Powered By Kitlog Pro v2.0
Davids Pipistrel Build Website
Virus SW 912iS
Forward Fuselage
Work Logs Found:
15
Category Work Time:
64 Hours
Date
Hours
Work Log Summary
Details
08-12-2017
2.00
Loctited cowl quick release screws
07-29-2017
6.00
Fixed cowl release screw in wrong location
Details
12-27-2016
0.50
Installed quick release screws to attach top cowl
Details
12-27-2016
0.50
Cut out hole in cowl for gascolator
Details
11-26-2016
4.00
Measured and cut out exhaust pipe holes
Details
11-25-2016
7.00
Attached cowl to front of airplane.
Details
11-05-2016
4.00
Fixed Cowl so it lies flush with fuselage
Details
10-22-2016
6.00
Finished Nose wheel slot in the cowl
Details
10-15-2016
16.00
Fit front cowl on the front of the airplane
Details
09-24-2016
8.00
Cut out slot for nose wheel
Details
09-17-2016
4.00
Fit front cowl halves together and installed quick
Details
08-24-2015
2.00
Drilled/Cut holes in firewall for electronics
Details
06-08-2015
1.00
Drilled holes in firewall for engine controller ca
05-25-2015
1.00
Cut hole in firewall for nose gear steering arm an
05-24-2015
2.00
Painted front defroster channel
SITE NAVIGATION
Contact Builder
Virus SW 912iS Home
Category
# Logs
# Hours
All
420
1261
Ailerons
14
50
Avionics
41
96
Baffling And Cooling
7
16
Baggage Area
3
7
Brake System
9
35
Busses
29
132
Canopy
13
30
Center Fuselage
2
10
Doors
25
58
Empennage
1
1
Engine
16
66
Flight Controls
34
110
Forward Fuselage
15
64
Fuel Lines
18
50
Fuel System
18
50
Fuel Tanks
3
5
Gear Fairings
2
2
Horizontal Stabilizer
5
14
Main Gear
8
18
Miscellaneous
41
92
Nosewheel
6
24
Parachute
16
38
Parts Preparation
24
56
Prop
5
4
Rear Fuselage
1
2
Rudder
3
10
Tools
2
8
Vertical Stabilizer
1
4
Windshield
13
30
Wing Tips
6
11
Wings
4
18
Wings to Fuselage
6
18
Wiring
29
132
Copyright © 2001-2024 Matronics. All Rights Reserved.