Powered By Kitlog Pro v2.0
Tims Web Site
Panther
Empennage
Work Logs Found:
33
Category Work Time:
142 Hours
Date
Hours
Work Log Summary
Details
08-09-2017
1.50
Trim cable
Details
06-07-2017
4.00
Stabilizer tips
Details
05-31-2017
4.00
Stabilizer tip closers
Details
04-27-2017
2.50
Fin closer
Details
03-31-2017
3.00
Fin closer
Details
10-07-2016
4.50
Horizontal stabilizer
Details
08-23-2016
2.00
elevator down stop, rear torque tube
Details
08-22-2016
6.00
elevator stops.
Details
08-19-2016
3.00
elevators
Details
06-17-2016
6.00
Horizontal and vertical stabilizers.
Details
06-16-2016
1.00
Horizontal stabilizer mounts
Details
06-15-2016
4.00
Horizontal stabilizer mounts
Details
06-14-2016
6.50
Horizontal stabilizer mounts
Details
05-26-2016
2.00
Stabilizer
Details
04-22-2016
3.50
Elevator joiners
Details
04-21-2016
6.00
Horizontal stabilizer.
Details
04-20-2016
4.50
Horizontal stabilizer
Details
03-11-2016
4.00
Fin
Details
03-10-2016
9.50
Fin
Details
03-09-2016
4.50
Fin
Details
03-08-2016
5.50
Rudder
Details
03-07-2016
4.00
Fin
03-01-2016
4.50
Horizontal stabilizer
Details
02-29-2016
2.50
Horizontal stabilizer
Details
02-25-2016
3.50
Horizontal stabilizeer
Details
02-23-2016
5.00
Horizontal stabilizer.
Details
01-28-2016
1.50
Horizontal stabilizer
Details
12-21-2015
7.00
Trim tab
Details
12-17-2015
5.00
Right elevator
Details
12-11-2015
5.50
Rudder
Details
12-10-2015
2.50
Rudder
Details
12-09-2015
6.00
Left elevator
Details
12-08-2015
7.50
Right elevator
Details
SITE NAVIGATION
Contact Builder
Panther Home
Category
# Logs
# Hours
All
406
1434
Avionics
55
188
Canopy
2
4
Cowl
5
11
Electrical
27
80
Empennage
33
142
Engine
40
154
Fuel system
6
13
Fuselage
121
439
Inverted oil system
8
16
Landing gear
7
13
Miscellaneous
16
42
Smoke system
5
12
Wings
81
320
Copyright © 2001-2024 Matronics. All Rights Reserved.