Powered By Kitlog Pro v2.0
HANSRUDOLF'S WEB SITE
BearHawk
Fuselage Fitout
Work Logs Found:
7
Category Work Time:
55 Hours
Date
Hours
Work Log Summary
Details
01-03-2016
8.00
Seatbelt Installation
Details
12-06-2015
15.00
Cargo Tube and Rear Bulkhead
Details
12-05-2015
4.00
Floor Carpets
Details
12-04-2015
4.00
Interior Wall Panel
Details
12-02-2015
6.00
Interior Wall Panel
Details
11-30-2015
10.00
Interior Wall Panels
Details
11-22-2015
8.00
Interior Wall Panels
Details
SITE NAVIGATION
Contact Builder
BearHawk Home
Category
# Logs
# Hours
All
264
2029
Airframe Practical C
1
1
Aux Fuel Pump
2
20
Avionics
17
277
Brake System
4
46
Cabin Fitout
2
22
Cockpit Roof
2
24
Colour Top Coats
4
120
Control Cables
4
27
Control Surfaces (Ai
1
6
Electrical Wiring
8
79
Empennage
6
35
Engine
2
10
Engine Control Cable
1
3
Engine Stand
1
10
Fairings and Gap Sea
10
31
Flap Control System
1
3
Fuel System
11
46
Fuselage
26
92
Fuselage Air Intake
7
76
Fuselage Cowl
12
94
Fuselage Fitout
7
55
Fuselage Floorboards
4
44
Fuselage Nosebowl
2
23
Fuselage Panels
8
84
Fuselage Rotisserie
1
8
Gear Legs
1
2
Gear Strut
2
8
Heating/Cooling Sys
6
35
Instrument Panel
2
8
IO 360 Sensor Wiring
2
18
IO-360 A1A Engine
11
124
Navigation Lights
3
18
None
1
2
Pneumatic Lines
2
15
Poly-Fibre Covering
11
194
Port Wing
23
60
Seat Belts
3
28
Seats
5
90
Starboard Wing
29
82
Window Framing
1
8
Windshield
4
13
Wing Painting
2
50
Wings
11
32
Wings - Fitout/Paint
1
6
Copyright © 2001-2024 Matronics. All Rights Reserved.