Powered By Kitlog Pro v2.0
My RV-8 Build Log
RV-8
Cowl
Work Logs Found:
56
Category Work Time:
180 Hours
Date
Hours
Work Log Summary
Details
05-15-2019
2.00
Re-Installing Cowl for Fit Check
Details
04-30-2019
2.00
Cowl Interior Heat Shield
Details
05-28-2018
8.00
Upper and Lower Cowl Sanding and Cable Fairing
Details
05-26-2018
6.00
Upper and Lower Cowl Prep
Details
05-20-2018
6.00
Fitting the Cowl to Prop Spinner
Details
04-12-2018
2.00
More Cowl Finishing
Details
04-11-2018
2.00
Engine Baffle and Air Inlet Ramps
Details
04-09-2018
2.00
Air Inlet Finishing
Details
04-08-2018
4.00
Inlet Ramp Positioning
Details
04-03-2018
2.00
Top Cowl Air Inlet Ramps
Details
10-09-2017
2.00
Lower Cowl Air Inlet - Sanding
Details
10-08-2017
2.00
Lower Cowl AIr Inlet, Upper Cowl - Fill and Sand
Details
10-05-2017
2.00
Cowling - Lower Cowl Fill and Sand
Details
10-04-2017
2.00
Cowling - Oil Door and Lower Cowl Fill and Sand
Details
10-03-2017
2.00
Cowling - Oil Door Installation Part 3
Details
10-02-2017
2.00
Cowling - Oil Door Installation Part 2
Details
10-01-2017
6.00
Cowling - Oil Door Installation
Details
09-28-2017
2.00
Cowling Finish Work
Details
11-27-2016
5.00
Filling and Sanding the Cowl
Details
07-04-2016
4.00
Top Cowl Fitting with Air Seal
Details
07-02-2016
6.00
Forward Top Cowl Air Seal - Inboard and Outboard
Details
06-27-2016
2.00
Lower Cowl Air Seal
Details
06-22-2016
2.00
Bottom Cowl Air Seal
Details
06-20-2016
2.00
Botton Cowl Air Seal Clamps
Details
05-17-2016
2.00
FAB to Cowl Check
Details
05-11-2016
2.00
Lower Cowl to FAB Intake
Details
05-09-2016
2.00
Lower Cowl Air Intake
Details
04-17-2016
4.00
Making Corrections to Cowl
Details
04-12-2016
2.00
Air Induction to FAB
Details
03-29-2016
2.00
Re-Centering Camloc Holes
Details
03-28-2016
2.00
Locating Camloc holes in Top Cowl
Details
03-27-2016
6.00
Riveting Camloc Tabs to Bottom Cowl Sides
Details
03-25-2016
4.00
Locating Rivets for Bottom Cowl Camloc Tabs
Details
03-23-2016
2.00
Camlocs for Cowl Split Line
Details
03-22-2016
2.00
Working the Cowl !
Details
03-20-2016
4.00
Oil Door Cut-Out and Cam Locs
Details
03-19-2016
6.00
Top to Bottom Cowl Fitting
Details
03-17-2016
2.00
Top to Bottom Cowl Fitting
Details
03-16-2016
2.00
Top to Bottom Cowl Fitting
Details
03-15-2016
2.00
Top and Bottom Cowl Fitting
Details
03-14-2016
2.00
Cowl Fitting and Trimming
Details
03-13-2016
6.00
Cowl Fitting and Trimming
Details
03-12-2016
6.00
Fitting and Camlocs for Top Cowl
Details
03-10-2016
2.00
Fitting the Top Cowl
Details
03-09-2016
2.00
Cowl Trimming
Details
03-08-2016
2.00
Riveting Camloc Tabs to firewall Flange - II
Details
03-07-2016
2.00
Riveting Camloc Tabs to Firewall FLange
Details
03-06-2016
4.00
Skybolt Camloc Part II
Details
03-05-2016
6.00
Skybolt Camlocs Part I
Details
02-29-2016
2.00
Marking the Cowl for Trimming
Details
02-28-2016
4.00
Fitting the Cowl Top and Bottom
Details
02-27-2016
4.00
Fitting the Top and Bottom Cowl
Details
02-14-2016
3.00
Change in Plan, Cam Locs
Details
02-13-2016
4.00
Trimming Forward Cowl
Details
02-06-2016
4.00
Engine Cowl Hinge Work and Spinner Bulkhead
Details
01-23-2016
4.00
Engine Cowl Fitting and Hinge work
Details
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
876
2687
Ailerons and Flaps
1
5
Avionics
61
194
Baggage Door
1
3
Brake System
17
34
Cabin
7
40
Canopy
44
138
Cowl
56
180
DAR Inspection
1
3
Electrical
97
275
Empennage
97
342
Engine
122
322
Fairings
54
153
First Flight
1
2
Flight Control
17
46
Flight Training
2
10
Fuel System
34
106
Fuselage
98
299
Instrument Panel
17
60
Interior
13
42
Landing Gear
8
18
Lighting
10
26
Markings, Placards a
2
4
Miscellaneous
14
66
None
1
Paint and Prep
8
24
Phase I
1
2
Pitot/AOA
2
6
Post DAR Inspection
3
14
Prop
15
46
QB Kit
2
9
Static Pressure Syst
4
10
Tech Councilor Visit
1
2
Tech Inspection
1
2
Tires
1
1
Transition Training
1
10
Weight and Balance
1
3
Windscreen
27
75
Wings
34
115
Copyright © 2001-2024 Matronics. All Rights Reserved.