KitLog pro

Powered By Kitlog Pro v2.0

Davids Web Site
Work Logs Found: 10
Category Work Time: 52 Hours
 Date
Hours
Work Log Summary

Details

 08-21-2007
0.50
Taxie test
     

 08-21-2007
2.00
1 hour engine break-in
       

 08-09-2007
4.00
Reinstalling Engine
       

 07-30-2006
5.50
Removed completed engine
Details
     

 07-24-2006
9.00
Carb and choke and oil pump cables attached to e
       

 07-10-2006
10.00
Ran cables for throttle and choke.
       

 06-13-2006
8.00
Wired electrical from engine to fire wall.
Details
     

 06-08-2006
9.00
Installed oil tank to fit under cover
Details
       

 04-15-2006
3.00
Installed oil pump and starter
       

 11-06-2005
1.00
Unpacked engine
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.