KitLog pro

Powered By Kitlog Pro v2.0

Matt's RV-10 Website
Work Logs Found: 33
Category Work Time: 82 Hours
 Date
Hours
Work Log Summary

Details

 08-20-2016
1.50
Flap Sensor and Adjustment
Details

 08-14-2016
3.00
Tail Wiring
Details

 08-12-2016
2.00
Tail Rigging
Details

 08-09-2016
2.50
Wing Tip Wiring
Details

 08-08-2016
2.00
Wing Subpanel Wiring
Details

 08-07-2016
2.00
Wing Wiring, Air Line Routing
Details
       

 05-12-2016
1.00
Door Wiring
Details

 05-02-2016
3.00
Panel Debugging
Details

 05-01-2016
3.00
Panel Install
Details

 04-30-2016
2.00
Battery Install
Details

 04-25-2016
2.00
Wiring
Details

 04-24-2016
6.00
EMS Wiring
Details
       

 04-23-2016
3.00
Rivet Upper Foward Fuse and Pull Wires
Details
       

 04-22-2016
1.00
Overhead Panel Wiring
Details
       

 04-20-2016
1.50
Elevator Servo Wiring
Details

 04-18-2016
3.00
Control Sticks
Details
       

 04-17-2016
1.50
Cut Front Overhead Panel
Details

 04-16-2016
2.50
Control Stick Wiring
Details

 04-12-2016
1.50
Wiring
Details

 04-11-2016
4.00
ACM Connectioms
Details
       

 04-10-2016
5.00
Varous Wiring Tasks
Details
       

 04-09-2016
2.50
EMS Install
Details
       

 04-04-2016
3.25
Wiring Tasks, Wing Move
Details
       

 04-03-2016
4.00
Various Wiring Tasks
Details

 04-02-2016
2.00
Mount Subpanel Componets
Details
       

 04-01-2016
0.50
Solder ELT Connector
Details
     

 03-30-2016
0.50
Rivet Subpanel, SV-NET Wire
Details
     

 03-28-2016
3.00
FWF Electrical
Details
       

 03-26-2016
6.00
Wiring and Subpanel Cut
Details
       

 03-23-2016
1.00
Ran Altenator and Flow Wires
Details

 03-16-2016
1.50
Wing Tip Ribs
Details

 02-21-2016
3.00
Sanded and Filled Epoxy and Wiring
Details
       

 02-05-2016
1.50
Wing Conduit
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.