Powered By Kitlog Pro v2.0
Air O Enterprises
RV-8
Fuselage
Work Logs Found:
40
Category Work Time:
535 Hours
Date
Hours
Work Log Summary
Details
08-18-2006
2.50
Canopy paint jig
Details
04-30-2006
8.00
Tail intersection ferring
Details
03-20-2006
36.00
Elevator & Rudder tip assembly
Details
03-18-2006
20.00
Horizontal / Vertical stab tips
Details
03-15-2006
36.00
Canopy Skirt
Details
02-05-2006
4.50
Modified oil door
Details
02-05-2006
9.00
Cowl preparation for paint
Details
01-20-2006
24.00
Canopy skirt
Details
01-19-2006
15.00
Windscreen and glareshield
Details
01-18-2006
15.00
Canopy installation
Details
12-21-2005
24.00
Installed front cargo door
Details
12-16-2005
2.00
Installed oil dip-stick door
Details
12-09-2005
45.00
Engine cowl installation
Details
12-08-2005
9.00
Top deck installation
Details
11-20-2005
65.00
Installed cabin interior side walls
11-12-2005
8.00
Installed heater control cables
11-03-2005
7.50
Autopilot and roll trim
10-22-2005
10.00
Installed static and pitot lines
06-27-2005
85.00
Finish wheel pants and strut ferrings
Details
06-26-2005
5.00
Wheel pants and strut ferrings
Details
06-25-2005
3.00
main wiring harness
Details
06-24-2005
5.00
Firewall components
Details
06-17-2005
8.00
install landing gear ferrings, wheels pants
Details
06-12-2005
3.00
wheels and brakes
Details
06-11-2005
5.00
Install rear canopy rail
Details
06-09-2005
2.00
throttle quad and cables
Details
04-20-2005
6.00
Paint Interior
Details
03-22-2005
3.25
Added instrument panel access hole.
Details
03-21-2005
1.75
Allign and fit front windscreen weldment.
Details
03-17-2005
14.50
Install forward top fuselage skin.
Details
03-11-2005
2.25
Attached forward belly skin.
Details
03-10-2005
6.00
Install front seatback weldment.
Details
03-10-2005
3.00
Assembled wheels / tubes / tires.
Details
03-09-2005
5.50
Added rear-seat rudder pedal kit.
Details
03-07-2005
12.50
Install main landing gear weldments.
03-06-2005
6.40
Install Rudder pedals, brakes and brake lines
Details
02-21-2005
3.25
Assemble and install control yokes.
Details
02-10-2005
8.25
Install rudder pedals
Details
02-09-2005
4.40
Fit and temp install side cabin covers
Details
02-08-2005
1.50
Install fuel valve selector bracket
Details
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
92
1195
Avionics
13
138
Empennage
10
60
Engine
15
201
Fuselage
40
535
Paint
7
213
Wings
7
48
Copyright © 2001-2024 Matronics. All Rights Reserved.