Date
|
Hours
|
Work Log Summary
|
Details
|
02-27-2017
|
9.00
|
Installed seat belts. Interior cover panels.
|
|
|
|
02-26-2017
|
3.50
|
Completed the Left main fairing
|
|
|
|
02-25-2017
|
2.00
|
Finished R. Main gear fairings. Started on left.
|
|
|
|
02-24-2017
|
7.00
|
Worked on right gear fairings
|
|
|
|
02-23-2017
|
4.50
|
Finished up the empenage fairing. Applied N number
|
|
|
|
02-21-2017
|
5.00
|
Finished nutplating the main gear wheel pants
|
|
|
|
02-20-2017
|
9.00
|
Made both main gear leg fairings
|
|
|
|
02-17-2017
|
9.00
|
Installed nose gear strut fairing and bottom cowl
|
|
|
|
02-16-2017
|
3.00
|
Install nutplates on nose gear faring.
|
|
|
|
02-15-2017
|
9.50
|
Nose gear fairing. Trim, fit, and align
|
|
|
|
02-14-2017
|
6.50
|
Left main gear and nose gear wheel pants
|
Details
|
|
|
02-13-2017
|
5.50
|
Working on Left main gear wheel pants
|
|
|
|
02-11-2017
|
2.00
|
Continue fitting the Right wheel pant
|
|
|
|
02-10-2017
|
5.00
|
Started on the R Main wheelpants
|
|
|
|
01-20-2017
|
5.00
|
Installed glare shield cover and AOA indicator
|
|
|
|
01-16-2017
|
3.00
|
Continue wireing canopy lights and micropswitch
|
|
|
|
01-13-2017
|
7.00
|
Canopy alignment pins. Closed microswitch.
|
|
|
|
01-12-2017
|
8.00
|
/finiahing and adjusting canopy. Reweighed plane.
|
|
|
|
01-11-2017
|
4.00
|
Canopy - sanding, filling, sanding, resin coat
|
|
|
|
01-10-2017
|
9.00
|
Shaping sanding of canopy
|
|
|
|
01-09-2017
|
8.00
|
Fiberglass layup on the canopy
|
|
|
|
01-06-2017
|
6.50
|
various
|
Details
|
|
|
01-05-2017
|
6.00
|
Multiple items
|
Details
|
|
|
01-04-2017
|
7.00
|
Continue canopy work
|
|
|
|
01-03-2017
|
4.00
|
Continue wowrking on the Canopy.
|
|
|
|
01-02-2017
|
8.00
|
Canopy - attach side rails and canopy to frame
|
|
|
|
12-30-2016
|
6.00
|
Drilled and countersunk the canopy. sand cowl.
|
|
|
|
12-29-2016
|
3.00
|
Adjusting canopy so it lowers and latches smoothly
|
|
|
|
12-27-2016
|
8.50
|
Fitted and initial drilled the canopy
|
|
|
|
12-26-2016
|
6.50
|
Fitting canopy
|
|
|
|
12-15-2016
|
4.00
|
Installed the rear canopy
|
|
|
|
12-14-2016
|
4.00
|
dimpled and countersunk for rear window
|
|
|
|
12-13-2016
|
3.00
|
tapped the 6-32 holes in window and fitted front e
|
|
|
|
12-12-2016
|
6.00
|
Fitted and drilled holes for bagage window
|
|
|
|
12-05-2016
|
4.00
|
Aligning the bagage compartment plexiglass
|
|
|
|
09-20-2016
|
7.00
|
Install seats and work on grouping wiring
|
|
|
|
09-13-2016
|
5.00
|
Seat heaters switch and install seat floors
|
|
|
|
08-22-2016
|
6.00
|
Putting in adel clamp
|
|
|
|
08-19-2016
|
1.00
|
Installed foot steps
|
|
|
|
07-21-2016
|
3.00
|
Worked on leaking left brake line
|
|
|
|
07-20-2016
|
8.00
|
Start fitting and installing wing root fairings
|
|
|
|
07-19-2016
|
8.00
|
Charge brakes with fluid. Adjust flaps.
|
|
|
|
07-18-2016
|
4.00
|
Conncect and program flaps
|
|
|
|
07-14-2016
|
4.00
|
Connect and align ailerons
|
|
|
|
07-07-2016
|
6.00
|
Installed nose gear and balanced and installed whe
|
|
|
|
05-20-2016
|
3.00
|
Installed parking brake bracket and valve
|
|
|
|
05-19-2016
|
2.00
|
Constructed bracket for parking brake
|
|
|
|
05-10-2016
|
6.50
|
Main gear installedd and rotator dismantled
|
|
|
|
05-09-2016
|
4.00
|
Pack wheel bearings, mount and Balance tires
|
|
|
|
05-06-2016
|
6.50
|
Align gear legs for toe in/ toe out
|
|
|
|
05-05-2016
|
3.00
|
Adjusting and fitting to get right main gear on
|
|
|
|
03-09-2016
|
9.50
|
Installed canopy latch including a key lock
|
|
|
|
03-01-2016
|
8.00
|
Emergency release pins
|
Details
|
|
|
02-26-2016
|
9.00
|
Assembled and riveted canopy
|
|
|
|
02-25-2016
|
4.50
|
Disasemble canopy frame, prep, assemble for riveti
|
|
|
|
02-24-2016
|
2.00
|
Rear canopy handle
|
|
|
|
02-24-2016
|
6.00
|
Completed canopy side rails. Not riveted yet.
|
|
|
|
02-23-2016
|
2.00
|
Canopy side rails
|
|
|
|
02-12-2016
|
2.00
|
Installed a flap position sensor
|
|
|
|
02-10-2016
|
7.00
|
Assembly of the canopy forward structure
|
|
|
|
02-09-2016
|
2.00
|
Begin building the canopoy frame
|
|
|
|
01-28-2016
|
8.00
|
Inventory finish kit and start masking for paint
|
|
|