KitLog pro

Powered By Kitlog Pro v2.0

Steve & Nancy Riffe
Work Logs Found: 64
Category Work Time: 179 Hours
 Date
Hours
Work Log Summary

Details

 11-27-2016
1.00
Primer touch up on cowl
Details
       

 11-26-2016
2.00
Added filler for upper/lower transition
Details
       

 10-01-2016
1.00
Cowling foil-2
Details
       

 09-30-2016
2.00
Cowling foil-1
Details
       

 09-15-2016
4.00
Pink be gone! Cowling finished!
Details
       

 09-14-2016
4.00
Upper cowl done-lower needs final primer
Details
       

 09-10-2016
3.00
Upper-final sanding primer applied
Details
       

 09-09-2016
6.00
More cowling work
Details
       

 09-05-2016
5.00
Sanding glass on upper cowling
Details

 09-04-2016
3.00
Cowling work--continues
Details
     

 09-03-2016
4.00
Removed sanding primer from upper cowl
Details
       

 08-27-2016
3.00
Apply sanding primer to upper, resin to lower
Details
       

 08-25-2016
2.00
Apply resin/acetone mix to cowlings
Details
       

 08-24-2016
3.00
Finish oil door, more cowl work
Details
       

 08-23-2016
3.00
Oil door fitting, continue cowl work
Details
       

 08-19-2016
1.00
Cowl work-10, oil door hinge
Details
       

 08-18-2016
2.00
Cowl work-9, oil filler door work
Details
       

 08-16-2016
3.00
Cowl work-8
Details
       

 08-15-2016
3.00
Cowl work-7
Details

 08-14-2016
2.00
Cowl work-6
Details
       

 08-13-2016
3.00
Oil door-latches
Details
       

 08-13-2016
3.00
Cowl work 5
Details

 08-11-2016
4.00
Cowl work-4
Details

 08-10-2016
6.00
More cowling work-3
Details
     

 08-07-2016
3.00
Sanding & filling cowl-2
Details
       

 08-05-2016
5.00
Still filling & sanding cowlings
Details
       

 08-02-2016
2.00
Sanding upper & lower cowling
Details
       

 07-31-2016
2.00
Hinge pin cover work
Details
       

 07-28-2016
1.00
Glass around pin covers, rivet oil door hinge
Details
       

 07-27-2016
1.00
Fit hinge pins
Details
       

 07-26-2016
1.00
Rivet hinge to left side of cowl
Details
       

 07-25-2016
1.00
Rivet right hinge to upper cowl
Details
       

 07-17-2016
3.00
Oil door--hinge attachment
Details
       

 07-12-2016
1.00
Oil filler door-1
Details
       

 07-06-2016
4.00
Fuel pump overflow line
Details
       

 07-05-2016
5.00
Finish lower attach plates
Details
       

 07-04-2016
2.00
Work on lower cowl mounting plates
Details
       

 07-03-2016
2.00
More hi temp paint inside cowlings
Details
       

 03-15-2016
4.00
Rivet horizontal hinges-lower cowling
Details
       

 03-12-2016
1.00
Prep horizontal hinges for riveting
Details
       

 02-27-2016
3.00
Cowling nose and hinge pin covers
Details
       

 02-26-2016
1.00
Cowling nose work-4
Details
       

 02-25-2016
1.00
Cowling Nose Work-3
Details
       

 02-24-2016
2.00
Cowling nose work-2
Details
       

 02-23-2016
3.00
Cowling noes work-1
Details
       

 02-21-2016
3.00
Re-do vertical hinges, work on face of cowl
Details
       

 02-20-2016
2.00
R. side cowling mis-match
Details
       

 02-19-2016
2.00
L. side cowling mis-match
Details
       

 02-18-2016
3.00
Rivet long hinge-upper cowl, fab retainer
Details
       

 02-17-2016
2.00
Rivet upper cowl short hinge
Details
       

 02-16-2016
3.00
More fitting upper cowl-vertical hinge issue
Details

 02-15-2016
5.00
Rivet vertical hinges-skin side
Details
       

 02-13-2016
4.00
Drill upper horizontal hinges
Details
       

 02-13-2016
3.00
Drill lower horizontal hinge
Details
       

 02-09-2016
2.00
Trimmed cowlings--horizontal fittment
Details
       

 02-08-2016
3.00
Drill lower cowl vertical hinges
Details
       

 02-07-2016
3.00
Rivet lower hinges, drill vertical hinges
Details
       

 02-05-2016
4.00
Fit lower cowl to bottom, drilled lower hinges
Details
       

 02-04-2016
3.00
Fabbed upper shim strips, sanded for 1/16"gap
Details
       

 02-03-2016
4.00
Fab lower hinges, trim lower cowl aft
Details
       

 01-31-2016
3.00
Drill & cleco aft part of top cowling
Details
       

 01-30-2016
4.00
Trim aft part of top cowl
Details
       

 01-28-2016
3.00
Matching front of upper & lower cowling-1
Details
       

 01-27-2016
2.00
Fitting top cowl-1
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.