KitLog pro

Powered By Kitlog Pro v2.0

Greg's RV-12 Classic N719VA
Work Logs Found: 204
Category Work Time: 388 Hours
 Date
Hours
Work Log Summary

Details

 09-12-2022
4.00
Tightened canopy screws, ELT label
Details

 08-24-2022
5.25
finished install of rear window
Details
       

 08-17-2022
1.50
fixed ELT, installed some placards
Details
       

 08-16-2022
4.00
taxi, ELT work and rear window prep
Details
       

 08-15-2022
4.00
fairings, rear window work
Details
       

 08-14-2022
2.00
fairings sanding and finish priming
Details

 08-04-2022
8.00
taxi test, re-bleed right brake
Details

 08-03-2022
3.00
fit seat backs and bottoms
Details
       

 08-02-2022
2.00
install shoulder harnesses, other
Details
       

 08-01-2022
3.75
Install some seatbelts
Details
       

 06-23-2022
4.00
sand fit canopy, cotterpins on mains
Details
     

 06-17-2022
1.75
blue wrap on crossover bar
Details
     

 05-25-2022
1.75
partial install of rear window
Details

 05-11-2022
2.75
screwed rear bulkhead plate, misc
Details
     

 04-21-2022
2.50
put wrap on center support of roll bar
Details
     

 04-12-2022
6.50
bleed the brake lines
Details
     

 12-15-2021
2.00
verified wire tie, replace wing roller bushings
Details

 11-14-2021
2.25
finalize aft window fit, safety wire air cleaners
Details
       

 11-10-2021
0.75
drill #27 rear edge of aft window
Details

 11-09-2021
3.50
drill and tap #36 holes, sanded window for gap fit
Details

 11-08-2021
3.25
finished drilling #30 and #40 holes in aft window
Details
       

 11-07-2021
5.25
fit and clamp aft window
Details
       

 11-06-2021
1.50
finish rivet turtle deck skins
Details

 11-05-2021
1.50
rivet turtle deck skins
Details

 11-04-2021
2.75
Install fuel tank, fuel lines, fuel sender wire
Details
       

 11-03-2021
2.35
install shoulder harness cables cleco left turtle
Details

 10-09-2020
1.25
work on redo of gascolator safety wiring
Details

 10-07-2020
1.00
painted both turtle deck skins
Details

 10-06-2020
1.00
Prepped right turtle deck skin and primed both
Details

 10-05-2020
0.50
prep turtle deck skins for painting
Details

 09-30-2020
0.50
paint fuel filler neck
Details

 09-29-2020
0.75
prime fule tank filler neck
Details

 07-25-2020
1.50
finish installing rivnuts on tailcone for fairing
Details
       

 07-19-2020
7.25
remove stabilator, start installing rivnuts for fa
Details
     

 07-18-2020
5.50
file and sand stab. and fairing, final drill fairi
Details
       

 07-17-2020
2.50
install stabilator, drill remaining fairing holes
Details
       

 07-16-2020
2.75
clamp tailcone fairing, drill inboard holes in tai
Details
     

 07-15-2020
2.30
move stab. to side wall, install vertical stab. to
Details
     

 07-12-2020
1.00
move wings to basement, stabilator to garage
Details

 07-11-2020
1.00
move fuselage in the garage
Details

 07-08-2020
4.00
Rivet rivnuts to nose wheel fairing brkt, install
Details
       

 07-07-2020
2.50
Attach fairing brackets on nose fork
Details

 07-01-2020
1.75
installed wire connectors, ran control cables
Details
       

 06-30-2020
2.50
clean wiring, routed wiring in tailcone
Details
       

 06-29-2020
1.00
clean-up wire/tube bundles under 7 thru panel base
Details
       

 06-28-2020
1.00
finish routing the pitch trim/pitot tube thru pane
Details

 06-27-2020
3.00
Clean-up & run wiring and tube
Details

 06-26-2020
4.50
wiretie and RTV filter near fuel pump
Details
     

 06-23-2020
0.50

Details

 06-22-2020
4.00
run pitch trim cable & aft pitot tube further
Details

 06-21-2020
2.30
Run pitch trim cable & pitot tube through fuselage
Details

 06-20-2020
1.50
remove blue plastic from inside of turtle deck pie
Details
     

 06-03-2020
1.50
connect aft stabilator control cables
Details

 06-02-2020
3.00
deburr parts, review KAI
Details

 05-13-2020
1.50
canopy latch handle rotation tightening
Details
       

 04-10-2020
1.25
investigate brake line bleed process, etc.
Details

 04-09-2020
1.75
make 0.125" spacers for wing install
Details

 04-06-2020
1.25
assemble rudder rigging stop, other
Details
     

 04-03-2020
1.56
fabricate one fuel vent tube and start on other
Details
       

 04-02-2020
2.50
Assemble tow bar, work on fuel vent line items
Details
       

 04-01-2020
1.00
Check fuel tank vent instructions, debur part
Details

 03-24-2020
0.50
Cut and install flaperon torque tube grommets
Details
     

 03-21-2020
1.25
test pivot guides fit of flaperon torque tubes
Details

 03-11-2020
0.50
rough cut the wood for the rudder rigging
Details

 02-27-2020
1.25
Complete vent handle install
Details

 02-18-2020
0.50
start install of fresh air vent handles
Details

 11-15-2019
1.00
install steps with plugs
Details

 11-14-2019
1.00
install step plugs per Notification 19-10-16
Details
       

 11-12-2019
1.50
further check of interior plus download manuals
Details

 11-08-2019
1.90
fuel tank and interior investigation
Details

 11-07-2019
0.50
check pre-built fuel tank and note on 37B
Details

 10-24-2019
0.25
inspect canopy pivots
Details

 10-23-2019
1.50
add epoxy/flox to space fiberglass from fuselage
Details
       

 09-25-2019
0.33
enlarge fiberglass hole at canopy pivot point
Details

 09-23-2019
0.50
verify washer used on canopy hinge point
Details

 08-28-2019
1.25
remove and trim canopy
Details

 08-09-2019
1.25
canopy trimming and sanding
Details

 08-02-2019
1.75
work on canopy fit
Details

 08-01-2019
1.25
work on canopy
Details

 12-15-2018
1.85
trim and sand fiberglass with multi-tool
Details
       

 12-05-2018
1.50
redrill holes for canopy scews, trim & sand fiberg
Details
       

 11-09-2018
2.25
34-16
Details
     

 11-08-2018
1.50
Sand canopy fairing w/100 & 150 grit
Details

 11-05-2018
1.25
Sand and apply epoxy only
Details

 11-02-2018
1.00
sand with 100 and 150 grit, apply epoxy w/balloons
Details

 11-01-2018
2.50
sand fairing, apply epoxy
Details
       

 10-31-2018
1.00
sanding canopy fiberglass fairing
Details

 10-29-2018
0.75
sand and add more expoxy/microbead layer
Details

 10-26-2018
1.50
remove middle pealply, sand and fill gaps
Details
       

 10-23-2018
2.50
epoxy middle 10 plies and pealply
Details
       

 10-22-2018
1.50
remove pealply from right, cut middle plies
Details

 10-19-2018
2.25
fiberglass right side of canopy
Details
       

 10-18-2018
3.00
wax left side and apply fiberglass to left side
Details
       

 10-17-2018
1.50
sanded canopy and metal parts for glass bonding
Details

 10-16-2018
3.50
cut left and right fiberglass plies 1 - 5
Details

 10-10-2018
4.00
finish sanding foam, apply electrical tape to cano
Details
       

 10-06-2018
0.75
More sanding shaping of the foam
Details

 10-05-2018
1.00
epoxy left side foam, start shaping foam
Details

 10-04-2018
1.50
Scuff and epoxy right side only canopy foam
Details

 09-24-2018
1.75
Cut canopy foam and final paint steps
Details
     

 09-22-2018
0.25
Final coat of paint on steps
Details

 09-21-2018
2.50
Sand, prime paint steps; finish masking
Details
       

 09-17-2018
1.25
Mask instrument panel
Details

 03-09-2018
1.50
rivet left side F-1237-L
Details
     

 03-08-2018
3.75
deburr parts and rivet cover plates
Details
     

 03-07-2018
0.75
secure poly brake lines with tie wraps
Details

 03-04-2018
1.25
Install left main alum brake line, add tie wrap
Details
       

 03-02-2018
2.00
connect brake lines
Details
     

 02-28-2018
0.25
install nose wheel turn stop screw
Details

 02-22-2018
1.25
Install nose wheel
Details
       

 02-21-2018
3.50
nose gear mount, install rivnuts, nose fork
Details

 02-16-2018
2.00
modify nose wheel fork
Details

 02-07-2018
2.50
Bolt on mains axles, attached wheels
Details
       

 01-31-2018
1.33
mount main axles, check allignment
Details
     

 01-30-2018
3.50
Torque all gear leg attach bolts
Details

 01-22-2018
2.00
install left and right gear legs, install inbd. pl
Details

 01-19-2018
2.25
install outboard gear leg doubler and wear plates
Details

 01-13-2018
0.75
grease main wheel bearings, grease steel parts
Details

 01-12-2018
1.25
Debur and prime gear plates
Details
     

 01-11-2018
2.00
Finish second main tire and assemble brake conn.
Details
       

 01-10-2018
2.80
Install engine mount, start on wheels and tires
Details
       

 01-09-2018
1.67
Start install of upper engine mount
Details

 11-17-2017
2.50
rivet canopy skitrts to frame and bolt and rivet
Details
       

 11-16-2017
1.20
Screw canopy to rear bow of frame
Details

 11-15-2017
1.00
put canopy on frame, clecoed front bow
Details

 11-04-2017
1.00
2nd coat paint and paint canopy skirts
Details

 11-03-2017
1.00
paint the canopy frame
Details
     

 11-02-2017
1.75
Prep and prime canopy frame
Details

 10-26-2017
1.50
fabricate two canopy lift handles
Details

 10-19-2017
1.40
Canopy guide plates and guide blocks
Details
       

 10-18-2017
0.50
Round edges on canopy latch handle
Details
       

 10-17-2017
3.17
Final drill canopy, countersink, start latch handl
Details

 09-07-2017
0.50
apply Permatex bead on instrument panel doubler
Details

 09-06-2017
0.75
remove instrument panel cover
Details

 09-02-2017
1.50
Complete right side canopy attach angles
Details
       

 08-29-2017
1.00
Flute and match drill left side canopy attach angl
Details
       

 08-29-2017
2.25
Attach canopy frame
Details
       

 08-26-2017
0.25
Finish right side canopy attach angles
Details

 08-25-2017
1.75
finish deburr of canopy frame, drill C-1203A and B
Details

 08-24-2017
1.25
attach canopy latch handle stop to canopy frame
Details

 08-23-2017
2.00
canopy frame prep
Details

 08-22-2017
2.00
prep canopy gas strut
Details

 08-17-2017
1.25
deburr and attach rear baggage floor piece
Details
     

 08-16-2017
1.50
assemble rear bulkhead covers and install
Details
     

 08-15-2017
2.00
work on rear bulkhead cover for behind fuel tank
Details

 08-11-2017
3.25
attach flap handle cover and front tunnel cover
Details
       

 07-07-2017
3.00
Install/route stabilator cables & pulleys
Details
     

 07-04-2017
3.00
Straighten control sticks
Details

 06-29-2017
3.67
finish install of stabilator/rudder cables and sle
Details
     

 06-28-2017
1.50
Install rudder cables and sleeves
Details
       

 06-27-2017
0.50
Epoxy flaperon torque tube spacers
Details
       

 06-22-2017
1.00
Drill flaperon torque tube spacers, grease detent
Details

 06-20-2017
1.50
attach flap detent bracket,rivet flap handle knob
Details
       

 06-15-2017
0.50
attach flap handle knob, shorten flap handle sprin
Details

 06-13-2017
2.75
Fabricate flap handle parts and detent bracket
Details
       

 05-31-2017
5.00
fabricate and attach flaperon pushrods
Details
       

 05-26-2017
1.75
Attach control stick push rods, wire connector
Details
       

 05-24-2017
0.50
Tried to attach push rods
Details

 05-19-2017
3.00
Polish and attach control stick bushings
Details
       

 05-18-2017
1.50
Construct 2 Control Stick Push Rod assemblies
Details

 05-17-2017
1.50
Assemble flaperon mixer arms
Details
       

 05-16-2017
1.67
mount flap handle and blocks
Details
       

 05-16-2017
1.25
finish wiring system mount blocks
Details
       

 05-12-2017
1.50
fabricate flap handle blocks
Details
     

 05-11-2017
1.75
deburr parts, mount bearings, assemble flap pushro
Details
       

 05-06-2017
1.25
install brake reservoir
Details
       

 05-05-2017
2.25
Complete SB 16-08-24 replace engine mount rivets
Details
       

 04-28-2017
1.50
install roll bar wiring for cockpit light and latc
Details
       

 04-22-2017
1.00
wire-tie wires to rudder mount wire bracket
Details

 04-19-2017
0.75
install over rudder wireway bracket
Details

 02-17-2017
2.00
Redo wiring at rudder pedal assembly
Details

 01-25-2017
2.75
Assemble parts for 31B-25 and move wires
Details

 01-21-2017
3.50
install fuel pump elec. filter and wing fuse conne
Details
       

 01-16-2017
2.00
continued wiring
Details

 01-07-2017
1.25
deburr and prep parts related to wiring
Details

 12-29-2016
2.00
wire wing connectors and pitch servo connector
Details
       

 11-30-2016
2.00
complete wiring and install of comm. connectors
Details
       

 11-19-2016
1.25
Install power port and start on comm. ports
Details

 10-09-2016
0.25
route wires along phone cable for ELT
Details

 10-05-2016
0.50
finish difficult grommet routing
Details

 09-28-2016
2.67
more routing details of WH-00045
Details
       

 09-26-2016
2.50
Install OAT, start routing of optional cable harne
Details
       

 09-20-2016
1.75
push to talk wiring routing
Details

 09-17-2016
1.75
modify for proper mount & temp install of control
Details
       

 09-16-2016
2.00
install control stick grips and wiring
Details
     

 09-15-2016
3.00
complete more wiring for fuel pump, GPS, latch sw.
Details
       

 09-14-2016
1.25
finish spar pin switch wiring and switch install
Details
       

 09-11-2016
1.00
continue spar pin switch wiring
Details

 09-09-2016
1.17
start spar pin switch wiring
Details

 09-07-2016
1.75
install audio jack, wing conn., autopilot conn.
Details
       

 09-07-2016
0.50
finish painting around power and audio connectors
Details
       

 09-06-2016
2.00
route cable harness wires
Details
       

 09-04-2016
0.25
Install left instrument cooling fan
Details

 09-02-2016
1.50
Instrument cooling fans insall
Details

 09-01-2016
1.50
finish cables install
Details
       

 08-31-2016
1.00
install conduit, start cabling
Details

 08-24-2016
1.33
prep plastic conduit
Details

 08-22-2016
1.50
install grommet and clamp
Details
       

 02-08-2016
3.00
Complete the Finish Kit inventory
       

 02-05-2016
2.50
Finish small hardware inventory
Details

 02-03-2016
2.00
continue inventory of small hardware
Details

 02-02-2016
2.00
inventory small hardware
Details

 01-27-2016
1.00
Inspect finish kit received 1/22/16
Details
       

 01-22-2016
0.75
Receive Finish Kit
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.