KitLog pro

Powered By Kitlog Pro v2.0

Bruces S-19 Build Log
Work Logs Found: 16
Category Work Time: 16 Hours
 Date
Hours
Work Log Summary

Details

 03-13-2019
1.00
Designed and Installed Aft Cowl Support
Details
       

 11-06-2018
1.00
Installed External Power Plug door
Details
       

 09-13-2018
1.00
Oil door
Details
       

 08-07-2018
1.00
Glassed over old scoop location
Details
       

 08-07-2018
1.00
continued fiberglassing cowl
Details
       

 08-04-2018
1.00
Final Cowl Trim
Details
       

 07-30-2018
1.00
Designed, fabricated and installed the landing lig
Details
       

 07-28-2018
1.00
Installed the heater air inlet scoop
Details
       

 07-12-2018
1.00
Built heater air inlet
Details
       

 07-08-2018
1.00
glassed in a lower ramp segment of the duct
Details
       

 06-17-2018
1.00
Glassed in the air scoop into its new location
Details
       

 06-08-2018
1.00
Rebuilt scoop in new location
Details
       

 05-31-2018
1.00
Cut out the old air scoop location
Details
       

 05-30-2018
1.00
Started modifying cowing radiator scoop
Details
       

 01-07-2016
1.00
Cowling trim
Details
       

 01-02-2016
1.00
Started on Cowling
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.