KitLog pro

Powered By Kitlog Pro v2.0

Steven's RV-9A
Work Logs Found: 22
Category Work Time: 116 Hours
 Date
Hours
Work Log Summary

Details

 05-16-2018
4.00
Re-installed right magneto
Details

 05-07-2018
6.00
Attempted to start engine
Details

 04-27-2018
8.00
Fuel Injector Servo
Details

 12-16-2017
6.00
Misc. finish up work to get out of the garage
Details

 12-12-2017
2.50
Odds and ends to finish engine
Details
       

 12-10-2017
2.00
Engine odds and ends
Details
       

 12-06-2017
2.00
Permanent riviting of baffle gaskets
Details
     

 12-03-2017
6.00
Misc. Engine Accessories
Details
       

 12-02-2017
5.00
Baffle detailing
Details
       

 11-30-2017
1.50
fabricated oil cooler brace
Details
     

 11-29-2017
1.50
prepped all the parts of the oil cooler
Details

 11-28-2017
3.00
Baffle tension rods
Details
       

 11-26-2017
8.00
Working on engine baffles
Details
       

 11-21-2017
15.00
slowly working on baffles
Details

 11-06-2017
2.00
cylinder #1 and #2 baffles
Details
     

 11-05-2017
12.00
Started baffles
Details
       

 10-12-2017
3.00
FAB box test fitting
Details
       

 10-11-2017
4.00
Still trying to figure out mixture arm
Details
       

 10-03-2017
3.50
Continued work on FAB
Details
     

 10-02-2017
8.00
Working on the fit of the Fresh Air Box
Details

 08-19-2017
8.00
Engine is on the plane
Details
       

 08-07-2017
5.00
Buttoning up odds and ends before engine mount
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.