KitLog pro

Powered By Kitlog Pro v2.0

Steven's RV-9A
Work Logs Found: 86
Category Work Time: 367 Hours
 Date
Hours
Work Log Summary

Details

 10-16-2017
6.00
Finishing FAB and cowling
Details

 09-24-2017
13.00
Misc. cowling work
Details

 09-19-2017
1.00
More fiberglass on the cowling
Details

 08-08-2017
1.50
Extended canopy tracks for supertracks
Details
     

 07-24-2017
2.00
cleaning up odds and ends before oshkosh
Details
       

 07-22-2017
8.00
Finished canopy fairing and reopened canpy
Details
       

 07-19-2017
1.50
canopy fairing
Details

 07-18-2017
1.50
Fiberglass canopy fairing
Details
       

 07-17-2017
10.00
Prep and start fiberglass
Details
       

 07-14-2017
3.00
final adjustments before fiberglass
Details

 07-11-2017
1.00
canopy lift tabs
Details
     

 07-10-2017
2.50
put canopy back on airplane
Details
       

 07-09-2017
12.00
Final assembly of canopy
Details
       

 07-05-2017
1.50
paint repairs

 07-03-2017
7.00
Took everything apart and painted
Details
       

 06-05-2017
1.50
installed right canopy skirt
Details
       

 06-03-2017
8.00
finished laying out the skirts
Details

 05-13-2017
3.00
Started fabrication of side skirts
Details

 05-10-2017
0.50

Details

 05-08-2017
2.00
finishing windscreen
Details

 05-07-2017
6.00
A lot of misc. canopy tasks
Details
       

 05-06-2017
6.00
misc canopy work
Details
       

 05-05-2017
1.75
Installed c-665 canopy stop blocks
Details
       

 05-04-2017
1.25
started to final fit canopy
Details
     

 05-03-2017
1.75
canopy tracks and odds and ends
Details
       

 05-02-2017
2.00
canopy tracks
Details
       

 05-01-2017
1.50
finished riveting forward top skin
Details
     

 04-29-2017
8.00
misc - pre caonopy tasks
Details

 04-03-2017
0.75
sanded bevel on forward edge of windscreen
Details

 04-02-2017
10.00
prepped/primed/dimplesed and set top skin
Details
       

 03-29-2017
1.25
deburred and prepped top skin
Details

 03-21-2017
1.50
Installed air vents
Details
     

 01-29-2017
5.00
Main gear fairings continue
Details
       

 01-28-2017
5.50
Started on landing gear wheel fairings
Details
       

 01-24-2017
1.25
Bagage area led lights
Details
     

 01-23-2017
1.25
Made some brackets for LED lights for the baggage
Details
     

 01-22-2017
15.00
cleaned up electrical problems, installed gear
Details
     

 01-15-2017
10.00
Put together three landing gear legs
Details
       

 01-05-2017
1.00
started drilling plexiglass slider
Details
     

 01-04-2017
1.00
misc small stuff
Details

 01-02-2017
1.00
odds and ends
Details

 01-01-2017
4.00
final sizing the canopy
Details
       

 12-31-2016
2.00
The "Big Cut"
Details
       

 12-30-2016
7.00
cutting
Details
       

 12-28-2016
3.00
Riveted on rear top deck
Details
       

 12-26-2016
2.00
first cuts on canopy
Details
       

 12-24-2016
3.00
Puzzled by canopy instructions
Details
       

 12-20-2016
0.50
Some minor top skin riviting
Details

 12-18-2016
12.00
set up the canopy slide
Details
       

 12-14-2016
1.50
struggled with roll bar bolts
Details
       

 12-13-2016
1.50
made spaces and blind drilled roll bar
Details
       

 11-02-2016
2.50
GSA 28 and heater box
Details
       

 10-30-2016
8.00
Misc. finishing before wiring
Details
       

 10-29-2016
2.00
finished battery box
Details
     

 10-27-2016
1.50
battery box
Details
     

 10-26-2016
1.50
Installed flap positioner
Details
       

 10-25-2016
1.00
continued to finish riveting the front deck
Details

 10-24-2016
12.00
Cleaning up front deck
Details

 10-20-2016
1.00
Battery box and strap
Details
     

 10-16-2016
20.00
Finishing up the fuselage
Details
       

 09-17-2016
7.00
Control sticks and bell crank
Details
       

 09-14-2016
3.00
Ran rudder and seat belt cables
Details
     

 09-11-2016
13.00
Wrapping up the fuselage kit
Details
       

 09-08-2016
1.00
Set up firewall penetrations
Details

 09-06-2016
1.00
Fuel line for fuel injected engines not on drawing
Details

 09-05-2016
18.00
Working on plumbing
Details
       

 08-11-2016
2.00
Painted removable cockpit elements
Details
     

 08-08-2016
1.00
set up for plumbing
Details

 08-07-2016
9.00
main gear mounts and crotch straps
Details
       

 08-06-2016
2.00
set first main gear bracket
Details

 07-13-2016
2.00
continued work on the flaps
Details

 07-11-2016
1.50
Scuffed and primed
Details
     

 07-10-2016
6.00
Utility tunnel cover and flap controller
Details
       

 07-09-2016
8.00
Put seats together
Details
       

 07-08-2016
3.00
Utility tunnel cover
Details
     

 07-04-2016
5.00
cabin floor panels
Details
       

 07-02-2016
6.00
Baggage area and rear skins
Details
       

 07-01-2016
1.50
alligned baggage compartment barn door
Details

 06-30-2016
2.00
Nut plates on F-706
Details
     

 06-29-2016
1.50
Fitted and drilled rear baggage panel
Details

 06-27-2016
1.00
Working on corregated back panel
Details

 06-26-2016
6.00
Installed baggage floor and side panels
Details
       

 06-23-2016
2.00
Installed port and starboard steps
Details
       

 06-19-2016
5.00
fitted steps
Details

 06-14-2016
2.00
Test fitted top skins
Details
     

 06-13-2016
2.50
Fitting fuselage forward top deck
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.