KitLog pro

Powered By Kitlog Pro v2.0

Davids Web Site
Work Logs Found: 58
Category Work Time: 139 Hours
 Date
Hours
Work Log Summary

Details

 07-23-2017
3.50
Attach fusulage, bulkhead
       

 06-29-2017
3.00
Rudder bottom fairing, gap covers empennage
       

 06-20-2017
1.50
Rear fairing prep on rudder bottom
       

 06-17-2017
4.00
Rudder bottom fairing prep work
       

 06-14-2017
1.00
Tip fairing, and rudder bottom match drilling
       

 06-08-2017
2.00
Fiberglass fabrication for tip fairing
       

 06-04-2017
2.50
Horizontal stabilizer tip fairing-fiberglass
       

 05-09-2017
1.50
Elevator tip
       

 05-06-2017
2.00
Elevator tip- prep work
     

 04-29-2017
3.00
Rudder cable attach, rudder tip install
       

 04-26-2017
2.50
Vertical stab attach, rudder attach, horizontal st
       

 04-23-2017
3.00
Match drill elevator horn, elevator installation
       

 12-31-2016
4.00
install elevator weights, start parts prep for nex
       

 12-29-2016
2.00
final elevator close out,
       

 12-15-2016
2.50
counter sink trailing edge , finish rib installati
       

 12-11-2016
2.00
trim tab trailing edge, rib installation
       

 11-27-2016
3.00
elevator pitch trim harness and servo install
       

 11-22-2016
1.50
trim tab
       

 11-20-2016
2.50
finish up right elevator, apart from trailing edge

 11-17-2016
1.50
right elevator assembly, back rivet ribs
       

 11-09-2016
1.50
right elevator assembly-spar assembly, rib assembl
       

 11-06-2016
2.00
right elevator skin prep, dimple parts, skin
       

 11-05-2016
1.50
prepwork right elevator
       

 10-26-2016
1.50
left elevator, finish up
Details
       

 10-22-2016
3.00
left elevator rear spar, inboard closeout
Details
       

 10-16-2016
4.00
rib&rear spar assembly, left elevator assembly
       

 10-12-2016
3.00
elevator spar assembly
       

 10-05-2016
2.00
tip rib and access doubler preperation
     

 10-04-2016
2.25
dimple elevator skins, prepare edges
       

 09-28-2016
2.00
elevator tim
       

 09-25-2016
2.00
trim tab hinge, dimple skins, tip ribs
       

 09-21-2016
2.00
ribs and spars cleco elevator skins
Details
       

 09-21-2016
2.00
front spar elevator
       

 09-14-2016
2.00
trim tabs
       

 09-01-2016
2.00
finish elevator
       

 08-18-2016
2.00
rivet elevator skins

 08-07-2016
3.00
rivet elevator skins
       

 07-10-2016
2.50
Rivet skins elevator
Details
       

 06-25-2016
2.00
prep ribs, rib tip assembly
       

 06-22-2016
2.00
stringer assembly,nose ribs, inspar ribs,
Details
       

 06-19-2016
4.00
Horizontal stab skin prep,dimple, finish front spa
Details
       

 06-16-2016
2.00
nose ribs, front spar assembly
       

 06-09-2016
2.00
front spar assembly
       

 05-26-2016
2.50
front spar assembly, hinge bracket
       

 05-15-2016
4.50
finish rudder, start horizontal stab, rear spar
       

 05-11-2016
1.00
rivettrailing edge rudder, make templates
       

 05-07-2016
2.00
joining skins leading edge , start trailing edge
       

 05-04-2016
3.50
attaching ribs, joining skins
Details
       

 05-01-2016
2.50
Rudder assembly,
Details
       

 04-10-2016
5.00
Rudder skins stiffners dimple prepare for riveting
Details
       

 04-02-2016
3.00
Rudder assembly
Details
       

 03-31-2016
1.50
rudder assembly
       

 03-23-2016
1.50
Rudder assembly
Details
       

 03-16-2016
2.00
Work on rudder
       

 02-28-2016
2.00
Prepare rudder skins, for riveting
       

 02-21-2016
2.00
Rudder assembly, prepare parts
       

 02-16-2016
3.00
Dimple and Rivet Vertical stabilizer
Details
       

 01-30-2016
2.00
Start tail section, debur, dimple
       










Copyright © 2001-2024 Matronics. All Rights Reserved.