KitLog pro

Powered By Kitlog Pro v2.0

Davids Pipistrel Build Website
Work Logs Found: 29
Category Work Time: 132 Hours
 Date
Hours
Work Log Summary

Details

 04-27-2019
4.00
Zip tied wiring in instrument panel
       

 02-09-2019
1.00
Tested everything on Power Panel

 02-09-2019
2.00
Installed power panel

 01-26-2019
6.00
Routed wires in bottom of instrument panel and wir

 01-12-2019
1.00
Drilled holes in base of Instrument panel for wire

 12-16-2018
1.00
Wired up landing light current limiter harness
       

 12-01-2018
2.00
Connected Landing Light to power panel
Details

 11-10-2018
3.00
Routed, connected general wiring harness connector
Details
       

 10-27-2018
1.50
Added sheathing to trim position indication wires
Details

 10-21-2018
4.00
Added connectors to general power harness
Details

 10-20-2018
3.00
Added X83 radio connector to harness, connected
Details

 10-14-2018
6.00
Threaded new hardesses through fuselage wire tube
Details

 10-07-2018
4.00
Fixed Dynon power wires in supplied harness
Details

 09-08-2018
18.00
Designed and manufactured COM wire harness
Details
     

 09-01-2018
16.00
Designed and built general power wire harness
Details

 08-25-2018
2.00
Attached connector and cap to Aileron Servo
Details
       

 08-25-2018
2.00
Added cap to Elevator Servo wire harness
Details
       

 08-20-2018
4.00
Manufactured Elevator Servo wire harness
Details
     

 11-05-2017
16.00
Completed power panel wiring
Details

 09-23-2017
4.00
Finished D1000 main wire harness
Details

 09-20-2017
1.00
Made one Headphone Jack wire harness
Details

 09-09-2017
1.50
Installed power connectors on Dynon cables
Details

 07-22-2017
3.50
Wire tied hoses and wires in engine compartment

 07-16-2017
1.50
Installed wiring for landing light
Details

 04-22-2017
16.00
Planning, labeling and installing circuit breakers
Details
       

 08-28-2016
2.00
Replaced main electrical board with updated board
Details
     

 09-02-2015
1.00
Installed Rotax electronics to Pipistrel firewall
       

 08-30-2015
1.00
Attached the main 12volt distribution board
Details
     

 08-28-2015
4.00
Wired the main 12 volt bus with key box
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.