KitLog pro

Powered By Kitlog Pro v2.0

Davids Pipistrel Build Website
Work Logs Found: 34
Category Work Time: 110 Hours
 Date
Hours
Work Log Summary

Details

 08-28-2021
4.00
Modified trim spring connection to elevator push r
Details

 08-07-2021
0.25
Installed control stick boot covers

 08-01-2021
4.00
Installed elevator stops and adjusted travel
Details

 07-25-2021
8.00
installed and adjusted all control pushrods
Details

 07-24-2021
2.00
Installed RayAllen grips on control sticks
Details
       

 07-28-2019
2.00
3D routed Ray Allen control stick
Details
     

 09-15-2018
8.00
Working on joystick switch solution
Details

 03-04-2018
3.00
Installed Aileron Cluch rods and tube link bearing
Details
     

 12-16-2017
4.00
installed air brake and aileron clutches, test fit
Details
     

 12-16-2017
1.00
Ground out nylon air brake centering ring
Details

 12-02-2017
4.00
Finished airbrake handle latch
Details
       

 12-01-2017
2.00
Re-drilled hole in air brake handle for latch
Details
     

 11-26-2017
2.00
Filled in hole drill in air brake handle with wood
Details

 11-25-2017
4.00
Measured and drilled air brake handle for latch ho
Details

 11-22-2017
2.00
Riveted air brake clutches
Details
       

 11-22-2017
4.00
Fit air brake handle and clutches
Details

 11-21-2017
1.00
Shortened and riveted left aileron clutch
Details

 11-20-2017
0.50
Installed center support for aileron clutches
Details

 11-20-2017
5.00
Fit aileron clutches into fuselage holes
Details
       

 09-07-2015
2.00
Installed trim control motor and springs
     

 09-06-2015
4.00
Installed and swaged rudder pedal cables
     

 09-02-2015
2.00
Installed rudder pedals for final time
Details
       

 07-31-2015
3.00
Installed electric trim servo
Details
       

 07-30-2015
6.00
Installed elevator control rods
Details
       

 07-29-2015
4.00
Installed and swaged rudder cables
Details
       

 07-17-2015
2.00
Fixed Flap Handle
Details

 06-21-2015
4.00
Installed control sticks and control hardware unde

 06-21-2015
4.00
Finished rudder cable outer installation

 06-18-2015
1.50
Installing rudder cable outers

 06-17-2015
1.50
Finished rudder pedal adjustment install. Started

 06-15-2015
2.00
Drilling holes for rudder cables and rudder pedal
Details

 06-04-2015
2.50
Installed Rudder Pedals
Details
     

 05-30-2015
6.00
Installed then removed elevator/aileron control sy
Details
       

 05-25-2015
5.00
Mounted trim control and throttle quadrant
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.