Powered By Kitlog Pro v2.0
Davids Pipistrel Build Website
Virus SW 912iS
Miscellaneous
Work Logs Found:
41
Category Work Time:
92 Hours
Date
Hours
Work Log Summary
Details
10-02-2021
1.00
Performed Weight and Balance
Details
09-26-2021
8.00
Trailered airplane and wings to airport hanger and
Details
09-12-2021
4.00
Manufactured and install Experimental and N-number
Details
09-05-2021
2.00
Installed all placards and information stickers
Details
08-22-2021
1.00
Installed seat belts and seats
09-08-2019
1.00
Added stickers to various controls and installed f
Details
08-18-2019
2.00
Wired circuit board on Ray Allen control sticks
Details
05-28-2019
1.00
Installed bagage compartment components for markng
Details
05-27-2019
4.00
Installed velcro for seats and Dynon instruments
Details
05-26-2019
1.00
Drilled holes for transponder antenna cable in rea
Details
04-13-2019
2.00
Attached pedal adjustment springs to bottom of fus
12-29-2018
2.00
Installed Cockpit light
03-04-2018
1.00
Installed Cockpit light
Details
04-15-2017
1.00
Installed landing light
Details
03-17-2017
3.00
Swapped out incandescent landing light bulb
Details
01-27-2016
1.00
Finished left airbrake
Details
01-20-2016
1.50
Assembled airbrake and installed in wing.
Details
01-15-2016
1.50
fitted left airbrake
Details
01-14-2016
1.50
Trial assembled left airbrake
Details
01-13-2016
1.50
Prepared and test assembled left airbrake
Details
01-12-2016
1.50
Ground top side base of left wing
Details
01-04-2016
1.50
Fitted wing tip light lens to wingtip
01-02-2016
2.50
pulled wires for stobe lights
Details
01-02-2016
2.00
Fitting strobe lights into wing
11-22-2015
3.00
Repaired holes in fuselage
Details
11-22-2015
2.00
Drilled holes for static air
Details
09-12-2015
4.00
Installed Tanis engine heater to my Rotax 912 is S
Details
09-07-2015
2.00
Wired the trim controller and trim motor
Details
09-05-2015
1.00
Attempted to install Static Air Vents
Details
09-04-2015
2.00
Installed OAT Probe
09-04-2015
3.00
Installed Dynon ADAHRS unit
08-30-2015
2.00
Cut holes in firewall upholstery and firewall heat
Details
08-29-2015
2.00
Installed the forward side upholstery
Details
08-29-2015
2.00
Applied the insulated firewall upholstery to the c
Details
08-23-2015
1.00
Mounted Oil reservoir bracket
Details
08-22-2015
4.00
Studied Pipistrel Schematics
Details
08-08-2015
3.00
Assembled Instrument panel
Details
06-28-2015
8.00
Installed interior upholstery
Details
06-14-2015
2.00
Glued Firewall heat shield in place
Details
06-07-2015
1.50
Fit the firewall heat shield
Details
05-29-2015
0.50
Fixed throttle quadrant
Details
SITE NAVIGATION
Contact Builder
Virus SW 912iS Home
Category
# Logs
# Hours
All
420
1261
Ailerons
14
50
Avionics
41
96
Baffling And Cooling
7
16
Baggage Area
3
7
Brake System
9
35
Busses
29
132
Canopy
13
30
Center Fuselage
2
10
Doors
25
58
Empennage
1
1
Engine
16
66
Flight Controls
34
110
Forward Fuselage
15
64
Fuel Lines
18
50
Fuel System
18
50
Fuel Tanks
3
5
Gear Fairings
2
2
Horizontal Stabilizer
5
14
Main Gear
8
18
Miscellaneous
41
92
Nosewheel
6
24
Parachute
16
38
Parts Preparation
24
56
Prop
5
4
Rear Fuselage
1
2
Rudder
3
10
Tools
2
8
Vertical Stabilizer
1
4
Windshield
13
30
Wing Tips
6
11
Wings
4
18
Wings to Fuselage
6
18
Wiring
29
132
Copyright © 2001-2024 Matronics. All Rights Reserved.