Powered By Kitlog Pro v2.0
Bruces S-19 Build Log
S-19 Venterra
Cowling
Work Logs Found:
16
Category Work Time:
16 Hours
Date
Hours
Work Log Summary
Details
03-13-2019
1.00
Designed and Installed Aft Cowl Support
Details
11-06-2018
1.00
Installed External Power Plug door
Details
09-13-2018
1.00
Oil door
Details
08-07-2018
1.00
Glassed over old scoop location
Details
08-07-2018
1.00
continued fiberglassing cowl
Details
08-04-2018
1.00
Final Cowl Trim
Details
07-30-2018
1.00
Designed, fabricated and installed the landing lig
Details
07-28-2018
1.00
Installed the heater air inlet scoop
Details
07-12-2018
1.00
Built heater air inlet
Details
07-08-2018
1.00
glassed in a lower ramp segment of the duct
Details
06-17-2018
1.00
Glassed in the air scoop into its new location
Details
06-08-2018
1.00
Rebuilt scoop in new location
Details
05-31-2018
1.00
Cut out the old air scoop location
Details
05-30-2018
1.00
Started modifying cowing radiator scoop
Details
01-07-2016
1.00
Cowling trim
Details
01-02-2016
1.00
Started on Cowling
Details
SITE NAVIGATION
Contact Builder
S-19 Venterra Home
Category
# Logs
# Hours
All
460
1984
Aft Fuselage
20
138
Aileron
13
71
Assembly
9
9
Builder
1
Canopy
12
37
Center Fuselage
31
165
Controls
9
15
Cowling
16
16
Demo Flight
2
Distractions
2
Electrical
28
156
Empennage
3
2
Engine
7
8
Fiberglass Tip for V
9
68
Flaps
6
44
Flight Test
5
5
Forward Fuselage
27
139
Fuselage
6
11
FWF
33
57
Horiz Stabilator
29
131
Instruments
42
201
Interiour
6
35
Landing Gear
9
31
Paint
10
10
Project
1
Rudder
11
47
Seats
5
65
Shop
4
Tips
7
0
Tools
3
Trim Tab
1
8
Vertical Stablizer
13
75
Wings
80
440
Copyright © 2001-2024 Matronics. All Rights Reserved.