KitLog pro

Powered By Kitlog Pro v2.0

Air O Enterprises
Work Logs Found: 40
Category Work Time: 535 Hours
 Date
Hours
Work Log Summary

Details

 08-18-2006
2.50
Canopy paint jig
Details
       

 04-30-2006
8.00
Tail intersection ferring
Details
       

 03-20-2006
36.00
Elevator & Rudder tip assembly
Details
       

 03-18-2006
20.00
Horizontal / Vertical stab tips
Details
       

 03-15-2006
36.00
Canopy Skirt
Details
     

 02-05-2006
4.50
Modified oil door
Details
       

 02-05-2006
9.00
Cowl preparation for paint
Details
     

 01-20-2006
24.00
Canopy skirt
Details
     

 01-19-2006
15.00
Windscreen and glareshield
Details
       

 01-18-2006
15.00
Canopy installation
Details
     

 12-21-2005
24.00
Installed front cargo door
Details
       

 12-16-2005
2.00
Installed oil dip-stick door
Details
     

 12-09-2005
45.00
Engine cowl installation
Details
       

 12-08-2005
9.00
Top deck installation
Details
       

 11-20-2005
65.00
Installed cabin interior side walls
       

 11-12-2005
8.00
Installed heater control cables
       

 11-03-2005
7.50
Autopilot and roll trim
     

 10-22-2005
10.00
Installed static and pitot lines
     

 06-27-2005
85.00
Finish wheel pants and strut ferrings
Details
       

 06-26-2005
5.00
Wheel pants and strut ferrings
Details
       

 06-25-2005
3.00
main wiring harness
Details
     

 06-24-2005
5.00
Firewall components
Details
     

 06-17-2005
8.00
install landing gear ferrings, wheels pants
Details
       

 06-12-2005
3.00
wheels and brakes
Details
     

 06-11-2005
5.00
Install rear canopy rail
Details
     

 06-09-2005
2.00
throttle quad and cables
Details
 

 04-20-2005
6.00
Paint Interior
Details
       

 03-22-2005
3.25
Added instrument panel access hole.
Details
       

 03-21-2005
1.75
Allign and fit front windscreen weldment.
Details
     

 03-17-2005
14.50
Install forward top fuselage skin.
Details
     

 03-11-2005
2.25
Attached forward belly skin.
Details
     

 03-10-2005
6.00
Install front seatback weldment.
Details
     

 03-10-2005
3.00
Assembled wheels / tubes / tires.
Details
     

 03-09-2005
5.50
Added rear-seat rudder pedal kit.
Details
     

 03-07-2005
12.50
Install main landing gear weldments.
       

 03-06-2005
6.40
Install Rudder pedals, brakes and brake lines
Details
       

 02-21-2005
3.25
Assemble and install control yokes.
Details
     

 02-10-2005
8.25
Install rudder pedals
Details
     

 02-09-2005
4.40
Fit and temp install side cabin covers
Details
       

 02-08-2005
1.50
Install fuel valve selector bracket
Details
     










Copyright © 2001-2024 Matronics. All Rights Reserved.