Christopher's Web Site
Safari 400
Electrical
Work Logs Found:
54
Category Work Time:
182 Hours
Date
Hours
Work Log Summary
Details
03-09-2017
3.00
Exterior Wires, Antenna Coax, Data Plate
Details
03-08-2017
2.00
Wires, CHT wire, clean interior
Details
03-07-2017
3.00
Governor wiring, wire tying governor, swap fuel se
Details
02-05-2017
2.00
Wire, fuel, and Calibrate Fuel Tanks
Details
02-04-2017
1.50
Transmission Tachometer and Temp gauge Installatio
Details
01-29-2017
1.50
Trim Motor Connection Redo
Details
01-28-2017
1.50
Headboard Wiring Inspection
Details
01-27-2017
2.00
Compass and Intake Filter Installation
Details
01-22-2017
1.00
Communication Antenna Coax Connection
Details
01-20-2017
2.00
Transponder Temp Probe / TR Control Cable
Details
01-19-2017
0.50
APU Plug Repair
Details
01-17-2017
4.00
Wire Bundling/Closed up console and floor
Details
01-15-2017
3.00
Light for console switches/ TR cable clamps
Details
01-11-2017
4.00
Connect Aft Nav and Strobe light/Tail Boom Ground
Details
01-08-2017
5.00
Install Tail Boom (Continued)/ Mount Mid-Boom Beac
Details
01-06-2017
3.00
Non-Skid Shaping and Installation / OAT Probe Inst
Details
01-05-2017
5.00
Seatbelt Installation / Collective Tension Spring
Details
01-04-2017
3.50
Alternator Wiring / Starter Loop Wiring
Details
01-03-2017
4.50
E-Mag Wiring / Fan Indicator Light
Details
01-02-2017
2.00
Antenna Mount Fabrication
Details
01-01-2017
8.00
Mag Switch Wiring / Hanger Organization / Antenna
Details
12-31-2016
4.00
Oil Sender Switch Install (Continued)/ Power Up
Details
12-31-2016
2.50
East Coast Visit / APU Plug
Details
12-31-2016
4.50
Battery Installation / Ground Bus Connection / Bat
Details
12-22-2016
1.50
Starter Wiring
Details
12-22-2016
1.50
Landing Light Wiring
Details
12-21-2016
3.00
More Wiring
Details
12-15-2016
2.50
E-Mag Fuses/Switches
Details
12-14-2016
3.50
Fuel Tank Wiring
Details
12-01-2016
2.50
Fuel Sensor Probe Installation
Details
11-30-2016
2.00
Fuel Sensor Probe Sizing
Details
11-28-2016
4.00
Pitch Trim motor Installation and Trim Wiring
Details
11-27-2016
2.50
Grounding Bus and Wiring
Details
11-26-2016
1.50
CHT Probe Wiring
Details
11-24-2016
2.00
Tail Boom Wiring
Details
11-23-2016
4.00
Console Wiring and 2nd Master Bus
Details
11-22-2016
3.00
Transponder Installation
Details
11-20-2016
4.50
Cyclic Wiring
Details
11-20-2016
2.50
Collective Wiring
Details
11-18-2016
2.50
Fuel Shut Off Lever and Navigation Lights
Details
11-17-2016
3.00
Headset Jacks
Details
03-10-2016
8.00
Instrument Panel and Pod Completion
Details
03-07-2016
23.00
Pod and cabin Wiring
Details
02-15-2016
2.50
Tach Gauge Wiring
Details
02-14-2016
2.00
Quad Gauge Wiring Harness
Details
02-13-2016
1.75
Wiring Indicator Lights Complete
Details
02-10-2016
2.75
REALLY Beginning the Wiring Process
Details
02-02-2016
2.00
Control Rod Clearance Issue
Details
01-30-2016
9.00
Wiring & Roll Trim
Details
01-29-2016
3.50
Heat Levers – Battery Box – Switches
Details
01-28-2016
1.00
Exterior Power Plug
Details
01-24-2016
5.00
Mixture/Nav Lights/ Ext. Power/ Transponder/Pod Vi
Details
01-21-2016
2.00
Breaker/Switches Installed and Console Assembled
Details
01-17-2016
0.00
EAA Electrical Workshop
Details
SITE NAVIGATION
Contact Builder
RV-14A Home
Safari 400 Home
Category
# Logs
# Hours
All
304
955
Avionics
12
29
Cabin
35
170
Certification
3
CHR Pre-shipping
4
Electrical
54
182
Engine
55
178
Exterior
24
93
Flight Controls
14
41
Interior
46
124
Landing Skids
6
24
Main Rotor
9
23
Miscellaneous
11
18
Painting
9
3
Rigging
7
16
Shop & Tools
6
22
Shop Supplies
1
Tail Rotor
4
14
Unpack & Inventory
3
12
Weight & Balance
1
6