KitLog pro

Powered By Kitlog Pro v2.0

Air O Enterprises
Work Logs Found: 10
Category Work Time: 60 Hours
 Date
Hours
Work Log Summary

Details

 10-20-2005
3.50
Installed engine control cables
     

 10-20-2005
5.00
Engine pressure senders
     

 03-06-2005
3.25
Install Aft Bulkhead
Details
     

 02-21-2005
9.00
Install elevator control linkages and bell crank.
Details
       

 02-21-2005
8.75
Allign and mount elevator control horn.
Details
       

 02-19-2005
4.50
Fabricate and install rudder endstops.
Details
     

 02-19-2005
8.00
Allign and attach Vertical stab Leading Edge.
Details
       

 02-18-2005
7.50
Allign and install Vertical Stablizer.
Details
       

 02-17-2005
6.50
Install horizontal stabalizer.
Details
     

 01-02-2005
4.00
Installed canopy frame
Details
     










Copyright © 2001-2024 Matronics. All Rights Reserved.