Date
|
Hours
|
Work Log Summary
|
Details
|
05-06-2017
|
5.00
|
Intake Manifold Issues
|
Details
|
|
|
03-25-2017
|
6.50
|
Fuel Flow Test
|
Details
|
|
|
02-26-2017
|
4.00
|
Reinstall Drive Shaft
|
Details
|
|
|
02-19-2017
|
1.50
|
Install Transmission Breather Hose
|
Details
|
|
|
02-18-2017
|
2.50
|
Install Transmission fitting and Hose
|
Details
|
|
|
02-18-2017
|
2.50
|
Drain and Change Trans Fluid
|
Details
|
|
|
02-18-2017
|
1.50
|
Change Oil and Filter
|
Details
|
|
|
02-11-2017
|
2.50
|
Remove TR Driveshaft
|
Details
|
|
|
02-06-2017
|
0.75
|
Transmission Breather
|
Details
|
|
|
02-06-2017
|
4.00
|
First Start-Up!!!!!!!!!
|
Details
|
|
|
02-05-2017
|
2.00
|
Fuel Tanks and Tank Braces Installation
|
Details
|
|
|
02-04-2017
|
3.00
|
Driveshaft Installation (Continued)
|
Details
|
|
|
02-03-2017
|
8.00
|
Flu and Infection / Transmission Installation
|
Details
|
|
|
02-03-2017
|
4.00
|
Driveshaft Installation
|
Details
|
|
|
12-19-2016
|
2.00
|
Manifold Pressure Lines and Connections
|
Details
|
|
|
12-17-2016
|
2.50
|
Fuel Tank Plumbing
|
Details
|
|
|
12-06-2016
|
1.50
|
Fuel Tank Strap Configuration and Installation
|
Details
|
|
|
12-02-2016
|
1.50
|
Fuel Supply Elbow Connection and Tank Sumps
|
Details
|
|
|
12-01-2016
|
2.00
|
Fuel Tank Fill Collar and Cap
|
Details
|
|
|
07-02-2016
|
8.00
|
Happy Anniversary!!
|
Details
|
|
|
07-01-2016
|
2.50
|
Remaining Duct Work
|
Details
|
|
|
06-30-2016
|
2.50
|
Throttle Linkage
|
Details
|
|
|
06-26-2016
|
5.00
|
Valve Cover and Shroud Installation Preparation
|
Details
|
|
|
06-25-2016
|
12.00
|
Valve Cover Polishing
|
Details
|
|
|
06-19-2016
|
2.00
|
E-Mag Installation
|
Details
|
|
|
06-18-2016
|
2.00
|
Spark Plug Wire Installation and Routing
|
Details
|
|
|
06-12-2016
|
4.00
|
Carburetor Installation, Fuel Lines, CHT Probes
|
Details
|
|
|
06-04-2016
|
2.50
|
Carb Heat Connection
|
Details
|
|
|
06-01-2016
|
2.50
|
Carburetor Intake Fitting
|
Details
|
|
|
05-29-2016
|
3.50
|
Manifold Connection, Spark Plugs, Exhaust Installa
|
Details
|
|
|
05-28-2016
|
4.00
|
Intake Pipes, Oil Breather, Fuel Filter, Fuel/Oil
|
Details
|
|
|
05-24-2016
|
2.00
|
Sump connection, Cooler Hood Fasteners, Side Shro
|
Details
|
|
|
05-22-2016
|
3.00
|
Mount Carb Heat Box, Install Oil Sump, Connect Shr
|
Details
|
|
|
05-21-2016
|
3.00
|
Oil Cooler and Cooler Hood
|
Details
|
|
|
05-16-2016
|
3.00
|
More Engine Shroud and Oil Cooler Dry fit
|
Details
|
|
|
05-15-2016
|
2.50
|
Engine Shroud Install
|
Details
|
|
|
05-14-2016
|
1.50
|
Powder Coating
|
Details
|
|
|
05-10-2016
|
2.00
|
Safety Wire Tying
|
Details
|
|
|
05-08-2016
|
2.00
|
Engine Transfer
|
Details
|
|
|
05-07-2016
|
2.00
|
Engine Hoist & Bottom Shroud Penetrations
|
Details
|
|
|
04-30-2016
|
2.00
|
Counter Weight, Carb Heat Box, Air Intake Screen
|
Details
|
|
|
04-20-2016
|
2.00
|
Oil Cooler Hood Complete
|
Details
|
|
|
04-17-2016
|
6.00
|
Oil Cooler Hood
|
Details
|
|
|
04-10-2016
|
3.50
|
Carb Heat Box Complete
|
Details
|
|
|
04-09-2016
|
6.00
|
Carb Heat Box
|
Details
|
|
|
04-03-2016
|
2.00
|
Parts delays
|
Details
|
|
|
04-02-2016
|
2.00
|
Polishing
|
Details
|
|
|
03-27-2016
|
4.00
|
Oil Sump Cover
|
Details
|
|
|
03-22-2016
|
1.00
|
Final Dry Fit Assembly of the Engine Shroud
|
Details
|
|
|
03-21-2016
|
4.00
|
More Engine Shroud Nut Plating
|
Details
|
|
|
03-20-2016
|
8.00
|
Back in the World of Nut Plates…Oh Joy!
|
Details
|
|
|
03-19-2016
|
1.75
|
Engine Relocation to the Vertical Stand
|
Details
|
|
|
03-18-2016
|
1.50
|
Engine Shroud Cracks and Miss-drilling
|
Details
|
|
|
03-17-2016
|
2.00
|
Engine Shroud Assemblage
|
Details
|
|
|
03-16-2016
|
3.00
|
Engine Conversion Work
|
Details
|
|