KitLog pro

Powered By Kitlog Pro v2.0

Davids Pipistrel Build Website
Work Logs Found: 7
Category Work Time: 16 Hours
 Date
Hours
Work Log Summary

Details

 07-08-2017
2.50
Installed radiator overflow tank
Details
       

 06-24-2017
1.00
Installed radiator hoses
     

 06-24-2017
2.00
Installed foam on radiator inlet
Details
     

 06-17-2017
3.00
Installed foam on engine air inlet baffle
Details
     

 06-10-2017
4.00
Manufactured a radiator baffle, and installed it
Details
       

 06-09-2017
2.00
Installed sealing foam on oil cooler baffles
Details

 08-23-2015
1.00
Mounted Radiator
Details
     










Copyright © 2001-2024 Matronics. All Rights Reserved.