Powered By Kitlog Pro v2.0
Steven's RV-9A
RV-9A
Engine
Work Logs Found:
22
Category Work Time:
116 Hours
Date
Hours
Work Log Summary
Details
05-16-2018
4.00
Re-installed right magneto
Details
05-07-2018
6.00
Attempted to start engine
Details
04-27-2018
8.00
Fuel Injector Servo
Details
12-16-2017
6.00
Misc. finish up work to get out of the garage
Details
12-12-2017
2.50
Odds and ends to finish engine
Details
12-10-2017
2.00
Engine odds and ends
Details
12-06-2017
2.00
Permanent riviting of baffle gaskets
Details
12-03-2017
6.00
Misc. Engine Accessories
Details
12-02-2017
5.00
Baffle detailing
Details
11-30-2017
1.50
fabricated oil cooler brace
Details
11-29-2017
1.50
prepped all the parts of the oil cooler
Details
11-28-2017
3.00
Baffle tension rods
Details
11-26-2017
8.00
Working on engine baffles
Details
11-21-2017
15.00
slowly working on baffles
Details
11-06-2017
2.00
cylinder #1 and #2 baffles
Details
11-05-2017
12.00
Started baffles
Details
10-12-2017
3.00
FAB box test fitting
Details
10-11-2017
4.00
Still trying to figure out mixture arm
Details
10-03-2017
3.50
Continued work on FAB
Details
10-02-2017
8.00
Working on the fit of the Fresh Air Box
Details
08-19-2017
8.00
Engine is on the plane
Details
08-07-2017
5.00
Buttoning up odds and ends before engine mount
Details
SITE NAVIGATION
Contact Builder
RV-9A Home
Category
# Logs
# Hours
All
200
1014
Avionics
12
54
Empennage
2
16
Engine
22
116
Fuselage
86
367
Miscellaneous
62
356
None
1
12
Shop Supplies
2
20
Wings
13
73
Copyright © 2001-2024 Matronics. All Rights Reserved.