Powered By Kitlog Pro v2.0
Davids Pipistrel Build Website
Virus SW 912iS
Doors
Work Logs Found:
25
Category Work Time:
58 Hours
Date
Hours
Work Log Summary
Details
12-21-2018
3.00
Fit doors on airplane
Details
05-28-2018
0.25
Installed lock on right door
05-28-2018
0.50
Installed door latching mechanism on right door
05-28-2018
0.50
Finished grinding out hole for latch arm on right
Details
04-21-2018
1.00
Made aluminum washers for door locks
Details
04-21-2018
0.25
Installed lock on left door
Details
04-14-2018
0.50
Installed door latching mechanism on left door
Details
04-07-2018
2.00
Installed lexan window opening covers
Details
03-31-2018
2.00
Installed lexan windows on doors
Details
02-15-2016
2.00
Riveted left door hinges
Details
02-15-2016
4.00
Fixed rivets on door hinges
Details
02-14-2016
4.00
Fixed rivets on right door hinges
Details
02-08-2016
1.00
Drilled out rivet in right door where rivet pulled
Details
12-28-2015
3.00
Mounted Left door latch
Details
12-26-2015
3.00
Sanded door lexan windows to correct size
Details
12-26-2015
1.00
marked lock key cylinders in the door windows
Details
12-26-2015
1.50
Attached locking latches to door latch rods
Details
12-13-2015
6.50
Attached doors to fuselage
Details
12-12-2015
5.50
Drilling holes for door latch bars for right door
Details
12-07-2015
1.00
Temporarily installed door latch
Details
12-06-2015
6.00
Attached windows to right and left doors
Details
11-30-2015
4.00
Fitted right door
Details
11-21-2015
2.00
Marked and sanded left door
10-03-2015
3.00
Attached weather stripping to left door and fit it
Details
05-16-2015
1.00
Painted door lexan channel
SITE NAVIGATION
Contact Builder
Virus SW 912iS Home
Category
# Logs
# Hours
All
420
1261
Ailerons
14
50
Avionics
41
96
Baffling And Cooling
7
16
Baggage Area
3
7
Brake System
9
35
Busses
29
132
Canopy
13
30
Center Fuselage
2
10
Doors
25
58
Empennage
1
1
Engine
16
66
Flight Controls
34
110
Forward Fuselage
15
64
Fuel Lines
18
50
Fuel System
18
50
Fuel Tanks
3
5
Gear Fairings
2
2
Horizontal Stabilizer
5
14
Main Gear
8
18
Miscellaneous
41
92
Nosewheel
6
24
Parachute
16
38
Parts Preparation
24
56
Prop
5
4
Rear Fuselage
1
2
Rudder
3
10
Tools
2
8
Vertical Stabilizer
1
4
Windshield
13
30
Wing Tips
6
11
Wings
4
18
Wings to Fuselage
6
18
Wiring
29
132
Copyright © 2001-2024 Matronics. All Rights Reserved.