KitLog pro

Powered By Kitlog Pro v2.0

Christopher's Web Site
Work Logs Found: 55
Category Work Time: 178 Hours
 Date
Hours
Work Log Summary

Details

 05-06-2017
5.00
Intake Manifold Issues
Details
       

 03-25-2017
6.50
Fuel Flow Test
Details
 

 02-26-2017
4.00
Reinstall Drive Shaft
Details
       

 02-19-2017
1.50
Install Transmission Breather Hose
Details
       

 02-18-2017
2.50
Install Transmission fitting and Hose
Details
       

 02-18-2017
2.50
Drain and Change Trans Fluid
Details
       

 02-18-2017
1.50
Change Oil and Filter
Details
       

 02-11-2017
2.50
Remove TR Driveshaft
Details
       

 02-06-2017
0.75
Transmission Breather
Details

 02-06-2017
4.00
First Start-Up!!!!!!!!!
Details
       

 02-05-2017
2.00
Fuel Tanks and Tank Braces Installation
Details
       

 02-04-2017
3.00
Driveshaft Installation (Continued)
Details
       

 02-03-2017
8.00
Flu and Infection / Transmission Installation
Details
       

 02-03-2017
4.00
Driveshaft Installation
Details
       

 12-19-2016
2.00
Manifold Pressure Lines and Connections
Details
       

 12-17-2016
2.50
Fuel Tank Plumbing
Details
       

 12-06-2016
1.50
Fuel Tank Strap Configuration and Installation
Details
       

 12-02-2016
1.50
Fuel Supply Elbow Connection and Tank Sumps
Details
       

 12-01-2016
2.00
Fuel Tank Fill Collar and Cap
Details
       

 07-02-2016
8.00
Happy Anniversary!!
Details
       

 07-01-2016
2.50
Remaining Duct Work
Details
       

 06-30-2016
2.50
Throttle Linkage
Details
       

 06-26-2016
5.00
Valve Cover and Shroud Installation Preparation
Details
       

 06-25-2016
12.00
Valve Cover Polishing
Details
       

 06-19-2016
2.00
E-Mag Installation
Details
       

 06-18-2016
2.00
Spark Plug Wire Installation and Routing
Details
       

 06-12-2016
4.00
Carburetor Installation, Fuel Lines, CHT Probes
Details
       

 06-04-2016
2.50
Carb Heat Connection
Details
       

 06-01-2016
2.50
Carburetor Intake Fitting
Details
       

 05-29-2016
3.50
Manifold Connection, Spark Plugs, Exhaust Installa
Details
       

 05-28-2016
4.00
Intake Pipes, Oil Breather, Fuel Filter, Fuel/Oil
Details
       

 05-24-2016
2.00
Sump connection, Cooler Hood Fasteners, Side Shro
Details
       

 05-22-2016
3.00
Mount Carb Heat Box, Install Oil Sump, Connect Shr
Details
       

 05-21-2016
3.00
Oil Cooler and Cooler Hood
Details
       

 05-16-2016
3.00
More Engine Shroud and Oil Cooler Dry fit
Details
       

 05-15-2016
2.50
Engine Shroud Install
Details
       

 05-14-2016
1.50
Powder Coating
Details
       

 05-10-2016
2.00
Safety Wire Tying
Details
       

 05-08-2016
2.00
Engine Transfer
Details
       

 05-07-2016
2.00
Engine Hoist & Bottom Shroud Penetrations
Details
       

 04-30-2016
2.00
Counter Weight, Carb Heat Box, Air Intake Screen
Details
       

 04-20-2016
2.00
Oil Cooler Hood Complete
Details
       

 04-17-2016
6.00
Oil Cooler Hood
Details
       

 04-10-2016
3.50
Carb Heat Box Complete
Details
       

 04-09-2016
6.00
Carb Heat Box
Details
       

 04-03-2016
2.00
Parts delays
Details
       

 04-02-2016
2.00
Polishing
Details
       

 03-27-2016
4.00
Oil Sump Cover
Details
       

 03-22-2016
1.00
Final Dry Fit Assembly of the Engine Shroud
Details
       

 03-21-2016
4.00
More Engine Shroud Nut Plating
Details
       

 03-20-2016
8.00
Back in the World of Nut Plates…Oh Joy!
Details
       

 03-19-2016
1.75
Engine Relocation to the Vertical Stand
Details
       

 03-18-2016
1.50
Engine Shroud Cracks and Miss-drilling
Details
       

 03-17-2016
2.00
Engine Shroud Assemblage
Details
       

 03-16-2016
3.00
Engine Conversion Work
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.