Powered By Kitlog Pro v2.0
Davids Web Site
C2Standard
Engine
Work Logs Found:
10
Category Work Time:
52 Hours
Date
Hours
Work Log Summary
Details
08-21-2007
0.50
Taxie test
08-21-2007
2.00
1 hour engine break-in
08-09-2007
4.00
Reinstalling Engine
07-30-2006
5.50
Removed completed engine
Details
07-24-2006
9.00
Carb and choke and oil pump cables attached to e
07-10-2006
10.00
Ran cables for throttle and choke.
06-13-2006
8.00
Wired electrical from engine to fire wall.
Details
06-08-2006
9.00
Installed oil tank to fit under cover
Details
04-15-2006
3.00
Installed oil pump and starter
11-06-2005
1.00
Unpacked engine
Details
SITE NAVIGATION
Contact Builder
C2Standard Home
Category
# Logs
# Hours
All
99
407
Avionics
4
16
Electrical
6
26
Empennage
15
54
Engine
10
52
Fuselage
20
86
Miscellaneous
10
38
None
2
3
Wings
32
132
Copyright © 2001-2024 Matronics. All Rights Reserved.