|
Details
|
|
|
11-13-2016
|
1.00
|
debured the left bottom wing skin
|
|
  |
|
11-12-2016
|
3.00
|
Cleco and match drill ribs to main spar assembly
|
Details
|
  |
|
11-11-2016
|
3.00
|
remove bottom wings skins and trim off vinyl prote
|
Details
|
  |
|
11-05-2016
|
2.00
|
Assembly of right wing leading edge
|
Details
|
  |
|
10-29-2016
|
4.50
|
Leading edge assembly for left wing
|
Details
|
|
|
10-27-2016
|
2.00
|
Cleco on the bottom skin for both right and left w
|
Details
|
  |
|
10-26-2016
|
1.00
|
Match drill top skin for left wing
|
|
  |
|
10-24-2016
|
2.00
|
Electrical pumbing
|
Details
|
  |
|
10-22-2016
|
1.00
|
drill top skin matching holes
|
Details
|
  |
|
10-18-2016
|
1.00
|
Rivet Leading edge access door and nutplates
|
Details
|
|
|
10-17-2016
|
1.50
|
Access door for leading edge, left wing
|
Details
|
  |
|
10-15-2016
|
8.00
|
Main spar, Rib and skins
|
Details
|
|
|
10-12-2016
|
2.00
|
Drill holes for flex conduit
|
Details
|
  |
|
10-11-2016
|
2.00
|
Rivet ribs to rear spar assembly
|
Details
|
  |
|
09-19-2016
|
1.50
|
riveting left wing ribs to main spar
|
|
|
|
09-17-2016
|
2.00
|
Rivet and re-rivet ribs to spar
|
Details
|
|
|
09-10-2016
|
2.25
|
Rivet connections for right ribs to main spar
|
|
  |
|
09-09-2016
|
1.50
|
Rivet connections for right ribs to main spar
|
|
  |
|
08-20-2016
|
6.00
|
Main and rear spar assembly
|
Details
|
|
|
08-18-2016
|
2.00
|
Rear spar assembly rework
|
Details
|
  |
|
08-10-2016
|
2.00
|
fluting leading edge ribs
|
Details
|
 |
|
08-09-2016
|
1.50
|
Clecoed ribs back to main spar
|
Details
|
 |
|
07-28-2016
|
3.00
|
Prep ribs for main spar assembly
|
Details
|
  |
|
07-27-2016
|
2.50
|
Prep on wing ribs
|
Details
|
  |
|
07-26-2016
|
3.50
|
DA/Scuff left wing spars and primer
|
Details
|
  |
|
07-23-2016
|
3.00
|
Debur edges on wing spars
|
Details
|
  |
|
07-16-2016
|
2.50
|
Flute wing spars
|
Details
|
  |
|
06-25-2016
|
5.00
|
work on the rear wing spars for assembly
|
Details
|
  |
|
06-23-2016
|
1.50
|
Bolt on the tie down assemblies
|
Details
|
|
|
06-22-2016
|
2.00
|
Drill platenuts on tie down assembly
|
Details
|
  |
|
06-21-2016
|
1.50
|
Drill and cut spacers
|
Details
|
  |
|
06-11-2016
|
6.00
|
Rivet nut plates, prime counter sinking, and tie d
|
Details
|
|
|
06-02-2016
|
1.00
|
Rivet nutplates to main spar
|
Details
|
  |
|
05-30-2016
|
3.00
|
Countersink main spars for nutplate
|
Details
|
  |
|
05-28-2016
|
3.50
|
Nutplates
|
Details
|
|
|
05-26-2016
|
1.50
|
review plans, lable main spars, and adjust counter
|
Details
|
  |
|
05-25-2016
|
2.00
|
Mounted the right main wing spar to the wing stand
|
Details
|
  |
|
04-14-2016
|
2.00
|
unpacking and inventorying
|
|
  |
|
04-12-2016
|
2.00
|
unpacking and inventory
|
|
  |
|
04-09-2016
|
3.00
|
unpackaging and inventorying parts
|
|
  |
|
04-07-2016
|
2.00
|
Received Wing kit
|
Details
|
|