KitLog pro

Powered By Kitlog Pro v2.0

Davids Pipistrel Build Website
Work Logs Found: 14
Category Work Time: 50 Hours
 Date
Hours
Work Log Summary

Details

 09-26-2021
1.00
Applied gap tape to ailerons

 12-29-2017
1.00
Installed locknuts on both ailerons
Details

 12-28-2017
2.00
Ground down right wing hinge
Details

 12-27-2017
3.00
Trimmed trailing edge of right aileron
Details
       

 12-27-2017
3.00
Trimmed trailing edge of left aileron
Details

 11-18-2017
4.00
Finished fitting right aileron
Details

 11-12-2017
4.00
Finished fitting left aileron
Details

 02-07-2016
6.00
Ground Hinge holes in flaperon to meet 28 and 33 d
Details
       

 02-06-2016
4.00
Prepared right flaperon for installation
Details
       

 01-31-2016
2.00
Finished fitting and installed flapperon for left
Details
     

 01-28-2016
1.00
Sanded trailing edge of left wing
Details
     

 01-24-2016
8.50
Ground the hinge slots and end of flapperon
Details

 01-24-2016
8.00
Fitted flapperons to the wing
Details
       

 11-17-2015
2.00
Ground off excess carbon fiber on ailerons
Details