Powered By Kitlog Pro v2.0
TERRY'S WEB SITE
RV 10
Final Assembly
Work Logs Found:
37
Category Work Time:
228 Hours
Date
Hours
Work Log Summary
Details
05-16-2016
8.00
AERO LED Rework wiring
Details
05-11-2016
3.00
Lower Fairings
Details
05-06-2016
8.00
Second Test Flight Adjust
Details
05-05-2016
8.00
Air Dam Trim
Details
05-03-2016
2.00
First Flight
Details
05-01-2016
3.00
Cargo Tie Down
Details
04-27-2016
4.00
Bose
Details
04-26-2016
2.00
Mini X
Details
04-26-2016
8.00
ADAHRS Work
Details
04-23-2016
8.00
Post DAR Review
Details
04-22-2016
8.00
Misc cover install
Details
04-21-2016
8.00
Post DAR Review
Details
04-20-2016
4.00
DAR Review
Details
04-19-2016
3.00
IFR Certification
Details
04-15-2016
10.00
Transition Training
Details
04-06-2016
6.00
Data Plate
Details
04-04-2016
5.00
Test
Details
03-31-2016
9.00
Hanger Final Inspection
Details
03-30-2016
0.50
Reiff Wattage
Details
03-30-2016
8.00
Plugs pulled
Details
03-29-2016
8.00
Fuel Calibrate
Details
03-28-2016
7.00
Fuel Calibrate
Details
03-24-2016
6.00
Fuel Test 3 - Plane at 11.5 degree climb
Details
03-24-2016
6.00
Fuel Test 2 - Plane level
Details
03-24-2016
4.00
Fuel Test 1 - Usuable Fuel - Gravity
Details
03-22-2016
8.00
Weighing the plane
Details
03-21-2016
4.00
Prop Install
Details
03-21-2016
2.00
N Number and misc prep for weight
Details
03-20-2016
4.00
Lower fairings
Details
03-19-2016
8.00
Plastic removed, prop ready
Details
03-18-2016
8.00
Tail electrical and sun tail
Details
03-17-2016
8.00
Vertical Stabilizer/Rudder install
Details
03-16-2016
8.00
Elevator adjust
Details
03-15-2016
8.00
H. Stabilizer and elevator install
Details
03-14-2016
5.00
Aileron Adjustment
Details
03-13-2016
8.00
Flap install
Details
03-12-2016
10.00
Wing Attach
Details
SITE NAVIGATION
Contact Builder
RV 10 Home
Category
# Logs
# Hours
All
643
3955
Avionics
73
463
Empennage
22
130
Engine
64
380
Final Assembly
37
228
Fuselage
344
2131
Milestones
6
11
Miscellaneous
4
12
None
6
11
Prop
8
46
Tools
1
1
Wings
78
542
Copyright © 2001-2024 Matronics. All Rights Reserved.