Norris's RV Construction
Work Logs Found: 62
Category Work Time: 338 Hours
 Date
Hours
Work Log Summary

Details

 02-27-2017
9.00
Installed seat belts. Interior cover panels.

 02-26-2017
3.50
Completed the Left main fairing
     

 02-25-2017
2.00
Finished R. Main gear fairings. Started on left.
     

 02-24-2017
7.00
Worked on right gear fairings

 02-23-2017
4.50
Finished up the empenage fairing. Applied N number
       

 02-21-2017
5.00
Finished nutplating the main gear wheel pants

 02-20-2017
9.00
Made both main gear leg fairings
       

 02-17-2017
9.00
Installed nose gear strut fairing and bottom cowl
     

 02-16-2017
3.00
Install nutplates on nose gear faring.

 02-15-2017
9.50
Nose gear fairing. Trim, fit, and align
     

 02-14-2017
6.50
Left main gear and nose gear wheel pants
Details
       

 02-13-2017
5.50
Working on Left main gear wheel pants

 02-11-2017
2.00
Continue fitting the Right wheel pant
     

 02-10-2017
5.00
Started on the R Main wheelpants

 01-20-2017
5.00
Installed glare shield cover and AOA indicator
       

 01-16-2017
3.00
Continue wireing canopy lights and micropswitch
     

 01-13-2017
7.00
Canopy alignment pins. Closed microswitch.
       

 01-12-2017
8.00
/finiahing and adjusting canopy. Reweighed plane.
     

 01-11-2017
4.00
Canopy - sanding, filling, sanding, resin coat

 01-10-2017
9.00
Shaping sanding of canopy
     

 01-09-2017
8.00
Fiberglass layup on the canopy
     

 01-06-2017
6.50
various
Details

 01-05-2017
6.00
Multiple items
Details

 01-04-2017
7.00
Continue canopy work
     

 01-03-2017
4.00
Continue wowrking on the Canopy.

 01-02-2017
8.00
Canopy - attach side rails and canopy to frame

 12-30-2016
6.00
Drilled and countersunk the canopy. sand cowl.

 12-29-2016
3.00
Adjusting canopy so it lowers and latches smoothly

 12-27-2016
8.50
Fitted and initial drilled the canopy
     

 12-26-2016
6.50
Fitting canopy
     

 12-15-2016
4.00
Installed the rear canopy
     

 12-14-2016
4.00
dimpled and countersunk for rear window

 12-13-2016
3.00
tapped the 6-32 holes in window and fitted front e
     

 12-12-2016
6.00
Fitted and drilled holes for bagage window

 12-05-2016
4.00
Aligning the bagage compartment plexiglass

 09-20-2016
7.00
Install seats and work on grouping wiring

 09-13-2016
5.00
Seat heaters switch and install seat floors

 08-22-2016
6.00
Putting in adel clamp

 08-19-2016
1.00
Installed foot steps
     

 07-21-2016
3.00
Worked on leaking left brake line

 07-20-2016
8.00
Start fitting and installing wing root fairings

 07-19-2016
8.00
Charge brakes with fluid. Adjust flaps.

 07-18-2016
4.00
Conncect and program flaps
     

 07-14-2016
4.00
Connect and align ailerons

 07-07-2016
6.00
Installed nose gear and balanced and installed whe
     

 05-20-2016
3.00
Installed parking brake bracket and valve
     

 05-19-2016
2.00
Constructed bracket for parking brake

 05-10-2016
6.50
Main gear installedd and rotator dismantled
     

 05-09-2016
4.00
Pack wheel bearings, mount and Balance tires

 05-06-2016
6.50
Align gear legs for toe in/ toe out

 05-05-2016
3.00
Adjusting and fitting to get right main gear on

 03-09-2016
9.50
Installed canopy latch including a key lock
       

 03-01-2016
8.00
Emergency release pins
Details
     

 02-26-2016
9.00
Assembled and riveted canopy

 02-25-2016
4.50
Disasemble canopy frame, prep, assemble for riveti

 02-24-2016
2.00
Rear canopy handle

 02-24-2016
6.00
Completed canopy side rails. Not riveted yet.
     

 02-23-2016
2.00
Canopy side rails

 02-12-2016
2.00
Installed a flap position sensor
     

 02-10-2016
7.00
Assembly of the canopy forward structure
     

 02-09-2016
2.00
Begin building the canopoy frame

 01-28-2016
8.00
Inventory finish kit and start masking for paint